1Formulas and methods

Beam support reactions

Equilibrium
ΣFx = 0, ΣFy = 0, ΣM = 0
Uniform load
resultant w·L at the middle of the load
Moment
M = F·d

Method

  1. Draw a free-body diagram and replace each support by its reactions.
  2. Replace every distributed load by a single force at its centroid.
  3. Take moments about one support to find the reaction at the other.
  4. Use ΣFy = 0 to find the remaining reaction, and check with a second moment equation.

Truss: method of joints

Method of joints
ΣFx = 0, ΣFy = 0 at each joint
Method of sections
ΣM = 0 about a cut point
Member force
positive = tension, negative = compression

Method

  1. Find the support reactions for the whole truss.
  2. Method of joints: start at a joint with at most two unknown member forces and use ΣFx = 0 and ΣFy = 0.
  3. Method of sections: cut through the member you need and take moments about a point where the other unknown members meet.
  4. Assume tension; a negative answer means compression.

Shear force & bending moment

Shear and moment
V = ΣF on one side, M = ΣF·d on one side
Bending stress
σ = M·y/I
Rectangle
I = bh³/12
Section modulus
W = I/ymax
Simply supported, uniform load
Mmax = wL²/8

Method

  1. Find the support reactions from equilibrium of the whole beam.
  2. Cut the beam at the section you need and keep one side.
  3. Shear force: sum of the vertical forces on that side. Bending moment: sum of their moments about the cut.
  4. For the maximum moment, find where the shear force is zero.

Beam deflection

Point load at midspan
δ = PL³/(48EI)
Uniform load, simply supported
δ = 5wL⁴/(384EI)
Cantilever, end load
δ = PL³/(3EI)
Cantilever, uniform load
δ = wL⁴/(8EI)
Superposition
δ = δ1 + δ2

Column buckling

Euler load
Pcr = π²EI/(KL)²
Effective length factor
K = 1 pinned–pinned, 0.5 fixed–fixed, 0.7 fixed–pinned, 2 fixed–free
Critical stress
σcr = Pcr/A
Slenderness
λ = KL/r, r = √(I/A)

Centroid & second moment of area

Centroid
ȳ = ΣAiyi/ΣAi
Rectangle
I = bh³/12
Parallel-axis theorem
I = Ic + A·d²
Composite section
I = Σ(Ic,i + Aidi²)

Effective stress in soil

Total stress
σ = Σγi·hi
Pore water pressure
u = γw·(z − zw)
Effective stress
σ′ = σ − u
Water
γw = 9.81 kN/m³

Consolidation settlement

Normally consolidated
S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0)
Final stress
σ′f = σ′0 + Δσ (at mid-depth of the layer)
Overconsolidated, σ′f ≤ σ′p
S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0)
Overconsolidated, σ′f > σ′p
S = H/(1 + e0)·[Cr·log₁₀(σ′p/σ′0) + Cc·log₁₀(σ′f/σ′p)]
Overconsolidation ratio
OCR = σ′p/σ′0
Time for consolidation
t = Tv·Hdr²/cv
Drainage path
Hdr = H/2 (double drainage), H (single drainage)
Time factors
U 50% → 0.197, 60% → 0.287, 70% → 0.403, 80% → 0.567, 90% → 0.848

Hydrostatic force

Pressure at depth
p = ρgh
Force on a vertical wall
F = ρg·hc·A
Centre of pressure
yp = yc + Ic/(ycA)
Rectangle
Ic = bH³/12

Pipe friction & head loss

Reynolds number
Re = V·D/ν = ρ·V·D/μ
Flow regime
laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)

Open-channel flow (Manning)

Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²

Pumps & pump power

Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)

Time value of money

Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i

Method

  1. Draw a timeline with every cash flow and its timing.
  2. Match the rate to the period: a monthly rate for monthly payments.
  3. Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
  4. Check the sign and the order of magnitude of the answer.

NPV & IRR

Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)

Method

  1. List all cash flows with their year; the investment at year 0 is negative.
  2. Discount each cash flow: CFt/(1 + r)t.
  3. Add them up to get the NPV. Positive means the project earns more than r.
  4. For the IRR, find the rate that makes NPV zero by trial or interpolation.

Normal distribution

z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ

Method

  1. Convert the value to a z-score: z = (x − μ)/σ.
  2. Look up Φ(z), the area to the left of z.
  3. For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
  4. For a percentile, work backwards: find z for the area, then x = μ + z·σ.

2Practice problems

1.Beam support reactionsMedium
P = 70 kNM = 20 kN·mABRA​ = ?2 m1.5 m1.5 m

The simply supported beam has a pin at A and a roller at B. It carries a point load P at 2 m from A and a clockwise couple M at 3.5 m from A. Find the vertical reaction RA, taking upward as positive.

L = 5 mP = 70 kN at 2 mM = 20 kN·m (clockwise) at 3.5 m
RA = kN
2.Beam support reactionsHard
P = 10 kN, 40°Q = 60 kNABRA​ = ?2 m2 m2 m

The simply supported beam has a pin at A and a roller at B. A load P acts at 4 m from A, inclined at 40° to the horizontal, and a vertical load Q acts at 2 m from A. Find the magnitude of the total reaction force RA at the pin A.

L = 6 mP = 10 kN at 4 m, θ = 40°Q = 60 kN at 2 m
RA = kN
3.Truss: method of jointsMedium
ABBCACACB60 kN4 m3 m2 m

Use the method of joints to find the force FAB in member AB. Give tension as positive and compression as negative.

span = 4 mheight = 2 mB is 3 m from Avertical load = 60 kN
FAB = kN
4.Truss: method of jointsHard
ABCDEFGH15 kN20 kN30 kN25 kN25 kN4 × 3 m3 m

Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.

B: 15 kN ↓C: 20 kN ↓D: 30 kN ↓F: 25 kN ↓F: 25 kN →
  1. 1member AB
  2. 2member BC
  3. 3member CD
  4. 4member DE
  5. 5member FG
  6. 6member GH
  7. 7member AF
  8. 8member HE
  9. 9member BF
  10. 10member CG
  11. 11member DH
  12. 12member FC
  13. 13member HC
5.Shear force & bending momentMedium
w = 8 kN/mABsection8 m2 m

Find the bending moment Mx at the section x = 8 m from support A. Use sagging moments positive and upward shear on the left face positive.

L = 10 mw = 8 kN/m from 0 to 10 mx = 8 m
Mx = kN·m
6.Shear force & bending momentHard
10 kN/m20 kN40 kN30 kNABCDEFG1 m1 m1 m1 m1 m1 m

The marks A to G split the beam into six equal parts. At which mark is the bending moment largest in size, sagging or hogging? Click it in the diagram.

20 kN @ 0 m40 kN @ 6 m30 kN @ 3 m10 kN/m, 1–5 m
  1. 1A (x = 0 m)
  2. 2B (x = 1 m)
  3. 3C (x = 2 m)
  4. 4D (x = 3 m)
  5. 5E (x = 4 m)
  6. 6F (x = 5 m)
  7. 7G (x = 6 m)
7.Beam deflectionMedium
w = 2 kN/mδL = 1.5 m

A cantilever carries a uniformly distributed load w over its whole length. Find the deflection δ at the free end.

w = 2 kN/mL = 1.5 mE = 11 GPa (timber)I = 23 × 10⁶ mm⁴
δ = mm
8.Beam deflectionHard
w = 2.5 kN/mABδ4 m

A simply supported timber beam of rectangular section, 150 mm wide, carries a uniformly distributed load w over its whole span. Its midspan deflection may not exceed span/250. Find the smallest depth hreq of the section.

w = 2.5 kN/mL = 4 mE = 11 GPa (timber)b = 150 mm
hreq = mm
9.Column bucklingMedium
PL = 6 m40 × 100 mmcross-section

A column of length L made of steel is fixed at both ends. Using Euler’s formula, find its critical buckling load Pcr.

L = 6 mE = 200 GPa (steel)b × h = 40 × 100 mm
Pcr = kN
10.Column bucklingHard
PL = 4 md = 25 mmcross-section

A column of length L made of steel is fixed at the base and pinned at the top. Find its slenderness and the critical buckling stress σcr from Euler’s formula.

L = 4 mE = 200 GPa (steel)d = 25 mm
σcr = MPa
11.Centroid & second moment of areaMedium
280170t = 10xdimensions in mm

A channel section lies with its open side up: a base plate 280 mm wide with two upright legs, 170 mm high overall. Base and legs are all 10 mm thick. Find its second moment of area Ix about the horizontal axis x through its centroid.

b = 280 mmh = 170 mmt = 10 mm
Ix = × 10⁶ mm⁴
12.Centroid & second moment of areaHard
1401528010xM = 15 kN·mdimensions in mm

The T-section is used as a beam with the flange on top and carries a sagging bending moment of 15 kN·m. Find the bending stress σbottom at the bottom edge.

bf = 140 mmtf = 15 mmtw = 10 mmhw = 280 mmM = 15 kN·m
σbottom = MPa
13.Effective stress in soilMedium
sandγd​ = 15 kN/m³γsat​ = 20.5 kN/m³7 mwater tableXz = 5 m

For the soil profile shown, find the pore water pressure u at point X.

z = 5 mzw = 1 mγw = 9.81 kN/m³sand: γd = 15 kN/m³sand: γsat = 20.5 kN/m³
u = kPa
14.Effective stress in soilHard
sandγd​ = 17 kN/m³γsat​ = 20 kN/m³3 mclayγsat​ = 18.5 kN/m³6 mwater tableXz = 6 m

For the soil profile shown, find the total vertical stress σ at point X.

z = 6 mzw = 2 mγw = 9.81 kN/m³sand: γd = 17 kN/m³sand: γsat = 20 kN/m³clay: γsat = 18.5 kN/m³
σ = kPa
15.Consolidation settlementMedium
Δσ = 120 kPasandclayCc​ = 0.2, Cr​ = 0.03e0​ = 1.05σ′0​ = 120 kPaσ′p​ = 160 kPa3 mwater table

A 3 m thick overconsolidated clay layer has Cc = 0.2, Cr = 0.03 and e₀ = 1.05. At its mid-depth the effective vertical stress is 120 kPa and the preconsolidation pressure is 160 kPa. A new building adds 120 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.

H = 3 mCc = 0.2Cr = 0.03e0 = 1.05σ′0 = 120 kPaσ′p = 160 kPaΔσ = 120 kPa
S = mm
16.Consolidation settlementHard
sandclayH = 4 mcv​ = 3 m²/year4 mimpervious rockwater table

A clay layer 4 m thick has a coefficient of consolidation cv = 3 m²/year. It lies on impervious rock, with sand above it, so water drains out only at the top. For 60% average consolidation the time factor is Tv = 0.287. How many years t does the layer take to reach 60% consolidation?

H = 4 mcv = 3 m²/yearU = 60%Tv = 0.287single drainage
t = years
17.Hydrostatic forceMedium
gated = 2 mH = 2.5 m

A vertical rectangular gate 3 m wide sits in the wall of a tank of water, with its top edge 2 m below the surface. Find the resultant hydrostatic force F on the gate.

d = 2 mH = 2.5 mb = 3 mρ = 1000 kg/m³g = 9.81 m/s²
F = kN
18.Hydrostatic forceHard
gated = 1.5 mH = 1.5 m

A vertical rectangular gate 2 m wide sits in the wall of a tank of water, with its top edge 1.5 m below the surface. Find the depth ycp of the centre of pressure below the surface.

d = 1.5 mH = 1.5 mb = 2 mρ = 1000 kg/m³g = 9.81 m/s²
ycp = m
19.Pipe friction & head lossMedium
Q = 5 L/sD = 75 mmL = 200 mf = 0.028

Water flows at 5 L/s through a pipe 200 m long with an inside diameter of 75 mm. Use the Darcy friction factor f = 0.028 and g = 9.81 m/s². Find the friction head loss hf.

Q = 5 L/sL = 200 mD = 75 mmf = 0.028g = 9.81 m/s²
hf = m
20.Pipe friction & head lossHard
K = 10Δz = ?L = 200 m, D = 200 mm, f = 0.0224× bend (K = 0.3)

Two open reservoirs are joined by a pipe 200 m long with an inside diameter of 200 mm and a Darcy friction factor f = 0.022. The minor losses are a square-edged entrance (K = 0.5), 4 bends (K = 0.3 each), a valve (K = 10) and the exit into the lower reservoir (K = 1.0). Use g = 9.81 m/s². What difference in water level Δz between the reservoirs gives a flow rate of 100 L/s?

Q = 100 L/sL = 200 mD = 200 mmf = 0.022Kentrance = 0.5Kbend = 0.3 (×4)Kvalve = 10Kexit = 1.0
Δz = m
21.Open-channel flow (Manning)Medium
b = 5 my = 0.7 m3 : 1n = 0.03, S = 0.004

A trapezoidal grass-lined earth channel has a bottom width of 5 m and side slopes of 3:1 (horizontal:vertical). Water flows uniformly 0.7 m deep. Manning n = 0.03 and the bed slope is S = 0.004. Find the flow rate Q in m³/s.

b = 5 my = 0.7 mz = 3n = 0.03S = 0.004
Q = m³/s
22.Open-channel flow (Manning)Hard
b = 5.5 my = 0.5 m1.5 : 1n = 0.025, Q = 3.2 m³/s

A trapezoidal gravel channel with a bottom width of 5.5 m and side slopes of 1.5:1 (horizontal:vertical) must carry 3.2 m³/s in uniform flow at a depth of 0.5 m. Manning n = 0.025. Find the required bed slope S (in m/m).

Q = 3.2 m³/sb = 5.5 my = 0.5 mz = 1.5n = 0.025
S = m/m
23.Pumps & pump powerMedium
PQ = 40 L/sH = 36 m

In a test, a pump delivers 40 L/s of water (ρ = 1000 kg/m³) against a head of 36 m while its shaft takes 23.5 kW. Use g = 9.81 m/s². Find the pump efficiency η in percent.

Q = 40 L/sH = 36 mPshaft = 23.5 kWg = 9.81 m/s²
η = %
24.Pumps & pump powerHard
400 kPa (gauge)PQ = 15 L/sΔz = 14 mL = 100 m, D = 100 mm, f = 0.022, ΣK = 8

A pump moves 15 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 14 m higher. The pipe is 100 m long with an inside diameter of 100 mm and a Darcy friction factor f = 0.022; the minor-loss coefficients add up to ΣK = 8 (entrance and exit included). Use g = 9.81 m/s². The upper tank is closed and the air above its water is at a gauge pressure of 400 kPa. Find the head H the pump must add.

Q = 15 L/sΔz = 14 mL = 100 mD = 100 mmf = 0.022ΣK = 8ptank = 400 kPa
H = m
25.Time value of moneyMedium
years0123…19PV = ?€1 500€1 500€1 500€1 500

An annuity pays €1 500 at the end of each year for 19 years. The interest rate is 5% per year. Find the present value PV of the annuity.

A = €1 500i = 5%n = 19
PV = €
26.Time value of moneyHard
years0123…8€1 000€1 000€1 000FV = ?

You deposit €1 000 at the start of every year for 8 years, the first deposit today. The account pays 6% per year. How much is in the account at the end of year 8? Find FV.

A = €1 000i = 6%n = 8
FV = €
27.NPV & IRRMedium
years0123−30 00013 00013 0007 000

An investment of €30 000 gives these cash flows at the end of years 1 to 3: €13 000, €13 000, €7 000. The cost of capital is 8%. Find the net present value NPV.

r = 8%CF0 = −30 000CF1 = 13 000CF2 = 13 000CF3 = 7 000
NPV = €
28.NPV & IRRHard
years012−50 00031 00032 500

A project costs €50 000 and returns €31 000, €32 500 at the end of years 1 to 2. Find its internal rate of return IRR in percent.

CF0 = −50 000CF1 = 31 000CF2 = 32 500
IRR = %
29.Normal distributionMedium
77.5127P = ?

The IQ scores are normally distributed with mean 100 points and standard deviation 15 points. What fraction lies between 77.5 and 127 points? Give P as a decimal.

μ = 100σ = 15x1 = 77.5x2 = 127
P =
30.Normal distributionHard
4 s0X − Y?

Runner A's lap time X and runner B's lap time Y are independent and normal: X has mean 52 s and standard deviation 4 s, Y has mean 48 s and standard deviation 3 s. Find the probability P that X is greater than Y. Round z to two decimals.

μX = 52 s, σX = 4 sμY = 48 s, σY = 3 s
P =

3Solutions

1.Beam support reactions

Answer: RA = 38 kN

Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Replace each distributed load by its resultant (its area) acting at the centroid of the load diagram, and take moments about a support to remove that support’s reaction from the equation.

Moments about A

Counter-clockwise positive.

ΣMA = 0: RB·5 − 70·2 − 20 = 0
RB = 160/5 = 32 kN

Vertical equilibrium

RA = 70 − 32 = 38 kN

Answer

RA = 38 kN

A negative reaction acts downward.

2.Beam support reactions

Answer: RA = 42.83 kN

Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Replace each distributed load by its resultant (its area) acting at the centroid of the load diagram, and take moments about a support to remove that support’s reaction from the equation.

Components of P

Pv = 10·sin 40° = 6.428 kN
Ph = 10·cos 40° = 7.66 kN

Reactions

ΣMA = 0: RB·6 = 6.428·4 + 60·2 → RB = 24.29 kN
Ay = 6.428 + 60 − 24.29 = 42.14 kN
Ax = Ph = 7.66 kN

Resultant at A

RA = √(7.66² + 42.14²) = 42.83 kN

Answer

RA = 42.83 kN
3.Truss: method of joints

Answer: FAB = −27.04 kN

Method of joints: every pin of a truss is in equilibrium, so ΣFx = 0 and ΣFy = 0 at each joint. Start at a joint with at most two unknown member forces. A negative result means the member is in compression.

ABBCACACB60 kNAy​Cy​

Support reactions

Equilibrium of the whole truss. Moments about A, counter-clockwise positive.

ΣMA = 0: Cy·4 = 60·3 → Cy = 45 kN
ΣFy = 0: Ay = 60 − 45 = 15 kN

Joint A

Assume every member is in tension (pulling away from the joint). Only AB has a vertical component at A.

sin α = 2/3.606 = 0.5547
ΣFy = 0: Ay + FAB·sin α = 0
FAB = −15/0.5547 = −27.04 kN

Answer

FAB = −27.04 kN (compression)
4.Truss: method of joints

Answer: member CG

Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.

Joint G

FG and GH lie on one straight line and the joint carries no load. Balancing forces across that line leaves only CG.

ΣF⊥ = 0 → FCG = 0

Check with the method of joints

Solving all joints gives these member forces (T = tension, C = compression).

AB: 66.25 kN (T), BC: 66.25 kN (T), CD: 48.75 kN (T), DE: 48.75 kN (T), FG: 67.5 kN (C), GH: 67.5 kN (C), AF: 58.34 kN (C), HE: 68.94 kN (C), BF: 15 kN (T), CG: 0, DH: 30 kN (T), FC: 1.768 kN (T), HC: 26.52 kN (T)

Answer

Zero-force member: CG
5.Shear force & bending moment

Answer: Mx = 64 kN·m

Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut.

Support reactions

Equilibrium of the whole beam.

UDL resultant: W = w·ℓ = 8·10 = 80 kN, acting at x̄ = 5 m
ΣMA = 0: RB·10 = 8·10·5
RB = 400/10 = 40 kN
ΣFy = 0: RA = 80 − 40 = 40 kN
w = 8 kN/mABRA​ = 40RB​ = 40section8 m2 m

Cut at x = 8 m and keep the left part

Only forces left of the cut appear. A UDL portion acts as one force at the middle of that portion.

M = RA·x − (each load left of the cut × its distance to the cut)
Mx = 40·8 − 8·8·4 = 64 kN·m

Answer

Mx = 64 kN·m
6.Shear force & bending moment

Answer: F (x = 5 m)

Largest bending moment: M changes slope wherever the shear force changes, so its peaks sit where the shear force crosses zero: under a point load, inside a distributed load, or over a support of an overhang. At a fixed support of a cantilever the moment is largest at the wall. Compare the size of M at those places, sagging or hogging.

Support reactions

Take moments about one support, then use the vertical force balance.

R1 = 50 kN, R2 = 80 kN

Bending moment at every mark

Sum the moments of all forces on one side of the cut. Sagging is positive, hogging negative.

MA = 0, MB = −20, MC = 5, MD = 20, ME = −5, MF = −40 kN·m, MG = 0

Answer

Mark F: MF = −40 kN·m
7.Beam deflection

Answer: δ = 5.002 mm

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).

Consistent units

Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.

w = 2 N/mm, L = 1500 mm
EI = 2.53 × 10¹¹ N·mm²

Deflection

δ = wL⁴/(8EI) = 2·1500⁴/(8·2.53 × 10¹¹) = 5.002 mm

Answer

δ = 5.002 mm
8.Beam deflection

Answer: hreq = 155.9 mm

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).

Consistent units

Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.

w = 2.5 N/mm, L = 4000 mm, E = 11000 N/mm²

Deflection limit

δallow = L/250 = 4000/250 = 16 mm

Required second moment of area

Ireq = 5wL⁴/(384·E·δallow) = 5·2.5·4000⁴/(384·11000·16) = 4.735 × 10⁷ mm⁴

Required depth

bh³/12 = Ireq → h = (12·4.735 × 10⁷/150)1/3 = 155.9 mm

Answer

hreq = 155.9 mm

In practice, choose the next standard depth above this value.

9.Column buckling

Answer: Pcr = 117 kN

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Smallest second moment of area

A rectangle buckles about its weak axis, using the smaller dimension cubed.

Imin = h·b³/12 = 100·40³/12 = 533333 mm⁴

Effective length

KL = 0.5·6000 = 3000 mm

Critical load

Pcr = π²EI/(KL)² = π²·200000·533333/3000² = 116973 N = 117 kN

Answer

Pcr = 117 kN
10.Column buckling

Answer: σcr = 9.835 MPa

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Smallest second moment of area

A round section has the same I about every axis.

I = πd⁴/64 = π·25⁴/64 = 19175 mm⁴

Radius of gyration and slenderness

A = 490.9 mm²
r = √(I/A) = √(19175/490.9) = 6.25 mm
KL = 0.7·4000 = 2800 mm
KL/r = 2800/6.25 = 448

Critical stress

σcr = π²E/(KL/r)² = π²·200000/448² = 9.835 MPa

Answer

σcr = 9.835 MPa
11.Centroid & second moment of area

Answer: Ix = 17.64 × 10⁶ mm⁴

Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.

Split into rectangles

Take the base at full width and the two legs above it (height h − t), so nothing is counted twice.

base: A1 = 280·10 = 2800 mm², y1 = 5 mm
two legs: A2 = 2·10·160 = 3200 mm², y2 = 10 + 160/2 = 90 mm

Centroid

ȳ = (2800·5 + 3200·90)/6000 = 50.33 mm

Parallel-axis theorem

base: 280·10³/12 + 2800·(5 − 50.33)² = 5.778 × 10⁶ mm⁴
two legs: 2·10·160³/12 + 3200·(90 − 50.33)² = 1.186 × 10⁷ mm⁴
Ix = 5.778 × 10⁶ + 1.186 × 10⁷
Ix = 1.764 × 10⁷ mm⁴ = 17.64 × 10⁶ mm⁴

Answer

Ix = 17.64 × 10⁶ mm⁴
12.Centroid & second moment of area

Answer: σbottom = 68.59 MPa

Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.

Split into two rectangles

Measure every y from the bottom edge.

flange: Af = 140·15 = 2100 mm², yf = 280 + 15/2 = 287.5 mm
web: Aw = 10·280 = 2800 mm², yw = 280/2 = 140 mm

Centroid

ȳ = (Afyf + Awyw)/(Af + Aw) = (2100·287.5 + 2800·140)/4900 = 203.2 mm

Parallel-axis theorem

flange: 140·15³/12 + 2100·(287.5 − 203.2)² = 1.496 × 10⁷ mm⁴
web: 10·280³/12 + 2800·(140 − 203.2)² = 2.948 × 10⁷ mm⁴
Ix = 1.496 × 10⁷ + 2.948 × 10⁷ = 4.444 × 10⁷ mm⁴

Bending stress

The bottom edge is ȳ from the axis.

y = 203.2 mm
σ = M·y/I = 1.5 × 10⁷·203.2/4.444 × 10⁷ = 68.59 MPa

Answer

σbottom = 68.59 MPa
13.Effective stress in soil

Answer: u = 39.24 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Pore water pressure

Water pressure grows with depth below the water table.

u = γw·(z − zw) = 9.81·4 = 39.24 kPa

Answer

u = 39.24 kPa
14.Effective stress in soil

Answer: σ = 109.5 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Total stress

Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.

σ = γd·2 + γsat,sand·1 + γsat,clay·3
σ = 17·2 + 20·1 + 18.5·3 = 109.5 kPa

Answer

σ = 109.5 kPa
15.Consolidation settlement

Answer: S = 57.02 mm

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Compare with the preconsolidation pressure

σ′f = 120 + 120 = 240 kPa > 160 kPa

Settlement

Recompression up to σ′p, virgin compression beyond it.

S = 0.03·3/(1 + 1.05)·log₁₀(160/120) + 0.2·3/(1 + 1.05)·log₁₀(240/160)
S = 5.485 + 51.54 = 57.02 mm

Answer

S = 57.02 mm
16.Consolidation settlement

Answer: t = 1.531 years

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Drainage path

Hdr = H = 4 m

Time

t = Tv·Hdr²/cv = 0.287·4²/3 = 1.531 years

Answer

t = 1.531 years
17.Hydrostatic force

Answer: F = 239.1 kN

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 2 + 2.5/2 = 3.25 m
A = H·b = 2.5·3 = 7.5 m²
gated = 2 mH = 2.5 mF

Resultant force

F = ρ·g·yc·A = 1000·9.81·3.25·7.5 = 239.1 kN

Answer

F = 239.1 kN
18.Hydrostatic force

Answer: ycp = 2.333 m

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 1.5 + 1.5/2 = 2.25 m
A = H·b = 1.5·2 = 3 m²
gated = 1.5 mH = 1.5 mF

Resultant force

F = ρ·g·yc·A = 1000·9.81·2.25·3 = 66.22 kN

Centre of pressure

Pressure grows with depth, so the resultant acts below the centroid.

Ic = b·H³/12 = 2·1.5³/12 = 0.5625 m⁴
ycp = yc + Ic/(yc·A) = 2.25 + 0.5625/(2.25·3) = 2.333 m

Answer

ycp = 2.333 m
19.Pipe friction & head loss

Answer: hf = 4.875 m

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Mean velocity

A = π·0.075²/4 = 0.004418 m²
V = Q/A = 0.005/0.004418 = 1.132 m/s

Velocity head

V²/(2g) = 1.132²/(2·9.81) = 0.06529 m

Darcy–Weisbach

hf = f·(L/D)·V²/(2g) = 0.028·(200/0.075)·1.132²/(2·9.81) = 4.875 m

Answer

hf = 4.875 m
20.Pipe friction & head loss

Answer: Δz = 17.92 m

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Velocity

V = Q/A = 0.1/0.03142 = 3.183 m/s
V²/(2g) = 0.5164 m

Loss coefficients

f·L/D = 0.022·200/0.2 = 22
ΣK = 0.5 + 4·0.3 + 10 + 1.0 = 12.7

Total head loss

hf = 22·0.5164 = 11.36 m
hm = 12.7·0.5164 = 6.559 m
Δz = hf + hm = 17.92 m

Answer

Δz = 17.92 m
21.Open-channel flow (Manning)

Answer: Q = 6.838 m³/s

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Geometry

A = (b + z·y)·y = (5 + 3·0.7)·0.7 = 4.97 m²
P = b + 2y·√(1 + z²) = 5 + 2·0.7·√(1 + 3²) = 9.427 m
R = A/P = 0.5272 m

Velocity

V = (1/0.03)·0.52722/3·0.0041/2 = 1.376 m/s

Flow rate

Q = A·V = 4.97·1.376 = 6.838 m³/s

Answer

Q = 6.838 m³/s
22.Open-channel flow (Manning)

Answer: S = 0.002032 m/m

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Geometry

A = (b + z·y)·y = (5.5 + 1.5·0.5)·0.5 = 3.125 m²
P = b + 2y·√(1 + z²) = 5.5 + 2·0.5·√(1 + 1.5²) = 7.303 m
R = A/P = 0.4279 m

Solve Manning for S

S1/2 = n·Q/(A·R2/3) = 0.025·3.2/(3.125·0.5679) = 0.04508
S = 0.04508² = 0.002032

Answer

S = 0.002032

That is a fall of 2.032 m per kilometre.

23.Pumps & pump power

Answer: η = 60.11 %

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Hydraulic power

Ph = ρ·g·Q·H = 1000·9.81·0.04·36 = 14.13 kW

Efficiency

η = Ph/Pshaft = 14.13/23.5 = 60.11%

Answer

η = 60.11%
24.Pumps & pump power

Answer: H = 60.35 m

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Velocity

V = Q/A = 0.015/0.007854 = 1.91 m/s
V²/(2g) = 0.1859 m

Head losses

hL = (f·L/D + ΣK)·V²/(2g) = (22 + 8)·0.1859 = 5.577 m

Pressure head

p/(ρ·g) = 400000/(1000·9.81) = 40.77 m

Pump head

Both surfaces are practically at rest, so there is no velocity head term.

H = Δz + p/(ρ·g) + hL = 14 + 40.77 + 5.577 = 60.35 m

Answer

H = 60.35 m
25.Time value of money

Answer: PV = 18128 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Annuity factor

(1 − (1 + i)−n)/i = (1 − 0.3957)/0.05 = 12.09

Present value

PV = 1 500·12.09 = €18 127.98

Answer

PV = €18 127.98
26.Time value of money

Answer: FV = 10491 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Ordinary annuity factor

((1 + 0.06)8 − 1)/0.06 = 9.897

Annuity due

Each deposit is invested one year longer.

FV = 1 000·9.897·1.06 = €10 491.32

Answer

FV = €10 491.32
27.NPV & IRR

Answer: NPV = −1261 €

Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.

Present value of each cash flow

CF0 = −30 000
CF1/(1 + 0.08)1 = 13 000/1.08 = 12 037.04
CF2/(1 + 0.08)2 = 13 000/1.166 = 11 145.40
CF3/(1 + 0.08)3 = 7 000/1.26 = 5 556.83

Add them up

NPV = €−1 260.73

Answer

NPV = €−1 260.73

NPV is negative, so the project earns less than the required return.

28.NPV & IRR

Answer: IRR = 17.38 %

Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.

Bracket the IRR

NPV falls as the rate rises, so the IRR lies between a rate with positive NPV and one with negative NPV.

NPV(15%) = 1 531.19
NPV(20%) = −1 597.22

Narrow down

Linear interpolation gives a first estimate; repeating it (or a calculator's IRR function) gives the exact rate.

IRR ≈ 15 + 5·1 531.19/(1 531.19 − (−1 597.22)) = 17.45%
exact: NPV(17.38%) = 0 → IRR = 17.38%

Answer

IRR = 17.38%
29.Normal distribution

Answer: P = 0.8973

Normal distribution: convert a value x to a z-score, z = (x − μ)/σ, which counts standard deviations from the mean. A z-table (or Φ(z)) gives the area to the left of z, which is P(X < x). The area to the right is 1 − Φ(z), and the area between two values is the difference of their two areas.

z-scores

z₁ = (77.5 − 100)/15 = −1.5
z₂ = (127 − 100)/15 = 1.8

Area between

P = Φ(1.8) − Φ(−1.5) = 0.9641 − 0.06681 = 0.8973

Answer

P = 0.8973
30.Normal distribution

Answer: P = 0.7881

Sums and differences of normal variables: if X and Y are independent and normal, X + Y and X − Y are normal too. Means add or subtract: E(X ± Y) = μX ± μY. Variances always add, also for a difference: Var(X ± Y) = σX² + σY², so σ = √(σX² + σY²). Standard deviations never add directly. The total of n independent items with the same distribution has mean n·μ and standard deviation σ·√n. Then standardise as usual: z = (x − mean)/σ and read Φ(z).

Distribution of the difference

μ = 52 − 48 = 4 s, σ = 5 s

Standardise

z = (0 − 4)/5 = −0.8

Probability

P = 1 − Φ(−0.8) = 0.7881

Answer

P = 0.7881