laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)
Open-channel flow (Manning)
Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²
Pumps & pump power
Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)
Time value of money
Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i
Method
Draw a timeline with every cash flow and its timing.
Match the rate to the period: a monthly rate for monthly payments.
Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
Check the sign and the order of magnitude of the answer.
NPV & IRR
Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)
Method
List all cash flows with their year; the investment at year 0 is negative.
Discount each cash flow: CFt/(1 + r)t.
Add them up to get the NPV. Positive means the project earns more than r.
For the IRR, find the rate that makes NPV zero by trial or interpolation.
Normal distribution
z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ
Method
Convert the value to a z-score: z = (x − μ)/σ.
Look up Φ(z), the area to the left of z.
For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
For a percentile, work backwards: find z for the area, then x = μ + z·σ.
2Practice problems
1.Beam support reactionsMedium
The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RA.
L = 10 mP1 = 25 kN at 6 mP2 = 50 kN at 7 m
RA = kN
2.Beam support reactionsHard
The simply supported beam has a pin at A and a roller at B. A load P acts at 3.5 m from A, inclined at 50° to the horizontal, and a vertical load Q acts at 0.5 m from A. Find the magnitude of the total reaction force RA at the pin A.
L = 5 mP = 60 kN at 3.5 m, θ = 50°Q = 10 kN at 0.5 m
RA = kN
3.Truss: method of jointsMedium
Use the method of joints to find the force FBC in member BC. Give tension as positive and compression as negative.
span = 4 mheight = 3 mB is 1 m from Avertical load = 50 kN
FBC = kN
4.Truss: method of jointsHard
Use the method of joints to find the force FAC in member AC. Give tension as positive and compression as negative.
span = 4 mheight = 3 mB is 3 m from Avertical load = 50 kNhorizontal load = 10 kN ←
FAC = kN
5.Shear force & bending momentMedium
The marks A to G split the beam into six equal parts. At which mark is the bending moment largest in size, sagging or hogging? Click it in the diagram.
35 kN @ 6 m10 kN/m, 4–12 m
1A (x = 0 m)
2B (x = 2 m)
3C (x = 4 m)
4D (x = 6 m)
5E (x = 8 m)
6F (x = 10 m)
7G (x = 12 m)
6.Shear force & bending momentHard
The beam rests on a pin at A and a roller at B and overhangs B by 1.5 m to the free end C. A uniformly distributed load w acts over the whole length A–C. Find the bending moment MB at support B. Use sagging moments positive and upward shear on the left face positive.
L = 5.5 mw = 12 kN/m from 0 to 5.5 msupports at x = 0 and x = 4 m
MB = kN·m
7.Beam deflectionMedium
A cantilever of length L is fixed at A and carries a point load P at a distance a = 1.5 m from A. Find the deflection δB at the free end B.
P = 17 kNa = 1.5 mL = 5 mE = 200 GPa (steel)I = 57 × 10⁶ mm⁴
δB = mm
8.Beam deflectionHard
A propped cantilever is fixed at A and simply supported (propped) at B. It carries a point load P at midspan. EI is constant. Find the reaction RB at the prop.
L = 6 mP = 15 kN at 3 m
RB = kN
9.Column bucklingMedium
A column of length L made of steel is fixed at the base and free at the top. Using Euler’s formula, find its critical buckling load Pcr.
L = 2 mE = 200 GPa (steel)b × h = 50 × 60 mm
Pcr = kN
10.Column bucklingHard
A column of length L made of aluminium is fixed at both ends. Find its slenderness and the critical buckling stress σcr from Euler’s formula.
L = 2.5 mE = 70 GPa (aluminium)d = 30 mm
σcr = MPa
11.Centroid & second moment of areaMedium
Find the second moment of area Ix of the T-section about the horizontal axis x through its centroid.
bf = 140 mmtf = 15 mmtw = 16 mmhw = 120 mm
Ix = × 10⁶ mm⁴
12.Centroid & second moment of areaHard
A welded I-section has a top flange 190 × 14 mm, a web 350 mm high and 10 mm thick, and a bottom flange 300 × 14 mm (width × thickness). Find its second moment of area Ix about the horizontal axis x through its centroid.
top flange: 190 × 14 mmweb: 10 × 350 mmbottom flange: 300 × 14 mm
Ix = × 10⁶ mm⁴
13.Effective stress in soilMedium
For the soil profile shown, find the vertical effective stress σ′ at point X.
A 5.5 m thick overconsolidated clay layer has Cc = 0.3, Cr = 0.03 and e₀ = 0.7. At its mid-depth the effective vertical stress is 115 kPa and the preconsolidation pressure is 145 kPa. A new building adds 110 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.
In a laboratory oedometer test, a clay specimen 25 mm thick, drained at the top and bottom, reaches 50% consolidation in 5 min. In the field the same clay forms a layer 7.5 m thick. It lies on impervious rock, with sand above it, so water drains out only at the top. How many days t does the field layer take to reach 50% consolidation?
A vertical rectangular gate 1.5 m wide sits in the wall of a tank of water, with its top edge 2 m below the surface. Find the resultant hydrostatic force F on the gate.
A vertical rectangular gate 1 m wide sits in the wall of a tank of glycerin, with its top edge 3 m below the surface. Find the resultant hydrostatic force F on the gate.
d = 3 mH = 1 mb = 1 mρ = 1260 kg/m³g = 9.81 m/s²
F = kN
19.Pipe friction & head lossMedium
Water flows at 120 L/s through a pipe 100 m long with an inside diameter of 300 mm. Use the Darcy friction factor f = 0.015 and g = 9.81 m/s². Find the friction head loss hf.
A pipe 500 m long with an inside diameter of 300 mm (Darcy friction factor f = 0.015) runs from an open reservoir and discharges as a free jet into the air. The minor losses are a square-edged entrance (K = 0.5), 4 bends (K = 0.3 each) and a valve (K = 10). Use g = 9.81 m/s². How far H must the reservoir surface be above the pipe outlet for a flow rate of 80 L/s?
A rectangular gravel channel is 2.5 m wide. Water flows uniformly 1 m deep. Manning n = 0.025 and the bed slope is S = 0.0008. Find the flow rate Q in m³/s.
b = 2.5 my = 1 mn = 0.025S = 0.0008
Q = m³/s
22.Open-channel flow (Manning)Hard
A concrete sewer with an inside diameter of 200 mm (Manning n = 0.013) must reach a self-cleansing velocity of 0.6 m/s when flowing just full. Find the minimum slope S (in m/m).
D = 200 mmn = 0.013V = 0.6 m/s
S = m/m
23.Pumps & pump powerMedium
A pump delivers 10 L/s of water (ρ = 1000 kg/m³) against a head of 72 m. The pump efficiency is 70% and the electric motor driving it has an efficiency of 94%. Use g = 9.81 m/s². Find the electrical power Pel the motor draws, in kW.
A pump moves 80 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 5 m higher. The pipe is 200 m long with an inside diameter of 200 mm and a Darcy friction factor f = 0.015; the minor-loss coefficients add up to ΣK = 3 (entrance and exit included). Use g = 9.81 m/s². Find the head H the pump must add.
You need €15 000 in 6 years. An account pays 6% per year, compounded quarterly. How much must you deposit today? Find the present value PV.
FV = €15 0006% / 4n = 6
PV = €
26.Time value of moneyHard
A loan of €150 000 is repaid with equal monthly payments over 25 years at 7.2% per year, compounded monthly. How much interest I is paid in total over the life of the loan?
P = €150 0007.2% / 12N = 300
I = €
27.NPV & IRRMedium
An investment of €45 000 gives these cash flows at the end of years 1 to 3: €17 000, €19 000, €10 000. The cost of capital is 12%. Find the net present value NPV.
A project costs €20 000 and returns €12 000, €8 000, €8 000 at the end of years 1 to 3. Find its internal rate of return IRR in percent.
CF0 = −20 000CF1 = 12 000CF2 = 8 000CF3 = 8 000
IRR = %
29.Normal distributionMedium
The IQ scores are normally distributed with mean 100 points and standard deviation 15 points. What fraction lies between 82 and 115 points? Give P as a decimal.
μ = 100σ = 15x1 = 82x2 = 115
P =
30.Normal distributionHard
Runner A's lap time X and runner B's lap time Y are independent and normal: X has mean 52 s and standard deviation 4 s, Y has mean 48 s and standard deviation 3 s. Find the probability P that X is greater than Y. Round z to two decimals.
μX = 52 s, σX = 4 sμY = 48 s, σY = 3 s
P =
3Solutions
1.Beam support reactions
Answer: RA = 25 kN
Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.
Free-body diagram
Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.
Equilibrium
Moments about A, counter-clockwise positive. Then vertical force balance.
ΣMA = 0: RB·10 = 25·6 + 50·7
RB = 500/10 = 50 kN
ΣFy = 0: RA = 75 − 50 = 25 kN
Answer
RA = 25 kN
2.Beam support reactions
Answer: RA = 44.8 kN
Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Replace each distributed load by its resultant (its area) acting at the centroid of the load diagram, and take moments about a support to remove that support’s reaction from the equation.
Method of joints: every pin of a truss is in equilibrium, so ΣFx = 0 and ΣFy = 0 at each joint. Start at a joint with at most two unknown member forces. A negative result means the member is in compression.
Support reactions
Equilibrium of the whole truss. Moments about A, counter-clockwise positive.
ΣMA = 0: Cy·4 = 50·1 → Cy = 12.5 kN
ΣFy = 0: Ay = 50 − 12.5 = 37.5 kN
Joint C
The roller gives only a vertical reaction, so joint C has just two unknown member forces. Assume both in tension.
sin γ = 3/4.243 = 0.7071, cos γ = 3/4.243 = 0.7071
Method of joints: every pin of a truss is in equilibrium, so ΣFx = 0 and ΣFy = 0 at each joint. Start at a joint with at most two unknown member forces. A negative result means the member is in compression.
Support reactions
Equilibrium of the whole truss. Moments about A, counter-clockwise positive.
ΣMA = 0: Cy·4 = 50·3 − 10·3 → Cy = 30 kN
ΣFy = 0: Ay = 50 − 30 = 20 kN
ΣFx = 0: Ax = 10 kN
Joint C
The roller gives only a vertical reaction, so joint C has just two unknown member forces. Assume both in tension.
sin γ = 3/3.162 = 0.9487, cos γ = 1/3.162 = 0.3162
Largest bending moment: M changes slope wherever the shear force changes, so its peaks sit where the shear force crosses zero: under a point load, inside a distributed load, or over a support of an overhang. At a fixed support of a cantilever the moment is largest at the wall. Compare the size of M at those places, sagging or hogging.
Support reactions
Take moments about one support, then use the vertical force balance.
R1 = 44.17 kN, R2 = 70.83 kN
Bending moment at every mark
Sum the moments of all forces on one side of the cut. Sagging is positive, hogging negative.
MA = 0, MB = 88.33, MC = 176.7, MD = 245 kN·m, ME = 203.3, MF = 121.7, MG = 0
Answer
Mark D: MD = 245 kN·m
6.Shear force & bending moment
Answer: MB = −13.5 kN·m
Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut. Maximum moment: since dM/dx = V, the bending moment has its peak where the shear force passes through zero, either at a point load or inside a distributed load.
Support reactions
Equilibrium of the whole beam, including the load on the overhang.
UDL resultant: W = w·ℓ = 12·5.5 = 66 kN, acting at x̄ = 2.75 m
ΣMA = 0: RB·4 = 12·5.5·2.75
RB = 181.5/4 = 45.38 kN
ΣFy = 0: RA = 66 − 45.38 = 20.63 kN
Cut at B and keep the overhang
The load on the overhang, w·a, acts at a/2 from B and makes the beam hog over the support.
MB = −w·a²/2 = −12·1.5²/2 = −13.5 kN·m
Answer
MB = −13.5 kN·m
7.Beam deflection
Answer: δB = 7.549 mm
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).
Consistent units
Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.
P = 17000 N, a = 1500 mm, L = 5000 mm
EI = 1.14 × 10¹³ N·mm²
Deflection at the free end
Deflection at the load plus the slope at the load times the remaining length.
δP = Pa³/(3EI) = 1.678 mm
θP = Pa²/(2EI) = 0.001678 rad
δB = δP + θP·(L − a) = Pa²(3L − a)/(6EI) = 7.549 mm
Answer
δB = 7.549 mm
8.Beam deflection
Answer: RB = 4.688 kN
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition). For a statically indeterminate beam, remove a redundant support and require the deflection there to be zero (compatibility).
Remove the prop
Without the prop the beam is a cantilever. Its free end would deflect under the load.
δload = P(L/2)²(3L − L/2)/(6EI) = 5PL³/(48EI)
Compatibility at the prop
The prop force RB alone lifts the free end by RBL³/(3EI). The prop holds B at zero deflection, so the two must cancel. EI cancels out.
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Smallest second moment of area
A rectangle buckles about its weak axis, using the smaller dimension cubed.
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Smallest second moment of area
A round section has the same I about every axis.
I = πd⁴/64 = π·30⁴/64 = 39761 mm⁴
Radius of gyration and slenderness
A = 706.9 mm²
r = √(I/A) = √(39761/706.9) = 7.5 mm
KL = 0.5·2500 = 1250 mm
KL/r = 1250/7.5 = 166.7
Critical stress
σcr = π²E/(KL/r)² = π²·70000/166.7² = 24.87 MPa
Answer
σcr = 24.87 MPa
11.Centroid & second moment of area
Answer: Ix = 6.913 × 10⁶ mm⁴
Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.
Split into two rectangles
Measure every y from the bottom edge.
flange: Af = 140·15 = 2100 mm², yf = 120 + 15/2 = 127.5 mm
Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.
Split into three rectangles
Measure every y from the bottom edge.
top flange: A = 2660 mm², y = 371 mm
web: A = 3500 mm², y = 189 mm
bottom flange: A = 4200 mm², y = 7 mm
Centroid
ȳ = (2660·371 + 3500·189 + 4200·7)/10360 = 161.9 mm
Parallel-axis theorem
top flange: 190·14³/12 + 2660·209.1² = 1.163 × 10⁸ mm⁴
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Total stress
Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.
σ = γd·zw + γsat·(z − zw) = 17·4 + 20·3 = 128 kPa
Pore water pressure
Water pressure grows with depth below the water table.
u = γw·(z − zw) = 9.81·3 = 29.43 kPa
Effective stress
σ′ = σ − u = 128 − 29.43 = 98.57 kPa
Answer
σ′ = 98.57 kPa
14.Effective stress in soil
Answer: σ′ = 71.57 kPa
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Total stress
Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.
σ = γd·3 + γsat,sand·1 + γsat,clay·2
σ = 15.5·3 + 18.5·1 + 18·2 = 101 kPa
Pore water pressure
Water pressure grows with depth below the water table.
u = γw·(z − zw) = 9.81·3 = 29.43 kPa
Effective stress
σ′ = σ − u = 101 − 29.43 = 71.57 kPa
Answer
σ′ = 71.57 kPa
15.Consolidation settlement
Answer: S = 195 mm
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Compare with the preconsolidation pressure
σ′f = 115 + 110 = 225 kPa > 145 kPa
Settlement
Recompression up to σ′p, virgin compression beyond it.
S = 0.03·5.5/(1 + 0.7)·log₁₀(145/115) + 0.3·5.5/(1 + 0.7)·log₁₀(225/145)
S = 9.771 + 185.2 = 195 mm
Answer
S = 195 mm
16.Consolidation settlement
Answer: t = 1250 days
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Drainage paths
Hdr,lab = 25/2 = 12.5 mm = 0.0125 m
Hdr,field = 7.5 m
Scale the time
t = Tv·Hdr²/cv with the same T_v and cv in the lab and the field.
tfield = 5·(7.5/0.0125)² = 1.8 × 10⁶ min
tfield = 1.8 × 10⁶/1440 = 1250 days
Answer
t = 1250 days
17.Hydrostatic force
Answer: F = 154.5 kN
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 2 + 3/2 = 3.5 m
A = H·b = 3·1.5 = 4.5 m²
Resultant force
F = ρ·g·yc·A = 1000·9.81·3.5·4.5 = 154.5 kN
Answer
F = 154.5 kN
18.Hydrostatic force
Answer: F = 43.26 kN
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 3 + 1/2 = 3.5 m
A = H·b = 1·1 = 1 m²
Resultant force
F = ρ·g·yc·A = 1260·9.81·3.5·1 = 43.26 kN
Answer
F = 43.26 kN
19.Pipe friction & head loss
Answer: hf = 0.7345 m
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Mean velocity
A = π·0.3²/4 = 0.07069 m²
V = Q/A = 0.12/0.07069 = 1.698 m/s
Velocity head
V²/(2g) = 1.698²/(2·9.81) = 0.1469 m
Darcy–Weisbach
hf = f·(L/D)·V²/(2g) = 0.015·(100/0.3)·1.698²/(2·9.81) = 0.7345 m
Answer
hf = 0.7345 m
20.Pipe friction & head loss
Answer: H = 2.461 m
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Velocity
V = Q/A = 0.08/0.07069 = 1.132 m/s
V²/(2g) = 0.06529 m
Loss coefficients
f·L/D = 0.015·500/0.3 = 25
ΣK = 0.5 + 4·0.3 + 10 = 11.7
Energy equation
The outlet jet still carries its velocity head; it is not a loss but it has to be supplied.
H = (1 + 25 + 11.7)·0.06529 = 2.461 m
Answer
H = 2.461 m
21.Open-channel flow (Manning)
Answer: Q = 1.911 m³/s
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Geometry
A = b·y = 2.5·1 = 2.5 m²
P = b + 2y = 2.5 + 2·1 = 4.5 m
R = A/P = 0.5556 m
Velocity
V = (1/0.025)·0.55562/3·0.00081/2 = 0.7646 m/s
Flow rate
Q = A·V = 2.5·0.7646 = 1.911 m³/s
Answer
Q = 1.911 m³/s
22.Open-channel flow (Manning)
Answer: S = 0.003303 m/m
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Hydraulic radius
R = D/4 = 0.2/4 = 0.05 m
Solve Manning for S
S = (n·V/R2/3)² = (0.013·0.6/0.1357)² = 0.003303
Answer
S = 0.003303
That is a fall of 3.303 m per kilometre.
23.Pumps & pump power
Answer: Pel = 10.73 kW
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Hydraulic power
Ph = ρ·g·Q·H = 1000·9.81·0.01·72 = 7.063 kW
Shaft power
Pshaft = 7.063/0.7 = 10.09 kW
Electrical power
Pel = 10.09/0.94 = 10.73 kW
Answer
Pel = 10.73 kW
24.Pumps & pump power
Answer: H = 10.95 m
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Both surfaces are open and practically at rest, so pressure and velocity terms drop out.
H = Δz + hL = 5 + 5.949 = 10.95 m
Answer
H = 10.95 m
25.Time value of money
Answer: PV = 10493 €
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
Rate and number of periods
i = 0.06/4 = 0.015
N = 4·6 = 24
Present value
PV = FV/(1 + i)N = 15 000/1.43 = €10 493.16
Answer
PV = €10 493.16
26.Time value of money
Answer: I = 173815 €
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.
Present value of each cash flow
CF0 = −45 000
CF1/(1 + 0.12)1 = 17 000/1.12 = 15 178.57
CF2/(1 + 0.12)2 = 19 000/1.254 = 15 146.68
CF3/(1 + 0.12)3 = 10 000/1.405 = 7 117.80
Add them up
NPV = €−7 556.94
Answer
NPV = €−7 556.94
NPV is negative, so the project earns less than the required return.
28.NPV & IRR
Answer: IRR = 20.64 %
Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.
Bracket the IRR
NPV falls as the rate rises, so the IRR lies between a rate with positive NPV and one with negative NPV.
NPV(20%) = 185.19
NPV(25%) = −1 184.00
Narrow down
Linear interpolation gives a first estimate; repeating it (or a calculator's IRR function) gives the exact rate.
Normal distribution: convert a value x to a z-score, z = (x − μ)/σ, which counts standard deviations from the mean. A z-table (or Φ(z)) gives the area to the left of z, which is P(X < x). The area to the right is 1 − Φ(z), and the area between two values is the difference of their two areas.
z-scores
z₁ = (82 − 100)/15 = −1.2
z₂ = (115 − 100)/15 = 1
Area between
P = Φ(1) − Φ(−1.2) = 0.8413 − 0.1151 = 0.7263
Answer
P = 0.7263
30.Normal distribution
Answer: P = 0.7881
Sums and differences of normal variables: if X and Y are independent and normal, X + Y and X − Y are normal too. Means add or subtract: E(X ± Y) = μX ± μY. Variances always add, also for a difference: Var(X ± Y) = σX² + σY², so σ = √(σX² + σY²). Standard deviations never add directly. The total of n independent items with the same distribution has mean n·μ and standard deviation σ·√n. Then standardise as usual: z = (x − mean)/σ and read Φ(z).
Distribution of the difference
μ = 52 − 48 = 4 s, σ = 5 s
Standardise
z = (0 − 4)/5 = −0.8
Probability
P = 1 − Φ(−0.8) = 0.7881
Answer
P = 0.7881
This is independent practice material. ExamProblems is not affiliated with or endorsed by the organisation that runs this exam, and the exam name is used only to describe the content. The FE exam is run by NCEES, which is not affiliated with ExamProblems and does not endorse it.