FE Civil exam practice: cram pack

Formula sheets, the key method steps for every topic and 30 practice problems, with full solutions at the back.

New problemsBack to the course

In the print window, choose “Save as PDF” to keep a copy on your device.

1Formulas and methods

Beam support reactions

Equilibrium
ΣFx = 0, ΣFy = 0, ΣM = 0
Uniform load
resultant w·L at the middle of the load
Moment
M = F·d

Method

  1. Draw a free-body diagram and replace each support by its reactions.
  2. Replace every distributed load by a single force at its centroid.
  3. Take moments about one support to find the reaction at the other.
  4. Use ΣFy = 0 to find the remaining reaction, and check with a second moment equation.

Truss: method of joints

Method of joints
ΣFx = 0, ΣFy = 0 at each joint
Method of sections
ΣM = 0 about a cut point
Member force
positive = tension, negative = compression

Method

  1. Find the support reactions for the whole truss.
  2. Method of joints: start at a joint with at most two unknown member forces and use ΣFx = 0 and ΣFy = 0.
  3. Method of sections: cut through the member you need and take moments about a point where the other unknown members meet.
  4. Assume tension; a negative answer means compression.

Shear force & bending moment

Shear and moment
V = ΣF on one side, M = ΣF·d on one side
Bending stress
σ = M·y/I
Rectangle
I = bh³/12
Section modulus
W = I/ymax
Simply supported, uniform load
Mmax = wL²/8

Method

  1. Find the support reactions from equilibrium of the whole beam.
  2. Cut the beam at the section you need and keep one side.
  3. Shear force: sum of the vertical forces on that side. Bending moment: sum of their moments about the cut.
  4. For the maximum moment, find where the shear force is zero.

Beam deflection

Point load at midspan
δ = PL³/(48EI)
Uniform load, simply supported
δ = 5wL⁴/(384EI)
Cantilever, end load
δ = PL³/(3EI)
Cantilever, uniform load
δ = wL⁴/(8EI)
Superposition
δ = δ1 + δ2

Column buckling

Euler load
Pcr = π²EI/(KL)²
Effective length factor
K = 1 pinned–pinned, 0.5 fixed–fixed, 0.7 fixed–pinned, 2 fixed–free
Critical stress
σcr = Pcr/A
Slenderness
λ = KL/r, r = √(I/A)

Centroid & second moment of area

Centroid
ȳ = ΣAiyi/ΣAi
Rectangle
I = bh³/12
Parallel-axis theorem
I = Ic + A·d²
Composite section
I = Σ(Ic,i + Aidi²)

Effective stress in soil

Total stress
σ = Σγi·hi
Pore water pressure
u = γw·(z − zw)
Effective stress
σ′ = σ − u
Water
γw = 9.81 kN/m³

Consolidation settlement

Normally consolidated
S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0)
Final stress
σ′f = σ′0 + Δσ (at mid-depth of the layer)
Overconsolidated, σ′f ≤ σ′p
S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0)
Overconsolidated, σ′f > σ′p
S = H/(1 + e0)·[Cr·log₁₀(σ′p/σ′0) + Cc·log₁₀(σ′f/σ′p)]
Overconsolidation ratio
OCR = σ′p/σ′0
Time for consolidation
t = Tv·Hdr²/cv
Drainage path
Hdr = H/2 (double drainage), H (single drainage)
Time factors
U 50% → 0.197, 60% → 0.287, 70% → 0.403, 80% → 0.567, 90% → 0.848

Hydrostatic force

Pressure at depth
p = ρgh
Force on a vertical wall
F = ρg·hc·A
Centre of pressure
yp = yc + Ic/(ycA)
Rectangle
Ic = bH³/12

Pipe friction & head loss

Reynolds number
Re = V·D/ν = ρ·V·D/μ
Flow regime
laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)

Open-channel flow (Manning)

Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²

Pumps & pump power

Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)

Time value of money

Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i

Method

  1. Draw a timeline with every cash flow and its timing.
  2. Match the rate to the period: a monthly rate for monthly payments.
  3. Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
  4. Check the sign and the order of magnitude of the answer.

NPV & IRR

Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)

Method

  1. List all cash flows with their year; the investment at year 0 is negative.
  2. Discount each cash flow: CFt/(1 + r)t.
  3. Add them up to get the NPV. Positive means the project earns more than r.
  4. For the IRR, find the rate that makes NPV zero by trial or interpolation.

Normal distribution

z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ

Method

  1. Convert the value to a z-score: z = (x − μ)/σ.
  2. Look up Φ(z), the area to the left of z.
  3. For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
  4. For a percentile, work backwards: find z for the area, then x = μ + z·σ.

2Practice problems

1.Beam support reactionsMedium
P = 75 kNM = 15 kN·mABRB​ = ?1 m1 m3 m

The simply supported beam has a pin at A and a roller at B. It carries a point load P at 2 m from A and a clockwise couple M at 1 m from A. Find the vertical reaction RB, taking upward as positive.

L = 5 mP = 75 kN at 2 mM = 15 kN·m (clockwise) at 1 m
RB = kN
2.Beam support reactionsHard
w0​ = 4 kN/mP = 55 kNABMA​ = ?6 m4 m

The cantilever beam is fixed to the wall at A. It carries a linearly varying load that is 4 kN/m at the wall and falls to zero at the free end B, plus a point load P at 6 m from the wall. Find the magnitude of the reaction moment MA at the wall.

L = 10 mw0 = 4 kN/mP = 55 kN at 6 m
MA = kN·m
3.Truss: method of jointsMedium
ABCDEFGH40 kN25 kN4 × 3 m3 m

Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.

B: 40 kN ↓H: 25 kN ↓
  1. 1member AB
  2. 2member BC
  3. 3member CD
  4. 4member DE
  5. 5member FG
  6. 6member GH
  7. 7member AF
  8. 8member HE
  9. 9member BF
  10. 10member CG
  11. 11member DH
  12. 12member BG
  13. 13member DG
4.Truss: method of jointsHard
ABBCACACB55 kN25 kN5 m3 m3 m

Use the method of joints to find the force FAC in member AC. Give tension as positive and compression as negative.

span = 5 mheight = 3 mB is 3 m from Avertical load = 55 kNhorizontal load = 25 kN ←
FAC = kN
5.Shear force & bending momentMedium
P1​ = 70 kNP2​ = 80 kNABC3.5 m2.5 m1 m

The beam rests on a pin at A and a roller at B and overhangs B by 1 m to the free end C. It carries a point load P1 between the supports and a point load P2 at C. Find the shear force Vx just to the left of support B. Use sagging moments positive and upward shear on the left face positive.

L = 7 mP1 = 70 kN at 3.5 mP2 = 80 kN at 7 msupports at x = 0 and x = 6 m
Vx = kN
6.Shear force & bending momentHard
10 kN/m50 kN20 kN60 kNABCDEFG1 m1 m1 m1 m1 m1 m

The marks A to G split the beam into six equal parts. At which mark is the bending moment largest in size, sagging or hogging? Click it in the diagram.

50 kN @ 0 m20 kN @ 6 m60 kN @ 3 m10 kN/m, 1–4 m
  1. 1A (x = 0 m)
  2. 2B (x = 1 m)
  3. 3C (x = 2 m)
  4. 4D (x = 3 m)
  5. 5E (x = 4 m)
  6. 6F (x = 5 m)
  7. 7G (x = 6 m)
7.Beam deflectionMedium
w = 8 kN/mABθ3 m

A simply supported beam carries a uniformly distributed load w over its whole span. Find the slope θA of the beam at support A, in radians.

w = 8 kN/mL = 3 mE = 70 GPa (aluminium)I = 12 × 10⁶ mm⁴
θA = rad
8.Beam deflectionHard
w = 5 kN/mδL = 2.5 m

A simply supported beam carries a uniformly distributed load w. Its deflection may not exceed span/360. Find the smallest second moment of area Ireq that meets this limit.

w = 5 kN/mL = 2.5 mE = 11 GPa (timber)
Ireq = × 10⁶ mm⁴
9.Column bucklingMedium
PL = 2.5 m30 × 60 mmcross-section

A column of length L made of steel is fixed at both ends. Using Euler’s formula, find its critical buckling load Pcr.

L = 2.5 mE = 200 GPa (steel)b × h = 30 × 60 mm
Pcr = kN
10.Column bucklingHard
PL = 1 md = 20 mmcross-section

A column of length L made of steel is fixed at the base and pinned at the top. Find its slenderness and the critical buckling stress σcr from Euler’s formula.

L = 1 mE = 200 GPa (steel)d = 20 mm
σcr = MPa
11.Centroid & second moment of areaMedium
1605001414xdimensions in mm

A symmetric I-section has flanges 160 mm wide and 14 mm thick, an overall depth of 500 mm and a web 14 mm thick. Find its second moment of area Ix about the horizontal centroidal axis x.

B = 160 mmH = 500 mmtf = 14 mmtw = 14 mm
Ix = × 10⁶ mm⁴
12.Centroid & second moment of areaHard
110250183601814xdimensions in mm

A welded I-section has a top flange 110 × 18 mm, a web 360 mm high and 14 mm thick, and a bottom flange 250 × 18 mm (width × thickness). Find its second moment of area Ix about the horizontal axis x through its centroid.

top flange: 110 × 18 mmweb: 14 × 360 mmbottom flange: 250 × 18 mm
Ix = × 10⁶ mm⁴
13.Effective stress in soilMedium
sandγd​ = 15 kN/m³γsat​ = 19 kN/m³13 mwater tableXz = 12 m

For the soil profile shown, find the vertical effective stress σ′ at point X.

z = 12 mzw = 4 mγw = 9.81 kN/m³sand: γd = 15 kN/m³sand: γsat = 19 kN/m³
σ′ = kPa
14.Effective stress in soilHard
sandγd​ = 15 kN/m³γsat​ = 20 kN/m³5 mclayγsat​ = 18.5 kN/m³5 mwater tableXz = 7.5 m

For the soil profile shown, find the total vertical stress σ at point X.

z = 7.5 mzw = 4 mγw = 9.81 kN/m³sand: γd = 15 kN/m³sand: γsat = 20 kN/m³clay: γsat = 18.5 kN/m³
σ = kPa
15.Consolidation settlementMedium
Δσ = 130 kPasandclayCc​ = 0.35, Cr​ = 0.05e0​ = 0.95σ′0​ = 120 kPaOCR = 24.5 mwater table

A 4.5 m thick overconsolidated clay layer has Cc = 0.35, Cr = 0.05 and e₀ = 0.95. At its mid-depth the effective vertical stress is 120 kPa and the overconsolidation ratio is OCR = 2. A new building adds 130 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.

H = 4.5 mCc = 0.35Cr = 0.05e0 = 0.95σ′0 = 120 kPaOCR = 2Δσ = 130 kPa
S = mm
16.Consolidation settlementHard
sandclayH = 3 mcv​ = 0.5 m²/year3 msandwater table

A clay layer 3 m thick has a coefficient of consolidation cv = 0.5 m²/year. It lies between two sand layers, so water drains out at the top and the bottom. For 60% average consolidation the time factor is Tv = 0.287. How many years t does the layer take to reach 60% consolidation?

H = 3 mcv = 0.5 m²/yearU = 60%Tv = 0.287double drainage
t = years
17.Hydrostatic forceMedium
gated = 0.5 mH = 2.5 m

A vertical rectangular gate 2 m wide sits in the wall of a tank of water, with its top edge 0.5 m below the surface. Find the resultant hydrostatic force F on the gate.

d = 0.5 mH = 2.5 mb = 2 mρ = 1000 kg/m³g = 9.81 m/s²
F = kN
18.Hydrostatic forceHard
gated = 3 mH = 1 m

A vertical rectangular gate 2 m wide sits in the wall of a tank of oil, with its top edge 3 m below the surface. Find the depth ycp of the centre of pressure below the surface.

d = 3 mH = 1 mb = 2 mρ = 880 kg/m³g = 9.81 m/s²
ycp = m
19.Pipe friction & head lossMedium
V = 2.2 m/sD = 50 mmL = 800 mf = 0.018

Water flows at a mean velocity of 2.2 m/s through a pipe 800 m long with an inside diameter of 50 mm. Use the Darcy friction factor f = 0.018 and g = 9.81 m/s². Find the friction head loss hf.

V = 2.2 m/sL = 800 mD = 50 mmf = 0.018g = 9.81 m/s²
hf = m
20.Pipe friction & head lossHard
K = 5free outletH = ?L = 200 m, D = 150 mm, f = 0.0182× bend (K = 0.3)

A pipe 200 m long with an inside diameter of 150 mm (Darcy friction factor f = 0.018) runs from an open reservoir and discharges as a free jet into the air. The minor losses are a square-edged entrance (K = 0.5), 2 bends (K = 0.3 each) and a valve (K = 5). Use g = 9.81 m/s². How far H must the reservoir surface be above the pipe outlet for a flow rate of 40 L/s?

Q = 40 L/sL = 200 mD = 150 mmf = 0.018Kentrance = 0.5Kbend = 0.3 (×2)Kvalve = 5
H = m
21.Open-channel flow (Manning)Medium
b = 5 my = 2.4 mn = 0.022, S = 0.0015

A rectangular clean earth channel is 5 m wide. Water flows uniformly 2.4 m deep. Manning n = 0.022 and the bed slope is S = 0.0015. Find the flow rate Q in m³/s.

b = 5 my = 2.4 mn = 0.022S = 0.0015
Q = m³/s
22.Open-channel flow (Manning)Hard
D = 200 mmn = 0.013, V = 1.2 m/s

A concrete sewer with an inside diameter of 200 mm (Manning n = 0.013) must reach a self-cleansing velocity of 1.2 m/s when flowing just full. Find the minimum slope S (in m/m).

D = 200 mmn = 0.013V = 1.2 m/s
S = m/m
23.Pumps & pump powerMedium
PQ = 30 L/sH = 62 m

A pump delivers 30 L/s of water (ρ = 1000 kg/m³) against a head of 62 m. The pump efficiency is 75% and the electric motor driving it has an efficiency of 92%. Use g = 9.81 m/s². Find the electrical power Pel the motor draws, in kW.

Q = 30 L/sH = 62 mηpump = 75%ηmotor = 92%g = 9.81 m/s²
Pel = kW
24.Pumps & pump powerHard
PQ = 80 L/sΔz = 17 mL = 500 m, D = 200 mm, f = 0.015, ΣK = 6

A pump moves 80 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 17 m higher. The pipe is 500 m long with an inside diameter of 200 mm and a Darcy friction factor f = 0.015; the minor-loss coefficients add up to ΣK = 6 (entrance and exit included). Use g = 9.81 m/s². The pump efficiency is 72%. Find the shaft power Pshaft in kW.

Q = 80 L/sΔz = 17 mL = 500 mD = 200 mmf = 0.015ΣK = 6η = 72%
Pshaft = kW
25.Time value of moneyMedium
years0123…10€10 000FV = ?

You invest €10 000 at 8% per year with continuous compounding. Find the value FV after 10 years.

PV = €10 000r = 8%t = 10
FV = €
26.Time value of moneyHard
months0123…108A?AA€50 000

You want €50 000 in 9 years. You save the same amount at the end of every month in an account paying 7.2% per year, compounded monthly. Find the monthly deposit A.

FV = €50 0007.2% / 12N = 108
A = €
27.NPV & IRRMedium
years0123…9−250 00014 000+2%+2%…r = 8%, NPV = ?

A project costs €250 000 today. It generates €14 000 at the end of the first year, and the cash flow then grows by 2% per year forever. The cost of capital is 8%. Find the net present value NPV.

C0 = €250 000CF1 = €14 000g = 2%r = 8%
NPV = €
28.NPV & IRRHard
years0123…10−10 0001 5001 5001 5001 500

An investment of €10 000 returns €1 500 at the end of each year for 10 years. Find its internal rate of return IRR in percent.

C0 = €10 000CF = €1 500n = 10
IRR = %
29.Normal distributionMedium
164.35183.6P = ?

The heights of adult men are normally distributed with mean 178 cm and standard deviation 7 cm. What fraction lies between 164.35 and 183.6 cm? Give P as a decimal.

μ = 178σ = 7x1 = 164.35x2 = 183.6
P =
30.Normal distributionHard
35455565758595pointstop 20%

The exam scores are normally distributed with mean 65 points and standard deviation 10 points. Drag the cut-off so the shaded top 20% is to the right of it. Find the cut-off x.

μ = 65 pointsσ = 10 points20%
x = points

3Solutions

1.Beam support reactions

Answer: RB = 33 kN

Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Replace each distributed load by its resultant (its area) acting at the centroid of the load diagram, and take moments about a support to remove that support’s reaction from the equation.

Moments about A

Counter-clockwise positive.

ΣMA = 0: RB·5 − 75·2 − 15 = 0
RB = 165/5 = 33 kN

Vertical equilibrium

RA = 75 − 33 = 42 kN

Answer

RB = 33 kN

A negative reaction acts downward.

2.Beam support reactions

Answer: MA = 396.7 kN·m

Cantilever equilibrium: a fixed support can push up and also resist rotation, so it gives a vertical reaction RA and a reaction moment MA. ΣFy = 0 gives RA, and moments about the wall give MA = Σ(load × distance from the wall). A distributed load acts as its resultant at the centroid of the load diagram.

Resultant of the triangular load

W = ½·4·10 = 20 kN
x̄ = L/3 = 3.333 m

Moment about the wall

MA = W·x̄ + P·a = 20·3.333 + 55·6 = 396.7 kN·m

Answer

MA = 396.7 kN·m
3.Truss: method of joints

Answer: member CG

Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.

Joint C

BC and CD lie on one straight line and the joint carries no load. Balancing forces across that line leaves only CG.

ΣF⊥ = 0 → FCG = 0

Check with the method of joints

Solving all joints gives these member forces (T = tension, C = compression).

AB: 36.25 kN (T), BC: 32.5 kN (T), CD: 32.5 kN (T), DE: 28.75 kN (T), FG: 36.25 kN (C), GH: 28.75 kN (C), AF: 51.27 kN (C), HE: 40.66 kN (C), BF: 36.25 kN (T), CG: 0, DH: 3.75 kN (T), BG: 5.303 kN (T), DG: 5.303 kN (C)

Answer

Zero-force member: CG
4.Truss: method of joints

Answer: FAC = 12 kN

Method of joints: every pin of a truss is in equilibrium, so ΣFx = 0 and ΣFy = 0 at each joint. Start at a joint with at most two unknown member forces. A negative result means the member is in compression.

ABBCACACB55 kN25 kNAy​Cy​Ax​

Support reactions

Equilibrium of the whole truss. Moments about A, counter-clockwise positive.

ΣMA = 0: Cy·5 = 55·3 − 25·3 → Cy = 18 kN
ΣFy = 0: Ay = 55 − 18 = 37 kN
ΣFx = 0: Ax = 25 kN

Joint C

The roller gives only a vertical reaction, so joint C has just two unknown member forces. Assume both in tension.

sin γ = 3/3.606 = 0.8321, cos γ = 2/3.606 = 0.5547
ΣFy = 0: Cy + FBC·sin γ = 0 → FBC = −18/0.8321 = −21.63 kN
ΣFx = 0: −FAC − FBC·cos γ = 0 → FAC = −(−21.63)·0.5547 = 12 kN

Answer

FAC = 12 kN (tension)
5.Shear force & bending moment

Answer: Vx = −54.17 kN

Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut.

Support reactions

Equilibrium of the whole beam. The overhang load also acts about A.

ΣMA = 0: RB·6 = 70·3.5 + 80·7
RB = 805/6 = 134.2 kN
ΣFy = 0: RA = 150 − 134.2 = 15.83 kN

Cut just left of B and keep the left part

Vx = RA − P1 = 15.83 − 70 = −54.17 kN

Answer

Vx = −54.17 kN
6.Shear force & bending moment

Answer: B (x = 1 m)

Largest bending moment: M changes slope wherever the shear force changes, so its peaks sit where the shear force crosses zero: under a point load, inside a distributed load, or over a support of an overhang. At a fixed support of a cantilever the moment is largest at the wall. Compare the size of M at those places, sagging or hogging.

Support reactions

Take moments about one support, then use the vertical force balance.

R1 = 88.33 kN, R2 = 71.67 kN

Bending moment at every mark

Sum the moments of all forces on one side of the cut. Sagging is positive, hogging negative.

MA = 0, MB = −50 kN·m, MC = −16.67, MD = 6.667, ME = −40, MF = −20, MG = 0

Answer

Mark B: MB = −50 kN·m
7.Beam deflection

Answer: θA = 0.01071 rad

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition). The slope θ = dv/dx is the first integral of M/(EI); in consistent units it comes out in radians.

Consistent units

Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.

w = 8 N/mm, L = 3000 mm
EI = 8.4 × 10¹¹ N·mm²

End slope

θA = wL³/(24EI) = 8·3000³/(24·8.4 × 10¹¹) = 0.01071 rad

Answer

θA = 0.01071 rad

That is 0.6139°.

8.Beam deflection

Answer: Ireq = 33.29 × 10⁶ mm⁴

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).

Deflection limit

δallow = L/360 = 2500/360 = 6.944 mm

Required second moment of area

I = 5wL⁴/(384·E·δallow) = 5·5·2500⁴/(384·11000·6.944) = 3.329 × 10⁷ mm⁴
Ireq = 33.29 × 10⁶ mm⁴

Answer

Ireq = 33.29 × 10⁶ mm⁴
9.Column buckling

Answer: Pcr = 170.5 kN

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Smallest second moment of area

A rectangle buckles about its weak axis, using the smaller dimension cubed.

Imin = h·b³/12 = 60·30³/12 = 135000 mm⁴

Effective length

KL = 0.5·2500 = 1250 mm

Critical load

Pcr = π²EI/(KL)² = π²·200000·135000/1250² = 170547 N = 170.5 kN

Answer

Pcr = 170.5 kN
10.Column buckling

Answer: σcr = 100.7 MPa

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Smallest second moment of area

A round section has the same I about every axis.

I = πd⁴/64 = π·20⁴/64 = 7854 mm⁴

Radius of gyration and slenderness

A = 314.2 mm²
r = √(I/A) = √(7854/314.2) = 5 mm
KL = 0.7·1000 = 700 mm
KL/r = 700/5 = 140

Critical stress

σcr = π²E/(KL/r)² = π²·200000/140² = 100.7 MPa

Answer

σcr = 100.7 MPa
11.Centroid & second moment of area

Answer: Ix = 387.3 × 10⁶ mm⁴

Second moment of area: for a rectangle about its own centroidal axis I = bh³/12, and about its base bh³/3 (parallel-axis theorem I = Ic + A·d²). A hole is handled by subtracting its I, as long as both parts share the same axis. The elastic section modulus is S = I/c, where c is the distance to the extreme fibre.

Outer rectangle minus the two side cut-outs

Both cut-outs together are (B − tw) wide and hw = H − 2tf high, and share the axis x.

hw = 500 − 2·14 = 472 mm
Ix = (B·H³ − (B − tw)·hw³)/12 = (160·500³ − 146·472³)/12
Ix = 3.873 × 10⁸ mm⁴ = 387.3 × 10⁶ mm⁴

Answer

Ix = 387.3 × 10⁶ mm⁴
12.Centroid & second moment of area

Answer: Ix = 266.4 × 10⁶ mm⁴

Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.

Split into three rectangles

Measure every y from the bottom edge.

top flange: A = 1980 mm², y = 387 mm
web: A = 5040 mm², y = 198 mm
bottom flange: A = 4500 mm², y = 9 mm

Centroid

ȳ = (1980·387 + 5040·198 + 4500·9)/11520 = 156.7 mm

Parallel-axis theorem

top flange: 110·18³/12 + 1980·230.3² = 1.051 × 10⁸ mm⁴
web: 14·360³/12 + 5040·41.34² = 6.305 × 10⁷ mm⁴
bottom flange: 250·18³/12 + 4500·147.7² = 9.823 × 10⁷ mm⁴
Ix = 1.051 × 10⁸ + 6.305 × 10⁷ + 9.823 × 10⁷
Ix = 2.664 × 10⁸ mm⁴ = 266.4 × 10⁶ mm⁴

Answer

Ix = 266.4 × 10⁶ mm⁴
13.Effective stress in soil

Answer: σ′ = 133.5 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Total stress

Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.

σ = γd·zw + γsat·(z − zw) = 15·4 + 19·8 = 212 kPa

Pore water pressure

Water pressure grows with depth below the water table.

u = γw·(z − zw) = 9.81·8 = 78.48 kPa

Effective stress

σ′ = σ − u = 212 − 78.48 = 133.5 kPa

Answer

σ′ = 133.5 kPa
14.Effective stress in soil

Answer: σ = 126.3 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Total stress

Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.

σ = γd·4 + γsat,sand·1 + γsat,clay·2.5
σ = 15·4 + 20·1 + 18.5·2.5 = 126.3 kPa

Answer

σ = 126.3 kPa
15.Consolidation settlement

Answer: S = 49.05 mm

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Preconsolidation pressure

σ′p = OCR·σ′0 = 2·120 = 240 kPa

Compare with the preconsolidation pressure

σ′f = 120 + 130 = 250 kPa > 240 kPa

Settlement

Recompression up to σ′p, virgin compression beyond it.

S = 0.05·4.5/(1 + 0.95)·log₁₀(240/120) + 0.35·4.5/(1 + 0.95)·log₁₀(250/240)
S = 34.73 + 14.32 = 49.05 mm

Answer

S = 49.05 mm
16.Consolidation settlement

Answer: t = 1.292 years

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Drainage path

Hdr = H/2 = 3/2 = 1.5 m

Time

t = Tv·Hdr²/cv = 0.287·1.5²/0.5 = 1.292 years

Answer

t = 1.292 years
17.Hydrostatic force

Answer: F = 85.84 kN

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 0.5 + 2.5/2 = 1.75 m
A = H·b = 2.5·2 = 5 m²
gated = 0.5 mH = 2.5 mF

Resultant force

F = ρ·g·yc·A = 1000·9.81·1.75·5 = 85.84 kN

Answer

F = 85.84 kN
18.Hydrostatic force

Answer: ycp = 3.524 m

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 3 + 1/2 = 3.5 m
A = H·b = 1·2 = 2 m²
gated = 3 mH = 1 mF

Resultant force

F = ρ·g·yc·A = 880·9.81·3.5·2 = 60.43 kN

Centre of pressure

Pressure grows with depth, so the resultant acts below the centroid.

Ic = b·H³/12 = 2·1³/12 = 0.1667 m⁴
ycp = yc + Ic/(yc·A) = 3.5 + 0.1667/(3.5·2) = 3.524 m

Answer

ycp = 3.524 m
19.Pipe friction & head loss

Answer: hf = 71.05 m

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Velocity head

V²/(2g) = 2.2²/(2·9.81) = 0.2467 m

Darcy–Weisbach

hf = f·(L/D)·V²/(2g) = 0.018·(800/0.05)·2.2²/(2·9.81) = 71.05 m

Answer

hf = 71.05 m
20.Pipe friction & head loss

Answer: H = 8.122 m

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Velocity

V = Q/A = 0.04/0.01767 = 2.264 m/s
V²/(2g) = 0.2611 m

Loss coefficients

f·L/D = 0.018·200/0.15 = 24
ΣK = 0.5 + 2·0.3 + 5 = 6.1

Energy equation

The outlet jet still carries its velocity head; it is not a loss but it has to be supplied.

H = (1 + 24 + 6.1)·0.2611 = 8.122 m

Answer

H = 8.122 m
21.Open-channel flow (Manning)

Answer: Q = 24.18 m³/s

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Geometry

A = b·y = 5·2.4 = 12 m²
P = b + 2y = 5 + 2·2.4 = 9.8 m
R = A/P = 1.224 m

Velocity

V = (1/0.022)·1.2242/3·0.00151/2 = 2.015 m/s

Flow rate

Q = A·V = 12·2.015 = 24.18 m³/s

Answer

Q = 24.18 m³/s
22.Open-channel flow (Manning)

Answer: S = 0.01321 m/m

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Hydraulic radius

R = D/4 = 0.2/4 = 0.05 m

Solve Manning for S

S = (n·V/R2/3)² = (0.013·1.2/0.1357)² = 0.01321

Answer

S = 0.01321

That is a fall of 13.21 m per kilometre.

23.Pumps & pump power

Answer: Pel = 26.44 kW

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Hydraulic power

Ph = ρ·g·Q·H = 1000·9.81·0.03·62 = 18.25 kW

Shaft power

Pshaft = 18.25/0.75 = 24.33 kW

Electrical power

Pel = 24.33/0.92 = 26.44 kW

Answer

Pel = 26.44 kW
24.Pumps & pump power

Answer: Pshaft = 34.2 kW

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Velocity

V = Q/A = 0.08/0.03142 = 2.546 m/s
V²/(2g) = 0.3305 m

Head losses

hL = (f·L/D + ΣK)·V²/(2g) = (37.5 + 6)·0.3305 = 14.38 m

Pump head

H = Δz + hL = 17 + 14.38 = 31.38 m

Shaft power

Pshaft = ρ·g·Q·H/η = 1000·9.81·0.08·31.38/0.72 = 34.2 kW

Answer

Pshaft = 34.2 kW
25.Time value of money

Answer: FV = 22255 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Exponent

r·t = 0.08·10 = 0.8
e0.8 = 2.226

Future value

FV = 10 000·2.226 = €22 255.41

Answer

FV = €22 255.41
26.Time value of money

Answer: A = 330.4 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Monthly rate and number of deposits

i = 0.07200000000000001/12 = 0.006
N = 12·9 = 108

Deposit

A = FV·i/((1 + i)N − 1) = 50 000·0.006/(1.908 − 1) = €330.39

Answer

A = €330.39
27.NPV & IRR

Answer: NPV = −16667 €

Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.

Value of the cash flows

PV = 14 000/(0.08 − 0.02) = 233 333.33

NPV

NPV = 233 333.33 − 250 000 = −€16 666.67

Answer

NPV = −€16 666.67

NPV is negative, so the project earns less than the required return.

28.NPV & IRR

Answer: IRR = 8.144 %

Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.

Required annuity factor

(1 − (1 + i)−10)/i = 10 000/1 500 = 6.667

Solve for the rate

The annuity factor falls as the rate rises; bracket the rate and narrow down.

i = 8%: 6.71
i = 9%: 6.418
IRR = 8.144%

Answer

IRR = 8.144%
29.Normal distribution

Answer: P = 0.7626

Normal distribution: convert a value x to a z-score, z = (x − μ)/σ, which counts standard deviations from the mean. A z-table (or Φ(z)) gives the area to the left of z, which is P(X < x). The area to the right is 1 − Φ(z), and the area between two values is the difference of their two areas.

z-scores

z₁ = (164.35 − 178)/7 = −1.95
z₂ = (183.6 − 178)/7 = 0.8

Area between

P = Φ(0.8) − Φ(−1.95) = 0.7881 − 0.02559 = 0.7626

Answer

P = 0.7626
30.Normal distribution

Answer: x = 73.4 points

From an area back to z: Φ(z) is the area to the left of z. For a left-tail area A, find z with Φ(z) = A in the table. A right-tail area A means Φ(z) = 1 − A. A central area A between −z and z leaves (1 − A)/2 in each tail, so Φ(z) = (1 + A)/2. For a value x, use x = μ + zσ.

Area to the left

Φ(z) = 0.8

z from the table

z ≈ 0.84

Back to the original units

x = 65 + 0.84·10 = 73.4 points

Answer

x = 73.4 points

This is independent practice material. ExamProblems is not affiliated with or endorsed by the organisation that runs this exam, and the exam name is used only to describe the content. The FE exam is run by NCEES, which is not affiliated with ExamProblems and does not endorse it.

ExamProblems · examproblems.com/courses/fe-exam-civil