laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)
Open-channel flow (Manning)
Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²
Pumps & pump power
Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)
Time value of money
Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i
Method
Draw a timeline with every cash flow and its timing.
Match the rate to the period: a monthly rate for monthly payments.
Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
Check the sign and the order of magnitude of the answer.
NPV & IRR
Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)
Method
List all cash flows with their year; the investment at year 0 is negative.
Discount each cash flow: CFt/(1 + r)t.
Add them up to get the NPV. Positive means the project earns more than r.
For the IRR, find the rate that makes NPV zero by trial or interpolation.
Normal distribution
z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ
Method
Convert the value to a z-score: z = (x − μ)/σ.
Look up Φ(z), the area to the left of z.
For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
For a percentile, work backwards: find z for the area, then x = μ + z·σ.
2Practice problems
1.Beam support reactionsMedium
The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RB.
L = 8 mP1 = 10 kN at 2 mP2 = 40 kN at 6 m
RB = kN
2.Beam support reactionsHard
The beam has a pin at A and a roller at B, 2.5 m from A, and overhangs B to the free end C. It carries a point load P at 2 m from A and a uniformly distributed load w from 1.5 m to the free end at 4 m. Find the vertical reaction RB, taking upward as positive.
AB = 2.5 mAC = 4 mP = 40 kN at 2 mw = 12 kN/m from 1.5 to 4 m
RB = kN
3.Truss: method of jointsMedium
Use the method of joints to find the force FAB in member AB. Give tension as positive and compression as negative.
span = 6 mheight = 2 mB is 1 m from Avertical load = 55 kN
FAB = kN
4.Truss: method of jointsHard
Use the method of joints to find the force FAB in member AB. Give tension as positive and compression as negative.
span = 6 mheight = 3 mB is 4 m from Avertical load = 35 kNhorizontal load = 5 kN ←
FAB = kN
5.Shear force & bending momentMedium
Find the bending moment Mx at the section x = 4.5 m from support A. Use sagging moments positive and upward shear on the left face positive.
L = 5 mw = 8 kN/m from 0 to 5 mx = 4.5 m
Mx = kN·m
6.Shear force & bending momentHard
The simply supported beam carries a uniformly distributed load w over its whole span and a point load P. Find the maximum bending moment Mmax in the beam.
L = 5 mP = 30 kN at 1.5 mw = 3 kN/m from 0 to 5 m
Mmax = kN·m
7.Beam deflectionMedium
A cantilever of length L is fixed at A and carries a point load P at a distance a = 1.5 m from A. Find the deflection δB at the free end B.
P = 15 kNa = 1.5 mL = 2 mE = 200 GPa (steel)I = 23 × 10⁶ mm⁴
δB = mm
8.Beam deflectionHard
A simply supported beam carries a uniformly distributed load w. Its deflection may not exceed span/360. Find the smallest second moment of area Ireq that meets this limit.
w = 20 kN/mL = 4 mE = 200 GPa (steel)
Ireq = × 10⁶ mm⁴
9.Column bucklingMedium
A column of length L made of aluminium is pinned at both ends. Using Euler’s formula, find its critical buckling load Pcr.
L = 4 mE = 70 GPa (aluminium)d = 60 mm
Pcr = kN
10.Column bucklingHard
A column of length L made of steel is fixed at the base and pinned at the top. Find its slenderness and the critical buckling stress σcr from Euler’s formula.
L = 3 mE = 200 GPa (steel)d = 25 mm
σcr = MPa
11.Centroid & second moment of areaMedium
A symmetric I-section has flanges 150 mm wide and 14 mm thick, an overall depth of 200 mm and a web 12 mm thick. Find its second moment of area Ix about the horizontal centroidal axis x.
B = 150 mmH = 200 mmtf = 14 mmtw = 12 mm
Ix = × 10⁶ mm⁴
12.Centroid & second moment of areaHard
The T-section is used as a beam with the flange on top and carries a sagging bending moment of 30 kN·m. Find the size of the bending stress σtop at the top edge.
A 7 m thick overconsolidated clay layer has Cc = 0.3, Cr = 0.06 and e₀ = 0.8. At its mid-depth the effective vertical stress is 55 kPa and the overconsolidation ratio is OCR = 2. A new building adds 30 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.
In a laboratory oedometer test, a clay specimen 19 mm thick, drained at the top and bottom, reaches 50% consolidation in 4 min. In the field the same clay forms a layer 4.5 m thick. It lies between two sand layers, so water drains out at the top and the bottom. How many days t does the field layer take to reach 50% consolidation?
A vertical rectangular gate 2 m wide sits in the wall of a tank of water, with its top edge 0.5 m below the surface. Find the resultant hydrostatic force F on the gate.
A vertical rectangular gate 1.5 m wide sits in the wall of a tank of glycerin, with its top edge 3 m below the surface. Find the depth ycp of the centre of pressure below the surface.
Water flows at 120 L/s through a pipe 100 m long with an inside diameter of 250 mm. Use the Darcy friction factor f = 0.025 and g = 9.81 m/s². Find the friction head loss hf.
Two open reservoirs are joined by a pipe 100 m long with an inside diameter of 100 mm and a Darcy friction factor f = 0.025. The water surface of the upper reservoir is 9 m above that of the lower one. The minor losses are a square-edged entrance (K = 0.5), 4 bends (K = 0.3 each), a valve (K = 10) and the exit into the lower reservoir (K = 1.0). Use g = 9.81 m/s². Find the flow rate Q in L/s.
A trapezoidal finished concrete channel has a bottom width of 1.5 m and side slopes of 1:1 (horizontal:vertical). Water flows uniformly 1.1 m deep. Manning n = 0.012 and the bed slope is S = 0.002. Find the flow rate Q in m³/s.
b = 1.5 my = 1.1 mz = 1n = 0.012S = 0.002
Q = m³/s
22.Open-channel flow (Manning)Hard
A trapezoidal gravel channel with a bottom width of 3.5 m and side slopes of 2:1 (horizontal:vertical) must carry 15 m³/s in uniform flow at a depth of 1.7 m. Manning n = 0.025. Find the required bed slope S (in m/m).
Q = 15 m³/sb = 3.5 my = 1.7 mz = 2n = 0.025
S = m/m
23.Pumps & pump powerMedium
A pump delivers 60 L/s of water (ρ = 1000 kg/m³) against a head of 38 m. The pump efficiency is 78% and the electric motor driving it has an efficiency of 94%. Use g = 9.81 m/s². Find the electrical power Pel the motor draws, in kW.
A pump moves 20 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 25 m higher. The pipe is 150 m long with an inside diameter of 100 mm and a Darcy friction factor f = 0.022; the minor-loss coefficients add up to ΣK = 6 (entrance and exit included). Use g = 9.81 m/s². Find the head H the pump must add.
You invest €5 000 at 2% per year with continuous compounding. Find the value FV after 14 years.
PV = €5 000r = 2%t = 14
FV = €
26.Time value of moneyHard
You save €150 at the end of every month for 21 years. The account pays 4.8% per year, compounded monthly. How much have you saved at the end? Find FV.
A = €1504.8% / 12N = 252
FV = €
27.NPV & IRRMedium
A project costs €250 000 today. It generates €14 000 at the end of the first year, and the cash flow then grows by 2% per year forever. The cost of capital is 9%. Find the net present value NPV.
C0 = €250 000CF1 = €14 000g = 2%r = 9%
NPV = €
28.NPV & IRRHard
Project A costs €30 000 and returns €17 500, €12 000, €7 000 at the end of years 1 to 3. Project B costs €40 000 and returns €10 000, €17 500, €23 000. Find the crossover rate r* at which both projects have the same NPV, in percent.
The heights of adult men are normally distributed with mean 178 cm and standard deviation 7 cm. What fraction lies between 167.85 and 185.35 cm? Give P as a decimal.
μ = 178σ = 7x1 = 167.85x2 = 185.35
P =
30.Normal distributionHard
The exam scores are normally distributed with mean 65 points and standard deviation 10 points. Find the value x below which 95% of them lie (the 95th percentile).
μ = 65σ = 10P = 95%
x = points
3Solutions
1.Beam support reactions
Answer: RB = 32.5 kN
Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.
Free-body diagram
Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.
Equilibrium
Moments about A, counter-clockwise positive. Then vertical force balance.
ΣMA = 0: RB·8 = 10·2 + 40·6
RB = 260/8 = 32.5 kN
ΣFy = 0: RA = 50 − 32.5 = 17.5 kN
Answer
RB = 32.5 kN
2.Beam support reactions
Answer: RB = 65 kN
Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Replace each distributed load by its resultant (its area) acting at the centroid of the load diagram, and take moments about a support to remove that support’s reaction from the equation.
Resultant of the distributed load
W = 12·2.5 = 30 kN, x̄ = (1.5 + 4)/2 = 2.75 m
Equilibrium
Moments about A, counter-clockwise positive. Then vertical force balance.
ΣMA = 0: RB·2.5 = 40·2 + 30·2.75
RB = 162.5/2.5 = 65 kN
RA = 70 − 65 = 5 kN
Answer
RB = 65 kN
3.Truss: method of joints
Answer: FAB = −51.24 kN
Method of joints: every pin of a truss is in equilibrium, so ΣFx = 0 and ΣFy = 0 at each joint. Start at a joint with at most two unknown member forces. A negative result means the member is in compression.
Support reactions
Equilibrium of the whole truss. Moments about A, counter-clockwise positive.
ΣMA = 0: Cy·6 = 55·1 → Cy = 9.167 kN
ΣFy = 0: Ay = 55 − 9.167 = 45.83 kN
Joint A
Assume every member is in tension (pulling away from the joint). Only AB has a vertical component at A.
sin α = 2/2.236 = 0.8944
ΣFy = 0: Ay + FAB·sin α = 0
FAB = −45.83/0.8944 = −51.24 kN
Answer
FAB = −51.24 kN (compression)
4.Truss: method of joints
Answer: FAB = −23.61 kN
Method of joints: every pin of a truss is in equilibrium, so ΣFx = 0 and ΣFy = 0 at each joint. Start at a joint with at most two unknown member forces. A negative result means the member is in compression.
Support reactions
Equilibrium of the whole truss. Moments about A, counter-clockwise positive.
ΣMA = 0: Cy·6 = 35·4 − 5·3 → Cy = 20.83 kN
ΣFy = 0: Ay = 35 − 20.83 = 14.17 kN
ΣFx = 0: Ax = 5 kN
Joint A
Assume every member is in tension (pulling away from the joint). Only AB has a vertical component at A.
sin α = 3/5 = 0.6
ΣFy = 0: Ay + FAB·sin α = 0
FAB = −14.17/0.6 = −23.61 kN
Answer
FAB = −23.61 kN (compression)
5.Shear force & bending moment
Answer: Mx = 9 kN·m
Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut.
Support reactions
Equilibrium of the whole beam.
UDL resultant: W = w·ℓ = 8·5 = 40 kN, acting at x̄ = 2.5 m
ΣMA = 0: RB·5 = 8·5·2.5
RB = 100/5 = 20 kN
ΣFy = 0: RA = 40 − 20 = 20 kN
Cut at x = 4.5 m and keep the left part
Only forces left of the cut appear. A UDL portion acts as one force at the middle of that portion.
M = RA·x − (each load left of the cut × its distance to the cut)
Mx = 20·4.5 − 8·4.5·2.25 = 9 kN·m
Answer
Mx = 9 kN·m
6.Shear force & bending moment
Answer: Mmax = 39.38 kN·m
Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut. Maximum moment: since dM/dx = V, the bending moment has its peak where the shear force passes through zero, either at a point load or inside a distributed load.
Support reactions
Equilibrium of the whole beam.
UDL resultant: W = w·ℓ = 3·5 = 15 kN, acting at x̄ = 2.5 m
ΣMA = 0: RB·5 = 30·1.5 + 3·5·2.5
RB = 82.5/5 = 16.5 kN
ΣFy = 0: RA = 45 − 16.5 = 28.5 kN
Where is V = 0?
V(1.5⁻) = RA − w·1.5 = 24 kN
V(1.5⁺) = 24 − 30 = −6 kN
The shear changes sign at the load, so the maximum is under the load.
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).
Consistent units
Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.
P = 15000 N, a = 1500 mm, L = 2000 mm
EI = 4.6 × 10¹² N·mm²
Deflection at the free end
Deflection at the load plus the slope at the load times the remaining length.
δP = Pa³/(3EI) = 3.668 mm
θP = Pa²/(2EI) = 0.003668 rad
δB = δP + θP·(L − a) = Pa²(3L − a)/(6EI) = 5.503 mm
Answer
δB = 5.503 mm
8.Beam deflection
Answer: Ireq = 30 × 10⁶ mm⁴
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).
Deflection limit
δallow = L/360 = 4000/360 = 11.11 mm
Required second moment of area
I = 5wL⁴/(384·E·δallow) = 5·20·4000⁴/(384·200000·11.11) = 3 × 10⁷ mm⁴
Ireq = 30 × 10⁶ mm⁴
Answer
Ireq = 30 × 10⁶ mm⁴
9.Column buckling
Answer: Pcr = 27.47 kN
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Smallest second moment of area
A round section has the same I about every axis.
I = πd⁴/64 = π·25⁴/64 = 19175 mm⁴
Radius of gyration and slenderness
A = 490.9 mm²
r = √(I/A) = √(19175/490.9) = 6.25 mm
KL = 0.7·3000 = 2100 mm
KL/r = 2100/6.25 = 336
Critical stress
σcr = π²E/(KL/r)² = π²·200000/336² = 17.48 MPa
Answer
σcr = 17.48 MPa
11.Centroid & second moment of area
Answer: Ix = 41.48 × 10⁶ mm⁴
Second moment of area: for a rectangle about its own centroidal axis I = bh³/12, and about its base bh³/3 (parallel-axis theorem I = Ic + A·d²). A hole is handled by subtracting its I, as long as both parts share the same axis. The elastic section modulus is S = I/c, where c is the distance to the extreme fibre.
Outer rectangle minus the two side cut-outs
Both cut-outs together are (B − tw) wide and hw = H − 2tf high, and share the axis x.
Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.
Split into two rectangles
Measure every y from the bottom edge.
flange: Af = 260·10 = 2600 mm², yf = 280 + 10/2 = 285 mm
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Pore water pressure
Water pressure grows with depth below the water table.
u = γw·(z − zw) = 9.81·9 = 88.29 kPa
Answer
u = 88.29 kPa
14.Effective stress in soil
Answer: σ = 136 kPa
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Total stress
Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.
σ = γd·1 + γsat,sand·3 + γsat,clay·3.5
σ = 16.5·1 + 20·3 + 17·3.5 = 136 kPa
Answer
σ = 136 kPa
15.Consolidation settlement
Answer: S = 44.11 mm
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Preconsolidation pressure
σ′p = OCR·σ′0 = 2·55 = 110 kPa
Compare with the preconsolidation pressure
σ′f = 55 + 30 = 85 kPa ≤ 110 kPa
Settlement
The clay stays on its recompression line.
S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0) = 0.06·7/(1 + 0.8)·log₁₀(85/55) = 44.11 mm
Answer
S = 44.11 mm
16.Consolidation settlement
Answer: t = 155.8 days
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Drainage paths
Hdr,lab = 19/2 = 9.5 mm = 0.0095 m
Hdr,field = 4.5/2 = 2.25 m
Scale the time
t = Tv·Hdr²/cv with the same T_v and cv in the lab and the field.
tfield = 4·(2.25/0.0095)² = 224377 min
tfield = 224377/1440 = 155.8 days
Answer
t = 155.8 days
17.Hydrostatic force
Answer: F = 19.62 kN
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 0.5 + 1/2 = 1 m
A = H·b = 1·2 = 2 m²
Resultant force
F = ρ·g·yc·A = 1000·9.81·1·2 = 19.62 kN
Answer
F = 19.62 kN
18.Hydrostatic force
Answer: ycp = 3.524 m
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 3 + 1/2 = 3.5 m
A = H·b = 1·1.5 = 1.5 m²
Resultant force
F = ρ·g·yc·A = 1260·9.81·3.5·1.5 = 64.89 kN
Centre of pressure
Pressure grows with depth, so the resultant acts below the centroid.
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Mean velocity
A = π·0.25²/4 = 0.04909 m²
V = Q/A = 0.12/0.04909 = 2.445 m/s
Velocity head
V²/(2g) = 2.445²/(2·9.81) = 0.3046 m
Darcy–Weisbach
hf = f·(L/D)·V²/(2g) = 0.025·(100/0.25)·2.445²/(2·9.81) = 3.046 m
Answer
hf = 3.046 m
20.Pipe friction & head loss
Answer: Q = 17 L/s
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Loss coefficients
f·L/D = 0.025·100/0.1 = 25
ΣK = 0.5 + 4·0.3 + 10 + 1.0 = 12.7
Energy equation
Both surfaces are open to the air and practically at rest, so all of Δz is lost in the pipe.
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Geometry
A = (b + z·y)·y = (1.5 + 1·1.1)·1.1 = 2.86 m²
P = b + 2y·√(1 + z²) = 1.5 + 2·1.1·√(1 + 1²) = 4.611 m
R = A/P = 0.6202 m
Velocity
V = (1/0.012)·0.62022/3·0.0021/2 = 2.71 m/s
Flow rate
Q = A·V = 2.86·2.71 = 7.752 m³/s
Answer
Q = 7.752 m³/s
22.Open-channel flow (Manning)
Answer: S = 0.0009498 m/m
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Geometry
A = (b + z·y)·y = (3.5 + 2·1.7)·1.7 = 11.73 m²
P = b + 2y·√(1 + z²) = 3.5 + 2·1.7·√(1 + 2²) = 11.1 m
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Hydraulic power
Ph = ρ·g·Q·H = 1000·9.81·0.06·38 = 22.37 kW
Shaft power
Pshaft = 22.37/0.78 = 28.68 kW
Electrical power
Pel = 28.68/0.94 = 30.51 kW
Answer
Pel = 30.51 kW
24.Pumps & pump power
Answer: H = 37.89 m
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Both surfaces are open and practically at rest, so pressure and velocity terms drop out.
H = Δz + hL = 25 + 12.89 = 37.89 m
Answer
H = 37.89 m
25.Time value of money
Answer: FV = 6616 €
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
Exponent
r·t = 0.02·14 = 0.28
e0.28 = 1.323
Future value
FV = 5 000·1.323 = €6 615.65
Answer
FV = €6 615.65
26.Time value of money
Answer: FV = 65048 €
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
You paid in €37 800 yourself; the rest is interest.
27.NPV & IRR
Answer: NPV = −50000 €
Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.
Value of the cash flows
PV = 14 000/(0.09 − 0.02) = 200 000.00
NPV
NPV = 200 000.00 − 250 000 = −€50 000.00
Answer
NPV = −€50 000.00
NPV is negative, so the project earns less than the required return.
28.NPV & IRR
Answer: r* = 9.287 %
Crossover rate: the discount rate at which two projects have the same NPV. It is the IRR of the difference in their cash flows (B − A). Below it the project with the later, larger cash flows has the higher NPV; above it the other one wins.
Difference in cash flows
ΔCF0 = −40 000 − (−30 000) = −10 000
ΔCF1 = 10 000 − 17 500 = −7 500
ΔCF2 = 17 500 − 12 000 = 5 500
ΔCF3 = 23 000 − 7 000 = 16 000
IRR of the difference
NPVΔ(9%) = 103.44
NPVΔ(10%) = −251.69
r* = 9.287%
Answer
r* = 9.287%
Check: at 9.287% both NPVs are €1 422.68.
29.Normal distribution
Answer: P = 0.7796
Normal distribution: convert a value x to a z-score, z = (x − μ)/σ, which counts standard deviations from the mean. A z-table (or Φ(z)) gives the area to the left of z, which is P(X < x). The area to the right is 1 − Φ(z), and the area between two values is the difference of their two areas.
Normal distribution: convert a value x to a z-score, z = (x − μ)/σ, which counts standard deviations from the mean. A z-table (or Φ(z)) gives the area to the left of z, which is P(X < x). The area to the right is 1 − Φ(z), and the area between two values is the difference of their two areas.
z for the percentile
Φ(z) = 0.95 → z = 1.645
Back to x
x = 65 + 1.645·10 = 81.45 points
Answer
x = 81.45 points