1Formulas and methods

Beam support reactions

Equilibrium
ΣFx = 0, ΣFy = 0, ΣM = 0
Uniform load
resultant w·L at the middle of the load
Moment
M = F·d

Method

  1. Draw a free-body diagram and replace each support by its reactions.
  2. Replace every distributed load by a single force at its centroid.
  3. Take moments about one support to find the reaction at the other.
  4. Use ΣFy = 0 to find the remaining reaction, and check with a second moment equation.

Truss: method of joints

Method of joints
ΣFx = 0, ΣFy = 0 at each joint
Method of sections
ΣM = 0 about a cut point
Member force
positive = tension, negative = compression

Method

  1. Find the support reactions for the whole truss.
  2. Method of joints: start at a joint with at most two unknown member forces and use ΣFx = 0 and ΣFy = 0.
  3. Method of sections: cut through the member you need and take moments about a point where the other unknown members meet.
  4. Assume tension; a negative answer means compression.

Shear force & bending moment

Shear and moment
V = ΣF on one side, M = ΣF·d on one side
Bending stress
σ = M·y/I
Rectangle
I = bh³/12
Section modulus
W = I/ymax
Simply supported, uniform load
Mmax = wL²/8

Method

  1. Find the support reactions from equilibrium of the whole beam.
  2. Cut the beam at the section you need and keep one side.
  3. Shear force: sum of the vertical forces on that side. Bending moment: sum of their moments about the cut.
  4. For the maximum moment, find where the shear force is zero.

Beam deflection

Point load at midspan
δ = PL³/(48EI)
Uniform load, simply supported
δ = 5wL⁴/(384EI)
Cantilever, end load
δ = PL³/(3EI)
Cantilever, uniform load
δ = wL⁴/(8EI)
Superposition
δ = δ1 + δ2

Column buckling

Euler load
Pcr = π²EI/(KL)²
Effective length factor
K = 1 pinned–pinned, 0.5 fixed–fixed, 0.7 fixed–pinned, 2 fixed–free
Critical stress
σcr = Pcr/A
Slenderness
λ = KL/r, r = √(I/A)

Centroid & second moment of area

Centroid
ȳ = ΣAiyi/ΣAi
Rectangle
I = bh³/12
Parallel-axis theorem
I = Ic + A·d²
Composite section
I = Σ(Ic,i + Aidi²)

Effective stress in soil

Total stress
σ = Σγi·hi
Pore water pressure
u = γw·(z − zw)
Effective stress
σ′ = σ − u
Water
γw = 9.81 kN/m³

Consolidation settlement

Normally consolidated
S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0)
Final stress
σ′f = σ′0 + Δσ (at mid-depth of the layer)
Overconsolidated, σ′f ≤ σ′p
S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0)
Overconsolidated, σ′f > σ′p
S = H/(1 + e0)·[Cr·log₁₀(σ′p/σ′0) + Cc·log₁₀(σ′f/σ′p)]
Overconsolidation ratio
OCR = σ′p/σ′0
Time for consolidation
t = Tv·Hdr²/cv
Drainage path
Hdr = H/2 (double drainage), H (single drainage)
Time factors
U 50% → 0.197, 60% → 0.287, 70% → 0.403, 80% → 0.567, 90% → 0.848

Hydrostatic force

Pressure at depth
p = ρgh
Force on a vertical wall
F = ρg·hc·A
Centre of pressure
yp = yc + Ic/(ycA)
Rectangle
Ic = bH³/12

Pipe friction & head loss

Reynolds number
Re = V·D/ν = ρ·V·D/μ
Flow regime
laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)

Open-channel flow (Manning)

Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²

Pumps & pump power

Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)

Time value of money

Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i

Method

  1. Draw a timeline with every cash flow and its timing.
  2. Match the rate to the period: a monthly rate for monthly payments.
  3. Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
  4. Check the sign and the order of magnitude of the answer.

NPV & IRR

Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)

Method

  1. List all cash flows with their year; the investment at year 0 is negative.
  2. Discount each cash flow: CFt/(1 + r)t.
  3. Add them up to get the NPV. Positive means the project earns more than r.
  4. For the IRR, find the rate that makes NPV zero by trial or interpolation.

Normal distribution

z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ

Method

  1. Convert the value to a z-score: z = (x − μ)/σ.
  2. Look up Φ(z), the area to the left of z.
  3. For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
  4. For a percentile, work backwards: find z for the area, then x = μ + z·σ.

2Practice problems

1.Beam support reactionsMedium
P1​ = 60 kNP2​ = 45 kNABRA​RB​ = ?4 m4 m2 m

The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RB.

L = 10 mP1 = 60 kN at 4 mP2 = 45 kN at 8 m
RB = kN
2.Beam support reactionsHard
w0​ = 8 kN/mP = 10 kNABMA​ = ?1.5 m3.5 m

The cantilever beam is fixed to the wall at A. It carries a linearly varying load that is zero at the wall and rises to 8 kN/m at the free end B, plus a point load P at 1.5 m from the wall. Find the magnitude of the reaction moment MA at the wall.

L = 5 mw0 = 8 kN/mP = 10 kN at 1.5 m
MA = kN·m
3.Truss: method of jointsMedium
ABCDEFGH30 kN10 kN15 kN25 kN4 × 4 m4 m

Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.

B: 30 kN ↓C: 10 kN ↓G: 15 kN ↓H: 25 kN ↓
  1. 1member AB
  2. 2member BC
  3. 3member CD
  4. 4member DE
  5. 5member FG
  6. 6member GH
  7. 7member AF
  8. 8member HE
  9. 9member BF
  10. 10member CG
  11. 11member DH
  12. 12member FC
  13. 13member HC
4.Truss: method of jointsHard
ABCDEFGH10 kN30 kN10 kN4 × 3 m4 m

Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.

D: 10 kN ↓F: 30 kN →G: 10 kN ↓
  1. 1member AB
  2. 2member BC
  3. 3member CD
  4. 4member DE
  5. 5member FG
  6. 6member GH
  7. 7member AF
  8. 8member HE
  9. 9member BF
  10. 10member CG
  11. 11member DH
  12. 12member BG
  13. 13member DG
5.Shear force & bending momentMedium
15 kN50 kNABCDEFG1 m1 m1 m1 m1 m1 m

The marks A to G split the beam into six equal parts. At which mark is the bending moment largest in size, sagging or hogging? Click it in the diagram.

15 kN @ 2 m50 kN @ 5 m
  1. 1A (x = 0 m)
  2. 2B (x = 1 m)
  3. 3C (x = 2 m)
  4. 4D (x = 3 m)
  5. 5E (x = 4 m)
  6. 6F (x = 5 m)
  7. 7G (x = 6 m)
6.Shear force & bending momentHard
w = 3 kN/mP = 15 kNABsection3.5 m0.5 m1 m

Find the bending moment Mx at the section x = 3.5 m from support A. Use sagging moments positive and upward shear on the left face positive.

L = 5 mP = 15 kN at 4 mw = 3 kN/m from 0 to 5 mx = 3.5 m
Mx = kN·m
7.Beam deflectionMedium
w = 10 kN/mδL = 6 m

A simply supported beam carries a uniformly distributed load w over its whole span. Find the maximum deflection δmax, at midspan.

w = 10 kN/mL = 6 mE = 200 GPa (steel)I = 120 × 10⁶ mm⁴
δmax = mm
8.Beam deflectionHard
w = 2.5 kN/mABδ3.5 m

A simply supported timber beam of rectangular section, 100 mm wide, carries a uniformly distributed load w over its whole span. Its midspan deflection may not exceed span/250. Find the smallest depth hreq of the section.

w = 2.5 kN/mL = 3.5 mE = 11 GPa (timber)b = 100 mm
hreq = mm
9.Column bucklingMedium
PL = 6 md = 60 mmcross-section

A column of length L made of aluminium is fixed at the base and free at the top. Using Euler’s formula, find its critical buckling load Pcr.

L = 6 mE = 70 GPa (aluminium)d = 60 mm
Pcr = kN
10.Column bucklingHard
P = 65 kNL = 2.5 md = ?cross-section

A solid round column of length L made of aluminium is fixed at the base and free at the top. It must carry 65 kN with a factor of safety of 2.5 against buckling. Find the smallest diameter d.

P = 65 kNn = 2.5L = 2.5 mE = 70 GPa (aluminium)
d = mm
11.Centroid & second moment of areaMedium
xD = 160d = 144dimensions in mm

A circular tube has outside diameter D = 160 mm and inside diameter d = 144 mm. Find its radius of gyration r about the horizontal centroidal axis.

D = 160 mmd = 144 mm
r = mm
12.Centroid & second moment of areaHard
10025022390208xdimensions in mm

A welded I-section has a top flange 100 × 22 mm, a web 390 mm high and 8 mm thick, and a bottom flange 250 × 20 mm (width × thickness). Find its second moment of area Ix about the horizontal axis x through its centroid.

top flange: 100 × 22 mmweb: 8 × 390 mmbottom flange: 250 × 20 mm
Ix = × 10⁶ mm⁴
13.Effective stress in soilMedium
sandγd​ = 17 kN/m³γsat​ = 20 kN/m³10 mwater tableXz = 5 m

For the soil profile shown, find the vertical effective stress σ′ at point X.

z = 5 mzw = 3 mγw = 9.81 kN/m³sand: γd = 17 kN/m³sand: γsat = 20 kN/m³
σ′ = kPa
14.Effective stress in soilHard
sandγd​ = 16 kN/m³γsat​ = 20.5 kN/m³6 mclayγsat​ = 17 kN/m³4 mwater tableXz = 8 m

For the soil profile shown, find the pore water pressure u at point X.

z = 8 mzw = 1 mγw = 9.81 kN/m³sand: γd = 16 kN/m³sand: γsat = 20.5 kN/m³clay: γsat = 17 kN/m³
u = kPa
15.Consolidation settlementMedium
Δσ = 45 kPasandclayCc​ = 0.3, Cr​ = 0.04e0​ = 0.7σ′0​ = 75 kPaσ′p​ = 135 kPa2 mwater table

A 2 m thick overconsolidated clay layer has Cc = 0.3, Cr = 0.04 and e₀ = 0.7. At its mid-depth the effective vertical stress is 75 kPa and the preconsolidation pressure is 135 kPa. A new building adds 45 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.

H = 2 mCc = 0.3Cr = 0.04e0 = 0.7σ′0 = 75 kPaσ′p = 135 kPaΔσ = 45 kPa
S = mm
16.Consolidation settlementHard
sandclayH = 3.5 mcv​ = 1.5 m²/year3.5 mimpervious rockwater table

A clay layer 3.5 m thick has a coefficient of consolidation cv = 1.5 m²/year. It lies on impervious rock, with sand above it, so water drains out only at the top. For 90% average consolidation the time factor is Tv = 0.848. How many years t does the layer take to reach 90% consolidation?

H = 3.5 mcv = 1.5 m²/yearU = 90%Tv = 0.848single drainage
t = years
17.Hydrostatic forceMedium
gated = 0.5 mH = 1.5 m

A vertical rectangular gate 3 m wide sits in the wall of a tank of water, with its top edge 0.5 m below the surface. Find the resultant hydrostatic force F on the gate.

d = 0.5 mH = 1.5 mb = 3 mρ = 1000 kg/m³g = 9.81 m/s²
F = kN
18.Hydrostatic forceHard
gated = 1.5 mH = 1 m

A vertical rectangular gate 3 m wide sits in the wall of a tank of seawater, with its top edge 1.5 m below the surface. Find the resultant hydrostatic force F on the gate.

d = 1.5 mH = 1 mb = 3 mρ = 1025 kg/m³g = 9.81 m/s²
F = kN
19.Pipe friction & head lossMedium
V = 1.8 m/sD = 50 mmL = 300 mf = 0.03

Water flows at a mean velocity of 1.8 m/s through a pipe 300 m long with an inside diameter of 50 mm. Use the Darcy friction factor f = 0.03 and g = 9.81 m/s². Find the friction head loss hf.

V = 1.8 m/sL = 300 mD = 50 mmf = 0.03g = 9.81 m/s²
hf = m
20.Pipe friction & head lossHard
K = 2Δz = 22 mL = 100 m, D = 150 mm, f = 0.0152× bend (K = 0.3)

Two open reservoirs are joined by a pipe 100 m long with an inside diameter of 150 mm and a Darcy friction factor f = 0.015. The water surface of the upper reservoir is 22 m above that of the lower one. The minor losses are a square-edged entrance (K = 0.5), 2 bends (K = 0.3 each), a valve (K = 2) and the exit into the lower reservoir (K = 1.0). Use g = 9.81 m/s². Find the flow rate Q in L/s.

Δz = 22 mL = 100 mD = 150 mmf = 0.015Kentrance = 0.5Kbend = 0.3 (×2)Kvalve = 2Kexit = 1.0
Q = L/s
21.Open-channel flow (Manning)Medium
D = 900 mmn = 0.013, S = 0.005

A concrete storm sewer with an inside diameter of 900 mm flows half full. Manning n = 0.013 and the slope is S = 0.005. Find the flow rate Q in m³/s.

D = 900 mmn = 0.013S = 0.005
Q = m³/s
22.Open-channel flow (Manning)Hard
D = 200 mmn = 0.013, V = 1 m/s

A concrete sewer with an inside diameter of 200 mm (Manning n = 0.013) must reach a self-cleansing velocity of 1 m/s when flowing just full. Find the minimum slope S (in m/m).

D = 200 mmn = 0.013V = 1 m/s
S = m/m
23.Pumps & pump powerMedium
PQ = 15 L/sH = 74 m

A pump delivers 15 L/s of water (ρ = 1000 kg/m³) against a head of 74 m. The pump efficiency is 82% and the electric motor driving it has an efficiency of 94%. Use g = 9.81 m/s². Find the electrical power Pel the motor draws, in kW.

Q = 15 L/sH = 74 mηpump = 82%ηmotor = 94%g = 9.81 m/s²
Pel = kW
24.Pumps & pump powerHard
PQ = 120 L/sΔz = 36 mL = 300 m, D = 250 mm, f = 0.018, ΣK = 8

A pump moves 120 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 36 m higher. The pipe is 300 m long with an inside diameter of 250 mm and a Darcy friction factor f = 0.018; the minor-loss coefficients add up to ΣK = 8 (entrance and exit included). Use g = 9.81 m/s². Find the head H the pump must add.

Q = 120 L/sΔz = 36 mL = 300 mD = 250 mmf = 0.018ΣK = 8
H = m
25.Time value of moneyMedium
years0123…9PV = ?€8 000+4%+4%…r = 10%

A property is expected to earn net rent of €8 000 next year. The rent is expected to grow by 4% per year forever. The required return is 10% per year. Find the value PV of the property today.

C1 = €8 000g = 4%r = 10%
PV = €
26.Time value of moneyHard
months01…132…300€150 000AB = ?A7.2% / 12

A mortgage of €150 000 is repaid with equal monthly payments over 25 years at 7.2% per year, compounded monthly. How much is still owed just after the payment at the end of year 11? Find the outstanding balance B.

P = €150 0007.2% / 12N = 300k = 132
B = €
27.NPV & IRRMedium
years0123…10€50 000€1 500€1 500€1 500€1 500r = 10%, EAC = ?

A machine costs €50 000 today, lasts 10 years and costs €1 500 per year to run (paid at the end of each year). The cost of capital is 10%. Find its equivalent annual cost EAC.

C0 = €50 000M = €1 500n = 10r = 10%
EAC = €
28.NPV & IRRHard
years0123−20 0008 5008 5008 500

An investment of €20 000 returns €8 500 at the end of each year for 3 years. Find its internal rate of return IRR in percent.

C0 = €20 000CF = €8 500n = 3
IRR = %
29.Normal distributionMedium
−3−2−10123zshaded area between −z and z = 0.9281

Drag z so that the shaded area between −z and z under the standard normal curve is 0.9281. Find z to two decimals.

A = 0.9281
z =
30.Normal distributionHard
0.04 mm0D − d?

Hole diameters D are normal with mean 25.04 mm and standard deviation 0.02 mm. Shaft diameters d are independent and normal with mean 25 mm and standard deviation 0.01 mm. A randomly chosen shaft fits when D − d > 0. Find the probability P that it fits. Round z to two decimals.

hole: μ = 25.04 mm, σ = 0.02 mmshaft: μ = 25 mm, σ = 0.01 mm
P =

3Solutions

1.Beam support reactions

Answer: RB = 60 kN

Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.

P1​ = 60 kNP2​ = 45 kNABRA​RB​4 m4 m2 m

Free-body diagram

Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.

Equilibrium

Moments about A, counter-clockwise positive. Then vertical force balance.

ΣMA = 0: RB·10 = 60·4 + 45·8
RB = 600/10 = 60 kN
ΣFy = 0: RA = 105 − 60 = 45 kN

Answer

RB = 60 kN
2.Beam support reactions

Answer: MA = 81.67 kN·m

Cantilever equilibrium: a fixed support can push up and also resist rotation, so it gives a vertical reaction RA and a reaction moment MA. ΣFy = 0 gives RA, and moments about the wall give MA = Σ(load × distance from the wall). A distributed load acts as its resultant at the centroid of the load diagram.

Resultant of the triangular load

W = ½·8·5 = 20 kN
x̄ = 2L/3 = 3.333 m

Moment about the wall

MA = W·x̄ + P·a = 20·3.333 + 10·1.5 = 81.67 kN·m

Answer

MA = 81.67 kN·m
3.Truss: method of joints

Answer: member DH

Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.

Joint D

CD and DE lie on one straight line and the joint carries no load. Balancing forces across that line leaves only DH.

ΣF⊥ = 0 → FDH = 0

Check with the method of joints

Solving all joints gives these member forces (T = tension, C = compression).

AB: 41.25 kN (T), BC: 41.25 kN (T), CD: 38.75 kN (T), DE: 38.75 kN (T), FG: 52.5 kN (C), GH: 52.5 kN (C), AF: 58.34 kN (C), HE: 54.8 kN (C), BF: 30 kN (T), CG: 15 kN (C), DH: 0, FC: 15.91 kN (T), HC: 19.45 kN (T)

Answer

Zero-force member: DH
4.Truss: method of joints

Answer: member CG

Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.

Joint C

BC and CD lie on one straight line and the joint carries no load. Balancing forces across that line leaves only CG.

ΣF⊥ = 0 → FCG = 0

Check with the method of joints

Solving all joints gives these member forces (T = tension, C = compression).

AB: 28.13 kN (T), BC: 26.25 kN (T), CD: 26.25 kN (T), DE: 16.87 kN (T), FG: 28.13 kN (C), GH: 16.87 kN (C), AF: 3.125 kN (T), HE: 28.12 kN (C), BF: 2.5 kN (C), CG: 0, DH: 22.5 kN (T), BG: 3.125 kN (T), DG: 15.63 kN (C)

Answer

Zero-force member: CG
5.Shear force & bending moment

Answer: F (x = 5 m)

Largest bending moment: M changes slope wherever the shear force changes, so its peaks sit where the shear force crosses zero: under a point load, inside a distributed load, or over a support of an overhang. At a fixed support of a cantilever the moment is largest at the wall. Compare the size of M at those places, sagging or hogging.

Support reactions

Take moments about one support, then use the vertical force balance.

R1 = 18.33 kN, R2 = 46.67 kN

Bending moment at every mark

Sum the moments of all forces on one side of the cut. Sagging is positive, hogging negative.

MA = 0, MB = 18.33, MC = 36.67, MD = 40, ME = 43.33, MF = 46.67 kN·m, MG = 0

Answer

Mark F: MF = 46.67 kN·m
6.Shear force & bending moment

Answer: Mx = 18.38 kN·m

Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut.

Support reactions

Equilibrium of the whole beam.

UDL resultant: W = w·ℓ = 3·5 = 15 kN, acting at x̄ = 2.5 m
ΣMA = 0: RB·5 = 15·4 + 3·5·2.5
RB = 97.5/5 = 19.5 kN
ΣFy = 0: RA = 30 − 19.5 = 10.5 kN
w = 3 kN/mP = 15 kNABRA​ = 10.5RB​ = 19.5section3.5 m0.5 m1 m

Cut at x = 3.5 m and keep the left part

Only forces left of the cut appear. A UDL portion acts as one force at the middle of that portion.

M = RA·x − (each load left of the cut × its distance to the cut)
Mx = 10.5·3.5 − 3·3.5·1.75 = 18.38 kN·m

Answer

Mx = 18.38 kN·m
7.Beam deflection

Answer: δmax = 7.031 mm

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).

Consistent units

Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.

w = 10 N/mm, L = 6000 mm
EI = 2.4 × 10¹³ N·mm²

Deflection

δmax = 5wL⁴/(384EI) = 5·10·6000⁴/(384·2.4 × 10¹³) = 7.031 mm

Answer

δmax = 7.031 mm
8.Beam deflection

Answer: hreq = 156.1 mm

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).

Consistent units

Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.

w = 2.5 N/mm, L = 3500 mm, E = 11000 N/mm²

Deflection limit

δallow = L/250 = 3500/250 = 14 mm

Required second moment of area

Ireq = 5wL⁴/(384·E·δallow) = 5·2.5·3500⁴/(384·11000·14) = 3.172 × 10⁷ mm⁴

Required depth

bh³/12 = Ireq → h = (12·3.172 × 10⁷/100)1/3 = 156.1 mm

Answer

hreq = 156.1 mm

In practice, choose the next standard depth above this value.

9.Column buckling

Answer: Pcr = 3.052 kN

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Smallest second moment of area

A round section has the same I about every axis.

I = πd⁴/64 = π·60⁴/64 = 636173 mm⁴

Effective length

KL = 2·6000 = 12000 mm

Critical load

Pcr = π²EI/(KL)² = π²·70000·636173/12000² = 3052 N = 3.052 kN

Answer

Pcr = 3.052 kN
10.Column buckling

Answer: d = 104.6 mm

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Required critical load

Pcr = n·P = 2.5·65000 = 162500 N
KL = 2·2500 = 5000 mm

Solve for the diameter

d = (64·n·P·(KL)²/(π³E))^(1/4) = (64·162500·5000²/(π³·70000))^(1/4) = 104.6 mm

Answer

d = 104.6 mm

Check: the slenderness KL/r is 191.2, so the column is slender and Euler applies.

11.Centroid & second moment of area

Answer: r = 53.81 mm

Second moment of area: for a rectangle about its own centroidal axis I = bh³/12, and about its base bh³/3 (parallel-axis theorem I = Ic + A·d²). A hole is handled by subtracting its I, as long as both parts share the same axis. The elastic section modulus is S = I/c, where c is the distance to the extreme fibre. The radius of gyration r = √(I/A) is the distance at which the whole area would give the same I; it is used in column buckling.

Net area and second moment of area

A = π(D² − d²)/4 = 3820 mm²
I = π(D⁴ − d⁴)/64 = 1.106 × 10⁷ mm⁴

Radius of gyration

r = √(I/A) = √(1.106 × 10⁷/3820) = 53.81 mm

Answer

r = 53.81 mm
12.Centroid & second moment of area

Answer: Ix = 311.6 × 10⁶ mm⁴

Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.

Split into three rectangles

Measure every y from the bottom edge.

top flange: A = 2200 mm², y = 421 mm
web: A = 3120 mm², y = 215 mm
bottom flange: A = 5000 mm², y = 10 mm

Centroid

ȳ = (2200·421 + 3120·215 + 5000·10)/10320 = 159.6 mm

Parallel-axis theorem

top flange: 100·22³/12 + 2200·261.4² = 1.504 × 10⁸ mm⁴
web: 8·390³/12 + 3120·55.41² = 4.912 × 10⁷ mm⁴
bottom flange: 250·20³/12 + 5000·149.6² = 1.121 × 10⁸ mm⁴
Ix = 1.504 × 10⁸ + 4.912 × 10⁷ + 1.121 × 10⁸
Ix = 3.116 × 10⁸ mm⁴ = 311.6 × 10⁶ mm⁴

Answer

Ix = 311.6 × 10⁶ mm⁴
13.Effective stress in soil

Answer: σ′ = 71.38 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Total stress

Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.

σ = γd·zw + γsat·(z − zw) = 17·3 + 20·2 = 91 kPa

Pore water pressure

Water pressure grows with depth below the water table.

u = γw·(z − zw) = 9.81·2 = 19.62 kPa

Effective stress

σ′ = σ − u = 91 − 19.62 = 71.38 kPa

Answer

σ′ = 71.38 kPa
14.Effective stress in soil

Answer: u = 68.67 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Pore water pressure

Water pressure grows with depth below the water table.

u = γw·(z − zw) = 9.81·7 = 68.67 kPa

Answer

u = 68.67 kPa
15.Consolidation settlement

Answer: S = 9.606 mm

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Compare with the preconsolidation pressure

σ′f = 75 + 45 = 120 kPa ≤ 135 kPa

Settlement

The clay stays on its recompression line.

S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0) = 0.04·2/(1 + 0.7)·log₁₀(120/75) = 9.606 mm

Answer

S = 9.606 mm
16.Consolidation settlement

Answer: t = 6.925 years

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Drainage path

Hdr = H = 3.5 m

Time

t = Tv·Hdr²/cv = 0.848·3.5²/1.5 = 6.925 years

Answer

t = 6.925 years
17.Hydrostatic force

Answer: F = 55.18 kN

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 0.5 + 1.5/2 = 1.25 m
A = H·b = 1.5·3 = 4.5 m²
gated = 0.5 mH = 1.5 mF

Resultant force

F = ρ·g·yc·A = 1000·9.81·1.25·4.5 = 55.18 kN

Answer

F = 55.18 kN
18.Hydrostatic force

Answer: F = 60.33 kN

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 1.5 + 1/2 = 2 m
A = H·b = 1·3 = 3 m²
gated = 1.5 mH = 1 mF

Resultant force

F = ρ·g·yc·A = 1025·9.81·2·3 = 60.33 kN

Answer

F = 60.33 kN
19.Pipe friction & head loss

Answer: hf = 29.72 m

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Velocity head

V²/(2g) = 1.8²/(2·9.81) = 0.1651 m

Darcy–Weisbach

hf = f·(L/D)·V²/(2g) = 0.03·(300/0.05)·1.8²/(2·9.81) = 29.72 m

Answer

hf = 29.72 m
20.Pipe friction & head loss

Answer: Q = 97.77 L/s

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Loss coefficients

f·L/D = 0.015·100/0.15 = 10
ΣK = 0.5 + 2·0.3 + 2 + 1.0 = 4.1

Energy equation

Both surfaces are open to the air and practically at rest, so all of Δz is lost in the pipe.

22 = (10 + 4.1)·V²/(2·9.81)
V = √(2·9.81·22/14.1) = 5.533 m/s

Flow rate

Q = V·π·D²/4 = 5.533·0.01767 = 0.09777 m³/s = 97.77 L/s

Answer

Q = 97.77 L/s
21.Open-channel flow (Manning)

Answer: Q = 0.64 m³/s

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Geometry

A = 0.3181 m², R = D/4 = 0.225 m

Velocity

V = (1/0.013)·0.2252/3·0.0051/2 = 2.012 m/s

Flow rate

Q = A·V = 0.3181·2.012 = 0.64 m³/s

Answer

Q = 0.64 m³/s
22.Open-channel flow (Manning)

Answer: S = 0.009175 m/m

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Hydraulic radius

R = D/4 = 0.2/4 = 0.05 m

Solve Manning for S

S = (n·V/R2/3)² = (0.013·1/0.1357)² = 0.009175

Answer

S = 0.009175

That is a fall of 9.175 m per kilometre.

23.Pumps & pump power

Answer: Pel = 14.13 kW

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Hydraulic power

Ph = ρ·g·Q·H = 1000·9.81·0.015·74 = 10.89 kW

Shaft power

Pshaft = 10.89/0.82 = 13.28 kW

Electrical power

Pel = 13.28/0.94 = 14.13 kW

Answer

Pel = 14.13 kW
24.Pumps & pump power

Answer: H = 45.02 m

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Velocity

V = Q/A = 0.12/0.04909 = 2.445 m/s
V²/(2g) = 0.3046 m

Head losses

hL = (f·L/D + ΣK)·V²/(2g) = (21.6 + 8)·0.3046 = 9.016 m

Pump head

Both surfaces are open and practically at rest, so pressure and velocity terms drop out.

H = Δz + hL = 36 + 9.016 = 45.02 m

Answer

H = 45.02 m
25.Time value of money

Answer: PV = 133333 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Growing perpetuity

PV = C1/(r − g) = 8 000/(0.1 − 0.04) = 8 000/0.06 = €133 333.33

Answer

PV = €133 333.33
26.Time value of money

Answer: B = 114046 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Monthly payment

i = 0.006, N = 300
A = 150 000·0.006/(1 − (1 + 0.006)−300) = €1 079.38

Present value of the remaining payments

Whatever is still owed must be exactly paid off by the remaining payments.

N − k = 300 − 132 = 168
B = 1079·(1 − (1 + 0.006)−168)/0.006 = €114 045.99

Answer

B = €114 045.99
27.NPV & IRR

Answer: EAC = 9637 €

Equivalent annual cost: spread the present value of all costs over the life as an equal yearly amount (an annuity): EAC = PV·r/(1 − (1 + r)⁻ⁿ). It lets you compare machines with different lives.

Annuity factor

(1 − 1.1−10)/0.1 = 6.145

Annualised purchase price

50 000/6.145 = 8 137.27

EAC

EAC = 8 137.27 + 1 500 = €9 637.27

Answer

EAC = €9 637.27
28.NPV & IRR

Answer: IRR = 13.21 %

Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.

Required annuity factor

(1 − (1 + i)−3)/i = 20 000/8 500 = 2.353

Solve for the rate

The annuity factor falls as the rate rises; bracket the rate and narrow down.

i = 13%: 2.361
i = 14%: 2.322
IRR = 13.21%

Answer

IRR = 13.21%
29.Normal distribution

Answer: z = 1.8

From an area back to z: Φ(z) is the area to the left of z. For a left-tail area A, find z with Φ(z) = A in the table. A right-tail area A means Φ(z) = 1 − A. A central area A between −z and z leaves (1 − A)/2 in each tail, so Φ(z) = (1 + A)/2. For a value x, use x = μ + zσ.

Area to the left of z

Φ(z) = (1 + 0.9281)/2 = 0.9641

Read the z-table backwards

Find 0.9641 inside the table and read off z.

z = 1.80

Answer

z = 1.80
30.Normal distribution

Answer: P = 0.9633

Sums and differences of normal variables: if X and Y are independent and normal, X + Y and X − Y are normal too. Means add or subtract: E(X ± Y) = μX ± μY. Variances always add, also for a difference: Var(X ± Y) = σX² + σY², so σ = √(σX² + σY²). Standard deviations never add directly. The total of n independent items with the same distribution has mean n·μ and standard deviation σ·√n. Then standardise as usual: z = (x − mean)/σ and read Φ(z).

Distribution of the difference

μ = 25.04 − 25 = 0.04 mm, σ = 0.02236 mm

Standardise

z = (0 − 0.04)/0.02236 = −1.79

Probability

P = 1 − Φ(−1.79) = 0.9633

Answer

P = 0.9633