laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)
Open-channel flow (Manning)
Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²
Pumps & pump power
Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)
Time value of money
Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i
Method
Draw a timeline with every cash flow and its timing.
Match the rate to the period: a monthly rate for monthly payments.
Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
Check the sign and the order of magnitude of the answer.
NPV & IRR
Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)
Method
List all cash flows with their year; the investment at year 0 is negative.
Discount each cash flow: CFt/(1 + r)t.
Add them up to get the NPV. Positive means the project earns more than r.
For the IRR, find the rate that makes NPV zero by trial or interpolation.
Normal distribution
z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ
Method
Convert the value to a z-score: z = (x − μ)/σ.
Look up Φ(z), the area to the left of z.
For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
For a percentile, work backwards: find z for the area, then x = μ + z·σ.
2Practice problems
1.Beam support reactionsMedium
The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RB.
L = 4 mP1 = 10 kN at 1.5 mP2 = 15 kN at 3 m
RB = kN
2.Beam support reactionsHard
The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RA.
L = 10 mP = 20 kN at 1 mw = 3 kN/m from 7 to 9 m
RA = kN
3.Truss: method of jointsMedium
Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.
B: 35 kN ↓C: 35 kN ↓D: 20 kN ↓
1member AB
2member BC
3member CD
4member DE
5member FG
6member GH
7member AF
8member HE
9member BF
10member CG
11member DH
12member FC
13member HC
4.Truss: method of jointsHard
Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.
D: 10 kN ↓F: 25 kN →G: 15 kN ↓
1member AB
2member BC
3member CD
4member DE
5member FG
6member GH
7member AF
8member HE
9member BF
10member CG
11member DH
12member FC
13member HC
5.Shear force & bending momentMedium
The simply supported beam carries a clockwise couple M0 = 45 kN·m at x = 2 m from A, and no other load. Find the bending moment Mx just to the right of the couple. Use sagging moments positive and upward shear on the left face positive.
L = 10 mM0 = 45 kN·m clockwise, at 2 m
Mx = kN·m
6.Shear force & bending momentHard
Find the bending moment Mx at the section x = 1.5 m from support A. Use sagging moments positive and upward shear on the left face positive.
L = 5 mP = 55 kN at 1.5 mw = 2 kN/m from 0 to 5 mx = 1.5 m
Mx = kN·m
7.Beam deflectionMedium
A cantilever of length L is fixed at A and carries a point load P at a distance a = 0.5 m from A. Find the deflection δB at the free end B.
P = 5 kNa = 0.5 mL = 2.5 mE = 70 GPa (aluminium)I = 8.5 × 10⁶ mm⁴
δB = mm
8.Beam deflectionHard
A simply supported beam carries a uniformly distributed load w and a point load P at midspan. Using superposition, find the midspan deflection δmax.
P = 7 kNw = 8 kN/mL = 2 mE = 11 GPa (timber)I = 36 × 10⁶ mm⁴
δmax = mm
9.Column bucklingMedium
A column of length L made of aluminium is fixed at the base and free at the top. Using Euler’s formula, find its critical buckling load Pcr.
L = 3 mE = 70 GPa (aluminium)b × h = 40 × 100 mm
Pcr = kN
10.Column bucklingHard
A solid round column of length L made of steel is fixed at both ends. It must carry 75 kN with a factor of safety of 3 against buckling. Find the smallest diameter d.
P = 75 kNn = 3L = 3 mE = 200 GPa (steel)
d = mm
11.Centroid & second moment of areaMedium
A channel section lies with its open side up: a base plate 160 mm wide with two upright legs, 140 mm high overall. Base and legs are all 16 mm thick. Find its second moment of area Ix about the horizontal axis x through its centroid.
b = 160 mmh = 140 mmt = 16 mm
Ix = × 10⁶ mm⁴
12.Centroid & second moment of areaHard
A 200 mm × 240 mm plate has a rectangular cut-out 30 mm wide and 50 mm high, centred on the vertical centre line with its centre 156 mm above the bottom. Find the second moment of area Ix about the horizontal axis through the centroid.
b = 200 mmh = 240 mmcut-out: 30 × 50 mmhole centre: y = 156 mm
Ix = × 10⁶ mm⁴
13.Effective stress in soilMedium
For the soil profile shown, find the total vertical stress σ at point X.
A 6 m thick overconsolidated clay layer has Cc = 0.4, Cr = 0.04 and e₀ = 0.95. At its mid-depth the effective vertical stress is 60 kPa and the preconsolidation pressure is 150 kPa. A new building adds 220 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.
In a laboratory oedometer test, a clay specimen 19 mm thick, drained at the top and bottom, reaches 50% consolidation in 12 min. In the field the same clay forms a layer 8.5 m thick. It lies between two sand layers, so water drains out at the top and the bottom. How many days t does the field layer take to reach 50% consolidation?
A vertical rectangular gate 2 m wide sits in the wall of a tank of water, with its top edge 2 m below the surface. Find the resultant hydrostatic force F on the gate.
A vertical rectangular gate 3 m wide sits in the wall of a tank of seawater, with its top edge 1.5 m below the surface. Find the depth ycp of the centre of pressure below the surface.
Water flows at 10 L/s through a pipe 150 m long with an inside diameter of 150 mm. Use the Darcy friction factor f = 0.015 and g = 9.81 m/s². Find the friction head loss hf.
Two open reservoirs are joined by a pipe 200 m long with an inside diameter of 200 mm and a Darcy friction factor f = 0.02. The minor losses are a square-edged entrance (K = 0.5), 2 bends (K = 0.3 each), a valve (K = 2) and the exit into the lower reservoir (K = 1.0). Use g = 9.81 m/s². What difference in water level Δz between the reservoirs gives a flow rate of 80 L/s?
A concrete storm sewer with an inside diameter of 600 mm flows half full. Manning n = 0.013 and the slope is S = 0.005. Find the flow rate Q in m³/s.
D = 600 mmn = 0.013S = 0.005
Q = m³/s
22.Open-channel flow (Manning)Hard
A rectangular finished concrete channel 4.5 m wide must carry 4.7 m³/s in uniform flow at a depth of 0.8 m. Manning n = 0.012. Find the required bed slope S (in m/m).
Q = 4.7 m³/sb = 4.5 my = 0.8 mn = 0.012
S = m/m
23.Pumps & pump powerMedium
A pump with an efficiency of 85% delivers 20 L/s of water (ρ = 1000 kg/m³) against a head of 76 m. Use g = 9.81 m/s². Find the shaft power Pshaft needed, in kW.
Q = 20 L/sH = 76 mη = 85%g = 9.81 m/s²
Pshaft = kW
24.Pumps & pump powerHard
A pump moves 80 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 6 m higher. The pipe is 100 m long with an inside diameter of 200 mm and a Darcy friction factor f = 0.02; the minor-loss coefficients add up to ΣK = 2 (entrance and exit included). Use g = 9.81 m/s². Find the head H the pump must add.
You invest €3 000 at a nominal rate of 3% per year, compounded quarterly. Find the value FV of the investment after 4 years.
PV = €3 0003% / 4n = 4
FV = €
26.Time value of moneyHard
A loan of €25 000 is repaid with equal monthly payments over 3 years at 4.8% per year, compounded monthly. How much interest I is paid in total over the life of the loan?
P = €25 0004.8% / 12N = 36
I = €
27.NPV & IRRMedium
An investment of €60 000 gives these cash flows at the end of years 1 to 4: €14 000, €30 000, €20 000, €13 000. The cost of capital is 7.000000000000001%. Find the net present value NPV.
Project A costs €20 000 and returns €11 500, €8 000, €4 000 at the end of years 1 to 3. Project B costs €25 000 and returns €7 000, €9 500, €13 500. Find the crossover rate r* at which both projects have the same NPV, in percent.
Drag z so that the shaded area under the standard normal curve, to the right of z, is 0.0968. Find z to two decimals.
A = 0.0968
z =
30.Normal distributionHard
The heights of adult men are normally distributed with mean 178 cm and standard deviation 7 cm. Drag the cut-off so the shaded top 90% is to the right of it. Find the cut-off x.
μ = 178 cmσ = 7 cm90%
x = cm
3Solutions
1.Beam support reactions
Answer: RB = 15 kN
Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.
Free-body diagram
Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.
Equilibrium
Moments about A, counter-clockwise positive. Then vertical force balance.
ΣMA = 0: RB·4 = 10·1.5 + 15·3
RB = 60/4 = 15 kN
ΣFy = 0: RA = 25 − 15 = 10 kN
Answer
RB = 15 kN
2.Beam support reactions
Answer: RA = 19.2 kN
Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.
Free-body diagram
Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.
Equilibrium
Moments about A, counter-clockwise positive. Then vertical force balance.
UDL resultant: W = w·ℓ = 3·2 = 6 kN, acting at x̄ = 8 m
ΣMA = 0: RB·10 = 20·1 + 3·2·8
RB = 68/10 = 6.8 kN
ΣFy = 0: RA = 26 − 6.8 = 19.2 kN
Answer
RA = 19.2 kN
3.Truss: method of joints
Answer: member CG
Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.
Joint G
FG and GH lie on one straight line and the joint carries no load. Balancing forces across that line leaves only CG.
ΣF⊥ = 0 → FCG = 0
Check with the method of joints
Solving all joints gives these member forces (T = tension, C = compression).
Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.
Joint B
AB and BC lie on one straight line and the joint carries no load. Balancing forces across that line leaves only BF.
ΣF⊥ = 0 → FBF = 0
Check with the method of joints
Solving all joints gives these member forces (T = tension, C = compression).
Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut. An applied couple makes the bending moment diagram jump by the size of the couple.
Support reactions
Moments about A, counter-clockwise positive: RB·L − M0 = 0. Vertical balance: RA + RB = 0.
RB = M0/L = 45/10 = 4.5 kN (upward)
RA = −RB = −4.5 kN (downward)
Cut just right of the couple
The left part now contains RA and the couple.
Mx = RA·a + M0 = −4.5·2 + 45 = 36 kN·m
Answer
Mx = 36 kN·m
6.Shear force & bending moment
Answer: Mx = 63 kN·m
Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut.
Support reactions
Equilibrium of the whole beam.
UDL resultant: W = w·ℓ = 2·5 = 10 kN, acting at x̄ = 2.5 m
ΣMA = 0: RB·5 = 55·1.5 + 2·5·2.5
RB = 107.5/5 = 21.5 kN
ΣFy = 0: RA = 65 − 21.5 = 43.5 kN
Cut at x = 1.5 m and keep the left part
Only forces left of the cut appear. A UDL portion acts as one force at the middle of that portion.
M = RA·x − (each load left of the cut × its distance to the cut)
Mx = 43.5·1.5 − 2·1.5·0.75 = 63 kN·m
Answer
Mx = 63 kN·m
7.Beam deflection
Answer: δB = 2.451 mm
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).
Consistent units
Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.
P = 5000 N, a = 500 mm, L = 2500 mm
EI = 5.95 × 10¹¹ N·mm²
Deflection at the free end
Deflection at the load plus the slope at the load times the remaining length.
δP = Pa³/(3EI) = 0.3501 mm
θP = Pa²/(2EI) = 0.00105 rad
δB = δP + θP·(L − a) = Pa²(3L − a)/(6EI) = 2.451 mm
Answer
δB = 2.451 mm
8.Beam deflection
Answer: δmax = 7.155 mm
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).
Consistent units
Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.
P = 7000 N, w = 8 N/mm, L = 2000 mm, EI = 3.96 × 10¹¹ N·mm²
Each load on its own
δP = PL³/(48EI) = 7000·2000³/(48·3.96 × 10¹¹) = 2.946 mm
δw = 5wL⁴/(384EI) = 5·8·2000⁴/(384·3.96 × 10¹¹) = 4.209 mm
Add them
δmax = 2.946 + 4.209 = 7.155 mm
Answer
δmax = 7.155 mm
9.Column buckling
Answer: Pcr = 10.24 kN
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Smallest second moment of area
A rectangle buckles about its weak axis, using the smaller dimension cubed.
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Required critical load
Pcr = n·P = 3·75000 = 225000 N
KL = 0.5·3000 = 1500 mm
Solve for the diameter
d = (64·n·P·(KL)²/(π³E))^(1/4) = (64·225000·1500²/(π³·200000))^(1/4) = 47.81 mm
Answer
d = 47.81 mm
Check: the slenderness KL/r is 125.5, so the column is slender and Euler applies.
11.Centroid & second moment of area
Answer: Ix = 12.76 × 10⁶ mm⁴
Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.
Split into rectangles
Take the base at full width and the two legs above it (height h − t), so nothing is counted twice.
base: A1 = 160·16 = 2560 mm², y1 = 8 mm
two legs: A2 = 2·16·124 = 3968 mm², y2 = 16 + 124/2 = 78 mm
Sections with holes: treat a hole as a negative area. The centroid is ȳ = (A₁y₁ − A₂y₂)/(A₁ − A₂), with A₁, y₁ for the full plate and A₂, y₂ for the hole. For the second moment of area about the centroidal axis, use the parallel-axis theorem for each part and subtract the hole: I = (Ic1 + A₁d₁²) − (Ic2 + A₂d₂²), where d is the distance from each part's own centroid to the axis through ȳ. A rectangle has Ic = bh³/12 and a circle Ic = πd⁴/64.
Centroid
ȳ = (48000·120 − 1500·156)/(48000 − 1500) = 118.8 mm
Full plate about ȳ
200·240³/12 + 48000·1.161² = 230.5 × 10⁶ mm⁴
Hole about ȳ
30·50³/12 + 1500·37.16² = 2.384 × 10⁶ mm⁴
Subtract
Ix = 228.1 × 10⁶ mm⁴
Answer
Ix = 228.1 × 10⁶ mm⁴
13.Effective stress in soil
Answer: σ = 74 kPa
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Total stress
Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Total stress
Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.
σ = γd·3 + γsat,sand·3 + γsat,clay·2.5
σ = 16·3 + 19·3 + 17·2.5 = 147.5 kPa
Answer
σ = 147.5 kPa
15.Consolidation settlement
Answer: S = 382.6 mm
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Compare with the preconsolidation pressure
σ′f = 60 + 220 = 280 kPa > 150 kPa
Settlement
Recompression up to σ′p, virgin compression beyond it.
S = 0.04·6/(1 + 0.95)·log₁₀(150/60) + 0.4·6/(1 + 0.95)·log₁₀(280/150)
S = 48.98 + 333.6 = 382.6 mm
Answer
S = 382.6 mm
16.Consolidation settlement
Answer: t = 1668 days
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Drainage paths
Hdr,lab = 19/2 = 9.5 mm = 0.0095 m
Hdr,field = 8.5/2 = 4.25 m
Scale the time
t = Tv·Hdr²/cv with the same T_v and cv in the lab and the field.
tfield = 12·(4.25/0.0095)² = 2.402 × 10⁶ min
tfield = 2.402 × 10⁶/1440 = 1668 days
Answer
t = 1668 days
17.Hydrostatic force
Answer: F = 159.4 kN
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 2 + 2.5/2 = 3.25 m
A = H·b = 2.5·2 = 5 m²
Resultant force
F = ρ·g·yc·A = 1000·9.81·3.25·5 = 159.4 kN
Answer
F = 159.4 kN
18.Hydrostatic force
Answer: ycp = 3.25 m
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 1.5 + 3/2 = 3 m
A = H·b = 3·3 = 9 m²
Resultant force
F = ρ·g·yc·A = 1025·9.81·3·9 = 271.5 kN
Centre of pressure
Pressure grows with depth, so the resultant acts below the centroid.
Ic = b·H³/12 = 3·3³/12 = 6.75 m⁴
ycp = yc + Ic/(yc·A) = 3 + 6.75/(3·9) = 3.25 m
Answer
ycp = 3.25 m
19.Pipe friction & head loss
Answer: hf = 0.2448 m
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Mean velocity
A = π·0.15²/4 = 0.01767 m²
V = Q/A = 0.01/0.01767 = 0.5659 m/s
Velocity head
V²/(2g) = 0.5659²/(2·9.81) = 0.01632 m
Darcy–Weisbach
hf = f·(L/D)·V²/(2g) = 0.015·(150/0.15)·0.5659²/(2·9.81) = 0.2448 m
Answer
hf = 0.2448 m
20.Pipe friction & head loss
Answer: Δz = 7.965 m
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Velocity
V = Q/A = 0.08/0.03142 = 2.546 m/s
V²/(2g) = 0.3305 m
Loss coefficients
f·L/D = 0.02·200/0.2 = 20
ΣK = 0.5 + 2·0.3 + 2 + 1.0 = 4.1
Total head loss
hf = 20·0.3305 = 6.61 m
hm = 4.1·0.3305 = 1.355 m
Δz = hf + hm = 7.965 m
Answer
Δz = 7.965 m
21.Open-channel flow (Manning)
Answer: Q = 0.2171 m³/s
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Geometry
A = 0.1414 m², R = D/4 = 0.15 m
Velocity
V = (1/0.013)·0.152/3·0.0051/2 = 1.536 m/s
Flow rate
Q = A·V = 0.1414·1.536 = 0.2171 m³/s
Answer
Q = 0.2171 m³/s
22.Open-channel flow (Manning)
Answer: S = 0.0004958 m/m
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Hydraulic power
Ph = ρ·g·Q·H = 1000·9.81·0.02·76 = 14.91 kW
Shaft power
Pshaft = Ph/η = 14.91/0.85 = 17.54 kW
Answer
Pshaft = 17.54 kW
24.Pumps & pump power
Answer: H = 9.966 m
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Both surfaces are open and practically at rest, so pressure and velocity terms drop out.
H = Δz + hL = 6 + 3.966 = 9.966 m
Answer
H = 9.966 m
25.Time value of money
Answer: FV = 3381 €
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
Monthly payment
i = 0.004, N = 36
A = 25 000·0.004/(1 − (1 + 0.004)−36) = €747.03
Total interest
I = N·A − P = 36·747 − 25 000 = €1 893.07
Answer
I = €1 893.07
27.NPV & IRR
Answer: NPV = 5531 €
Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.
Present value of each cash flow
CF0 = −60 000
CF1/(1 + 0.07)1 = 14 000/1.07 = 13 084.11
CF2/(1 + 0.07)2 = 30 000/1.145 = 26 203.16
CF3/(1 + 0.07)3 = 20 000/1.225 = 16 325.96
CF4/(1 + 0.07)4 = 13 000/1.311 = 9 917.64
Add them up
NPV = €5 530.87
Answer
NPV = €5 530.87
NPV is positive, so the project earns more than the required return.
28.NPV & IRR
Answer: r* = 6.315 %
Crossover rate: the discount rate at which two projects have the same NPV. It is the IRR of the difference in their cash flows (B − A). Below it the project with the later, larger cash flows has the higher NPV; above it the other one wins.
Difference in cash flows
ΔCF0 = −25 000 − (−20 000) = −5 000
ΔCF1 = 7 000 − 11 500 = −4 500
ΔCF2 = 9 500 − 8 000 = 1 500
ΔCF3 = 13 500 − 4 000 = 9 500
IRR of the difference
NPVΔ(6%) = 66.09
NPVΔ(7%) = −140.62
r* = 6.315%
Answer
r* = 6.315%
Check: at 6.315% both NPVs are €1 223.33.
29.Normal distribution
Answer: z = 1.3
From an area back to z: Φ(z) is the area to the left of z. For a left-tail area A, find z with Φ(z) = A in the table. A right-tail area A means Φ(z) = 1 − A. A central area A between −z and z leaves (1 − A)/2 in each tail, so Φ(z) = (1 + A)/2. For a value x, use x = μ + zσ.
Area to the left of z
Φ(z) = 1 − 0.0968 = 0.9032
Read the z-table backwards
Find 0.9032 inside the table and read off z.
z = 1.30
Answer
z = 1.30
30.Normal distribution
Answer: x = 169 cm
From an area back to z: Φ(z) is the area to the left of z. For a left-tail area A, find z with Φ(z) = A in the table. A right-tail area A means Φ(z) = 1 − A. A central area A between −z and z leaves (1 − A)/2 in each tail, so Φ(z) = (1 + A)/2. For a value x, use x = μ + zσ.
Area to the left
Φ(z) = 0.1
z from the table
z ≈ −1.28
Back to the original units
x = 178 − 1.28·7 = 169 cm
Answer
x = 169 cm