laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)
Open-channel flow (Manning)
Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²
Pumps & pump power
Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)
Time value of money
Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i
Method
Draw a timeline with every cash flow and its timing.
Match the rate to the period: a monthly rate for monthly payments.
Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
Check the sign and the order of magnitude of the answer.
NPV & IRR
Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)
Method
List all cash flows with their year; the investment at year 0 is negative.
Discount each cash flow: CFt/(1 + r)t.
Add them up to get the NPV. Positive means the project earns more than r.
For the IRR, find the rate that makes NPV zero by trial or interpolation.
Normal distribution
z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ
Method
Convert the value to a z-score: z = (x − μ)/σ.
Look up Φ(z), the area to the left of z.
For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
For a percentile, work backwards: find z for the area, then x = μ + z·σ.
2Practice problems
1.Beam support reactionsMedium
The cantilever beam is fixed to the wall at A. It carries a uniformly distributed load w along its whole length and a point load P at 8 m from the wall. Find the magnitude of the reaction moment MA at the wall.
L = 8 mP = 25 kN at 8 mw = 3 kN/m from 0 to 8 m
MA = kN·m
2.Beam support reactionsHard
The cantilever beam is fixed to the wall at A. It carries a linearly varying load that is 8 kN/m at the wall and falls to zero at the free end B, plus a point load P at 5 m from the wall. Find the magnitude of the reaction moment MA at the wall.
L = 6 mw0 = 8 kN/mP = 70 kN at 5 m
MA = kN·m
3.Truss: method of jointsMedium
Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.
C: 35 kN ↓D: 15 kN ↓G: 20 kN ↓H: 20 kN ↓
1member AB
2member BC
3member CD
4member DE
5member FG
6member GH
7member AF
8member HE
9member BF
10member CG
11member DH
12member FC
13member HC
4.Truss: method of jointsHard
Use the method of joints to find the force FBC in member BC. Give tension as positive and compression as negative.
span = 4 mheight = 4 mB is 1 m from Avertical load = 50 kNhorizontal load = 30 kN →
FBC = kN
5.Shear force & bending momentMedium
The marks A to G split the beam into six equal parts. At which mark is the bending moment largest in size, sagging or hogging? Click it in the diagram.
40 kN @ 4 m6 kN/m, 4–8 m
1A (x = 0 m)
2B (x = 2 m)
3C (x = 4 m)
4D (x = 6 m)
5E (x = 8 m)
6F (x = 10 m)
7G (x = 12 m)
6.Shear force & bending momentHard
Find the bending moment Mx at the section x = 2 m from support A. Use sagging moments positive and upward shear on the left face positive.
L = 6 mP = 15 kN at 2 mw = 4 kN/m from 0 to 6 mx = 2 m
Mx = kN·m
7.Beam deflectionMedium
A cantilever of length L is fixed at A and carries a point load P at a distance a = 1.5 m from A. Find the deflection δB at the free end B.
P = 23 kNa = 1.5 mL = 2 mE = 11 GPa (timber)I = 84 × 10⁶ mm⁴
δB = mm
8.Beam deflectionHard
A simply supported beam carries a point load P at b = 2 m from support B. Find the deflection δmid at midspan.
P = 21 kNb = 2 mL = 5 mE = 70 GPa (aluminium)I = 84 × 10⁶ mm⁴
δmid = mm
9.Column bucklingMedium
A column of length L made of aluminium is pinned at both ends. Using Euler’s formula, find its critical buckling load Pcr.
L = 2.5 mE = 70 GPa (aluminium)b × h = 50 × 100 mm
Pcr = kN
10.Column bucklingHard
A column of length L made of steel is fixed at both ends. Find its slenderness and the critical buckling stress σcr from Euler’s formula.
L = 3 mE = 200 GPa (steel)d = 30 mm
σcr = MPa
11.Centroid & second moment of areaMedium
A channel section lies with its open side up: a base plate 100 mm wide with two upright legs, 180 mm high overall. Base and legs are all 10 mm thick. Find the height ȳ of the centroid above the bottom edge.
b = 100 mmh = 180 mmt = 10 mm
ȳ = mm
12.Centroid & second moment of areaHard
A 150 mm × 300 mm plate has a rectangular cut-out 40 mm wide and 30 mm high, centred on the vertical centre line with its centre 180 mm above the bottom. Find the second moment of area Ix about the horizontal axis through the centroid.
b = 150 mmh = 300 mmcut-out: 40 × 30 mmhole centre: y = 180 mm
Ix = × 10⁶ mm⁴
13.Effective stress in soilMedium
For the soil profile shown, find the vertical effective stress σ′ at point X.
A 3.5 m thick overconsolidated clay layer has Cc = 0.2, Cr = 0.02 and e₀ = 0.9. At its mid-depth the effective vertical stress is 115 kPa and the preconsolidation pressure is 235 kPa. A new building adds 80 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.
In a laboratory oedometer test, a clay specimen 25 mm thick, drained at the top and bottom, reaches 50% consolidation in 10 min. In the field the same clay forms a layer 4.5 m thick. It lies between two sand layers, so water drains out at the top and the bottom. How many days t does the field layer take to reach 50% consolidation?
A vertical rectangular gate 3 m wide sits in the wall of a tank of water, with its top edge 2 m below the surface. Find the resultant hydrostatic force F on the gate.
A vertical rectangular gate 2 m wide sits in the wall of a tank of oil, with its top edge 1 m below the surface. Find the resultant hydrostatic force F on the gate.
d = 1 mH = 1.5 mb = 2 mρ = 880 kg/m³g = 9.81 m/s²
F = kN
19.Pipe friction & head lossMedium
Water flows at a mean velocity of 1.6 m/s through a pipe 50 m long with an inside diameter of 75 mm. Use the Darcy friction factor f = 0.028 and g = 9.81 m/s². Find the friction head loss hf.
A pipe 200 m long with an inside diameter of 300 mm (Darcy friction factor f = 0.02) runs from an open reservoir and discharges as a free jet into the air. The minor losses are a square-edged entrance (K = 0.5), 4 bends (K = 0.3 each) and a valve (K = 0.2). Use g = 9.81 m/s². How far H must the reservoir surface be above the pipe outlet for a flow rate of 75 L/s?
A concrete storm sewer with an inside diameter of 300 mm flows half full. Manning n = 0.013 and the slope is S = 0.005. Find the flow rate Q in m³/s.
D = 300 mmn = 0.013S = 0.005
Q = m³/s
22.Open-channel flow (Manning)Hard
A trapezoidal brickwork channel with a bottom width of 3 m and side slopes of 2:1 (horizontal:vertical) must carry 14 m³/s in uniform flow at a depth of 1 m. Manning n = 0.015. Find the required bed slope S (in m/m).
Q = 14 m³/sb = 3 my = 1 mz = 2n = 0.015
S = m/m
23.Pumps & pump powerMedium
In a test, a pump delivers 100 L/s of water (ρ = 1000 kg/m³) against a head of 72 m while its shaft takes 88.3 kW. Use g = 9.81 m/s². Find the pump efficiency η in percent.
Q = 100 L/sH = 72 mPshaft = 88.3 kWg = 9.81 m/s²
η = %
24.Pumps & pump powerHard
A pump moves 50 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 17 m higher. The pipe is 100 m long with an inside diameter of 150 mm and a Darcy friction factor f = 0.022; the minor-loss coefficients add up to ΣK = 3 (entrance and exit included). Use g = 9.81 m/s². The upper tank is closed and the air above its water is at a gauge pressure of 200 kPa. Find the head H the pump must add.
You need €15 000 in 7 years. An account pays 4.8% per year, compounded quarterly. How much must you deposit today? Find the present value PV.
FV = €15 0004.8% / 4n = 7
PV = €
26.Time value of moneyHard
A loan of €15 000 is repaid with equal monthly payments over 4 years. The interest rate is 2.4% per year, compounded monthly. Find the monthly payment A.
P = €15 0002.4% / 12N = 48
A = €
27.NPV & IRRMedium
An investment of €45 000 gives these cash flows at the end of years 1 to 3: €19 000, €15 000, €20 000. The cost of capital is 6%. Find the net present value NPV.
Project A costs €20 000 and returns €10 500, €8 000, €4 500 at the end of years 1 to 3. Project B costs €25 000 and returns €6 500, €10 000, €13 000. Find the crossover rate r* at which both projects have the same NPV, in percent.
The delivery times are normally distributed with mean 32 min and standard deviation 6 min. What fraction lies between 29.3 and 42.8 min? Give P as a decimal.
μ = 32σ = 6x1 = 29.3x2 = 42.8
P =
30.Normal distributionHard
The IQ scores are normally distributed with mean 100 points and standard deviation 15 points. Find the value x below which 90% of them lie (the 90th percentile).
μ = 100σ = 15P = 90%
x = points
3Solutions
1.Beam support reactions
Answer: MA = 296 kN·m
Cantilever equilibrium: a fixed support can push up and also resist rotation, so it gives a vertical reaction RA and a reaction moment MA. ΣFy = 0 gives RA, and moments about the wall give MA = Σ(load × distance from the wall). A distributed load acts as its resultant at the centroid of the load diagram.
Resultant of the distributed load
W = 3·8 = 24 kN, x̄ = 4 m
Moment about the wall
MA = P·a + W·x̄ = 25·8 + 24·4 = 296 kN·m
Answer
MA = 296 kN·m
2.Beam support reactions
Answer: MA = 398 kN·m
Cantilever equilibrium: a fixed support can push up and also resist rotation, so it gives a vertical reaction RA and a reaction moment MA. ΣFy = 0 gives RA, and moments about the wall give MA = Σ(load × distance from the wall). A distributed load acts as its resultant at the centroid of the load diagram.
Resultant of the triangular load
W = ½·8·6 = 24 kN
x̄ = L/3 = 2 m
Moment about the wall
MA = W·x̄ + P·a = 24·2 + 70·5 = 398 kN·m
Answer
MA = 398 kN·m
3.Truss: method of joints
Answer: member BF
Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.
Joint B
AB and BC lie on one straight line and the joint carries no load. Balancing forces across that line leaves only BF.
ΣF⊥ = 0 → FBF = 0
Check with the method of joints
Solving all joints gives these member forces (T = tension, C = compression).
Method of joints: every pin of a truss is in equilibrium, so ΣFx = 0 and ΣFy = 0 at each joint. Start at a joint with at most two unknown member forces. A negative result means the member is in compression.
Support reactions
Equilibrium of the whole truss. Moments about A, counter-clockwise positive.
ΣMA = 0: Cy·4 = 50·1 + 30·4 → Cy = 42.5 kN
ΣFy = 0: Ay = 50 − 42.5 = 7.5 kN
ΣFx = 0: Ax = −30 kN
Joint C
The roller gives only a vertical reaction, so joint C has just two unknown member forces. Assume both in tension.
Largest bending moment: M changes slope wherever the shear force changes, so its peaks sit where the shear force crosses zero: under a point load, inside a distributed load, or over a support of an overhang. At a fixed support of a cantilever the moment is largest at the wall. Compare the size of M at those places, sagging or hogging.
Support reactions
Take moments about one support, then use the vertical force balance.
R1 = 38.67 kN, R2 = 25.33 kN
Bending moment at every mark
Sum the moments of all forces on one side of the cut. Sagging is positive, hogging negative.
MA = 0, MB = 77.33, MC = 154.7 kN·m, MD = 140, ME = 101.3, MF = 50.67, MG = 0
Answer
Mark C: MC = 154.7 kN·m
6.Shear force & bending moment
Answer: Mx = 36 kN·m
Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut.
Support reactions
Equilibrium of the whole beam.
UDL resultant: W = w·ℓ = 4·6 = 24 kN, acting at x̄ = 3 m
ΣMA = 0: RB·6 = 15·2 + 4·6·3
RB = 102/6 = 17 kN
ΣFy = 0: RA = 39 − 17 = 22 kN
Cut at x = 2 m and keep the left part
Only forces left of the cut appear. A UDL portion acts as one force at the middle of that portion.
M = RA·x − (each load left of the cut × its distance to the cut)
Mx = 22·2 − 4·2·1 = 36 kN·m
Answer
Mx = 36 kN·m
7.Beam deflection
Answer: δB = 42 mm
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).
Consistent units
Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.
P = 23000 N, a = 1500 mm, L = 2000 mm
EI = 9.24 × 10¹¹ N·mm²
Deflection at the free end
Deflection at the load plus the slope at the load times the remaining length.
δP = Pa³/(3EI) = 28 mm
θP = Pa²/(2EI) = 0.028 rad
δB = δP + θP·(L − a) = Pa²(3L − a)/(6EI) = 42 mm
Answer
δB = 42 mm
8.Beam deflection
Answer: δmid = 8.78 mm
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).
Consistent units
Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Smallest second moment of area
A rectangle buckles about its weak axis, using the smaller dimension cubed.
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Smallest second moment of area
A round section has the same I about every axis.
I = πd⁴/64 = π·30⁴/64 = 39761 mm⁴
Radius of gyration and slenderness
A = 706.9 mm²
r = √(I/A) = √(39761/706.9) = 7.5 mm
KL = 0.5·3000 = 1500 mm
KL/r = 1500/7.5 = 200
Critical stress
σcr = π²E/(KL/r)² = π²·200000/200² = 49.35 MPa
Answer
σcr = 49.35 MPa
11.Centroid & second moment of area
Answer: ȳ = 74.55 mm
Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.
Split into rectangles
Take the base at full width and the two legs above it (height h − t), so nothing is counted twice.
base: A1 = 100·10 = 1000 mm², y1 = 5 mm
two legs: A2 = 2·10·170 = 3400 mm², y2 = 10 + 170/2 = 95 mm
Centroid
ȳ = (1000·5 + 3400·95)/4400 = 74.55 mm
Answer
ȳ = 74.55 mm
12.Centroid & second moment of area
Answer: Ix = 336.3 × 10⁶ mm⁴
Sections with holes: treat a hole as a negative area. The centroid is ȳ = (A₁y₁ − A₂y₂)/(A₁ − A₂), with A₁, y₁ for the full plate and A₂, y₂ for the hole. For the second moment of area about the centroidal axis, use the parallel-axis theorem for each part and subtract the hole: I = (Ic1 + A₁d₁²) − (Ic2 + A₂d₂²), where d is the distance from each part's own centroid to the axis through ȳ. A rectangle has Ic = bh³/12 and a circle Ic = πd⁴/64.
Centroid
ȳ = (45000·150 − 1200·180)/(45000 − 1200) = 149.2 mm
Full plate about ȳ
150·300³/12 + 45000·0.8219² = 337.5 × 10⁶ mm⁴
Hole about ȳ
40·30³/12 + 1200·30.82² = 1.23 × 10⁶ mm⁴
Subtract
Ix = 336.3 × 10⁶ mm⁴
Answer
Ix = 336.3 × 10⁶ mm⁴
13.Effective stress in soil
Answer: σ′ = 59.45 kPa
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Total stress
Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.
Water pressure grows with depth below the water table.
u = γw·(z − zw) = 9.81·5 = 49.05 kPa
Effective stress
σ′ = σ − u = 108.5 − 49.05 = 59.45 kPa
Answer
σ′ = 59.45 kPa
14.Effective stress in soil
Answer: u = 39.24 kPa
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Pore water pressure
Water pressure grows with depth below the water table.
u = γw·(z − zw) = 9.81·4 = 39.24 kPa
Answer
u = 39.24 kPa
15.Consolidation settlement
Answer: S = 8.449 mm
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Compare with the preconsolidation pressure
σ′f = 115 + 80 = 195 kPa ≤ 235 kPa
Settlement
The clay stays on its recompression line.
S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0) = 0.02·3.5/(1 + 0.9)·log₁₀(195/115) = 8.449 mm
Answer
S = 8.449 mm
16.Consolidation settlement
Answer: t = 225 days
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Drainage paths
Hdr,lab = 25/2 = 12.5 mm = 0.0125 m
Hdr,field = 4.5/2 = 2.25 m
Scale the time
t = Tv·Hdr²/cv with the same T_v and cv in the lab and the field.
tfield = 10·(2.25/0.0125)² = 324000 min
tfield = 324000/1440 = 225 days
Answer
t = 225 days
17.Hydrostatic force
Answer: F = 239.1 kN
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 2 + 2.5/2 = 3.25 m
A = H·b = 2.5·3 = 7.5 m²
Resultant force
F = ρ·g·yc·A = 1000·9.81·3.25·7.5 = 239.1 kN
Answer
F = 239.1 kN
18.Hydrostatic force
Answer: F = 45.32 kN
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 1 + 1.5/2 = 1.75 m
A = H·b = 1.5·2 = 3 m²
Resultant force
F = ρ·g·yc·A = 880·9.81·1.75·3 = 45.32 kN
Answer
F = 45.32 kN
19.Pipe friction & head loss
Answer: hf = 2.436 m
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Velocity head
V²/(2g) = 1.6²/(2·9.81) = 0.1305 m
Darcy–Weisbach
hf = f·(L/D)·V²/(2g) = 0.028·(50/0.075)·1.6²/(2·9.81) = 2.436 m
Answer
hf = 2.436 m
20.Pipe friction & head loss
Answer: H = 0.9315 m
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Velocity
V = Q/A = 0.075/0.07069 = 1.061 m/s
V²/(2g) = 0.05738 m
Loss coefficients
f·L/D = 0.02·200/0.3 = 13.33
ΣK = 0.5 + 4·0.3 + 0.2 = 1.9
Energy equation
The outlet jet still carries its velocity head; it is not a loss but it has to be supplied.
H = (1 + 13.33 + 1.9)·0.05738 = 0.9315 m
Answer
H = 0.9315 m
21.Open-channel flow (Manning)
Answer: Q = 0.03419 m³/s
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Geometry
A = 0.03534 m², R = D/4 = 0.075 m
Velocity
V = (1/0.013)·0.0752/3·0.0051/2 = 0.9673 m/s
Flow rate
Q = A·V = 0.03534·0.9673 = 0.03419 m³/s
Answer
Q = 0.03419 m³/s
22.Open-channel flow (Manning)
Answer: S = 0.003014 m/m
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Geometry
A = (b + z·y)·y = (3 + 2·1)·1 = 5 m²
P = b + 2y·√(1 + z²) = 3 + 2·1·√(1 + 2²) = 7.472 m
R = A/P = 0.6692 m
Solve Manning for S
S1/2 = n·Q/(A·R2/3) = 0.015·14/(5·0.765) = 0.0549
S = 0.0549² = 0.003014
Answer
S = 0.003014
That is a fall of 3.014 m per kilometre.
23.Pumps & pump power
Answer: η = 79.99 %
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Hydraulic power
Ph = ρ·g·Q·H = 1000·9.81·0.1·72 = 70.63 kW
Efficiency
η = Ph/Pshaft = 70.63/88.3 = 79.99%
Answer
η = 79.99%
24.Pumps & pump power
Answer: H = 44.6 m
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Both surfaces are practically at rest, so there is no velocity head term.
H = Δz + p/(ρ·g) + hL = 17 + 20.39 + 7.209 = 44.6 m
Answer
H = 44.6 m
25.Time value of money
Answer: PV = 10741 €
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
Rate and number of periods
i = 0.048/4 = 0.012
N = 4·7 = 28
Present value
PV = FV/(1 + i)N = 15 000/1.397 = €10 740.81
Answer
PV = €10 740.81
26.Time value of money
Answer: A = 328.1 €
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
Monthly rate and number of payments
i = 0.024/12 = 0.002
N = 12·4 = 48
Payment
The present value of N equal payments A is A·(1 − (1 + i)⁻ᴺ)/i. Set it equal to the loan and solve for A.
(1 + i)−N = 0.9086
A = 15 000·0.002/(1 − 0.9086) = €328.05
Answer
A = €328.05
27.NPV & IRR
Answer: NPV = 3067 €
Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.
Present value of each cash flow
CF0 = −45 000
CF1/(1 + 0.06)1 = 19 000/1.06 = 17 924.53
CF2/(1 + 0.06)2 = 15 000/1.124 = 13 349.95
CF3/(1 + 0.06)3 = 20 000/1.191 = 16 792.39
Add them up
NPV = €3 066.86
Answer
NPV = €3 066.86
NPV is positive, so the project earns more than the required return.
28.NPV & IRR
Answer: r* = 6.726 %
Crossover rate: the discount rate at which two projects have the same NPV. It is the IRR of the difference in their cash flows (B − A). Below it the project with the later, larger cash flows has the higher NPV; above it the other one wins.
Difference in cash flows
ΔCF0 = −25 000 − (−20 000) = −5 000
ΔCF1 = 6 500 − 10 500 = −4 000
ΔCF2 = 10 000 − 8 000 = 2 000
ΔCF3 = 13 000 − 4 500 = 8 500
IRR of the difference
NPVΔ(6%) = 143.17
NPVΔ(7%) = −52.91
r* = 6.726%
Answer
r* = 6.726%
Check: at 6.726% both NPVs are €563.33.
29.Normal distribution
Answer: P = 0.6377
Normal distribution: convert a value x to a z-score, z = (x − μ)/σ, which counts standard deviations from the mean. A z-table (or Φ(z)) gives the area to the left of z, which is P(X < x). The area to the right is 1 − Φ(z), and the area between two values is the difference of their two areas.
z-scores
z₁ = (29.3 − 32)/6 = −0.45
z₂ = (42.8 − 32)/6 = 1.8
Area between
P = Φ(1.8) − Φ(−0.45) = 0.9641 − 0.3264 = 0.6377
Answer
P = 0.6377
30.Normal distribution
Answer: x = 119.2 points
Normal distribution: convert a value x to a z-score, z = (x − μ)/σ, which counts standard deviations from the mean. A z-table (or Φ(z)) gives the area to the left of z, which is P(X < x). The area to the right is 1 − Φ(z), and the area between two values is the difference of their two areas.
z for the percentile
Φ(z) = 0.9 → z = 1.282
Back to x
x = 100 + 1.282·15 = 119.22 points
Answer
x = 119.22 points
This is independent practice material. ExamProblems is not affiliated with or endorsed by the organisation that runs this exam, and the exam name is used only to describe the content. The FE exam is run by NCEES, which is not affiliated with ExamProblems and does not endorse it.