FE Civil exam practice: cram pack

Formula sheets, the key method steps for every topic and 30 practice problems, with full solutions at the back.

New problemsBack to the course

In the print window, choose “Save as PDF” to keep a copy on your device.

1Formulas and methods

Beam support reactions

Equilibrium
ΣFx = 0, ΣFy = 0, ΣM = 0
Uniform load
resultant w·L at the middle of the load
Moment
M = F·d

Method

  1. Draw a free-body diagram and replace each support by its reactions.
  2. Replace every distributed load by a single force at its centroid.
  3. Take moments about one support to find the reaction at the other.
  4. Use ΣFy = 0 to find the remaining reaction, and check with a second moment equation.

Truss: method of joints

Method of joints
ΣFx = 0, ΣFy = 0 at each joint
Method of sections
ΣM = 0 about a cut point
Member force
positive = tension, negative = compression

Method

  1. Find the support reactions for the whole truss.
  2. Method of joints: start at a joint with at most two unknown member forces and use ΣFx = 0 and ΣFy = 0.
  3. Method of sections: cut through the member you need and take moments about a point where the other unknown members meet.
  4. Assume tension; a negative answer means compression.

Shear force & bending moment

Shear and moment
V = ΣF on one side, M = ΣF·d on one side
Bending stress
σ = M·y/I
Rectangle
I = bh³/12
Section modulus
W = I/ymax
Simply supported, uniform load
Mmax = wL²/8

Method

  1. Find the support reactions from equilibrium of the whole beam.
  2. Cut the beam at the section you need and keep one side.
  3. Shear force: sum of the vertical forces on that side. Bending moment: sum of their moments about the cut.
  4. For the maximum moment, find where the shear force is zero.

Beam deflection

Point load at midspan
δ = PL³/(48EI)
Uniform load, simply supported
δ = 5wL⁴/(384EI)
Cantilever, end load
δ = PL³/(3EI)
Cantilever, uniform load
δ = wL⁴/(8EI)
Superposition
δ = δ1 + δ2

Column buckling

Euler load
Pcr = π²EI/(KL)²
Effective length factor
K = 1 pinned–pinned, 0.5 fixed–fixed, 0.7 fixed–pinned, 2 fixed–free
Critical stress
σcr = Pcr/A
Slenderness
λ = KL/r, r = √(I/A)

Centroid & second moment of area

Centroid
ȳ = ΣAiyi/ΣAi
Rectangle
I = bh³/12
Parallel-axis theorem
I = Ic + A·d²
Composite section
I = Σ(Ic,i + Aidi²)

Effective stress in soil

Total stress
σ = Σγi·hi
Pore water pressure
u = γw·(z − zw)
Effective stress
σ′ = σ − u
Water
γw = 9.81 kN/m³

Consolidation settlement

Normally consolidated
S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0)
Final stress
σ′f = σ′0 + Δσ (at mid-depth of the layer)
Overconsolidated, σ′f ≤ σ′p
S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0)
Overconsolidated, σ′f > σ′p
S = H/(1 + e0)·[Cr·log₁₀(σ′p/σ′0) + Cc·log₁₀(σ′f/σ′p)]
Overconsolidation ratio
OCR = σ′p/σ′0
Time for consolidation
t = Tv·Hdr²/cv
Drainage path
Hdr = H/2 (double drainage), H (single drainage)
Time factors
U 50% → 0.197, 60% → 0.287, 70% → 0.403, 80% → 0.567, 90% → 0.848

Hydrostatic force

Pressure at depth
p = ρgh
Force on a vertical wall
F = ρg·hc·A
Centre of pressure
yp = yc + Ic/(ycA)
Rectangle
Ic = bH³/12

Pipe friction & head loss

Reynolds number
Re = V·D/ν = ρ·V·D/μ
Flow regime
laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)

Open-channel flow (Manning)

Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²

Pumps & pump power

Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)

Time value of money

Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i

Method

  1. Draw a timeline with every cash flow and its timing.
  2. Match the rate to the period: a monthly rate for monthly payments.
  3. Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
  4. Check the sign and the order of magnitude of the answer.

NPV & IRR

Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)

Method

  1. List all cash flows with their year; the investment at year 0 is negative.
  2. Discount each cash flow: CFt/(1 + r)t.
  3. Add them up to get the NPV. Positive means the project earns more than r.
  4. For the IRR, find the rate that makes NPV zero by trial or interpolation.

Normal distribution

z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ

Method

  1. Convert the value to a z-score: z = (x − μ)/σ.
  2. Look up Φ(z), the area to the left of z.
  3. For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
  4. For a percentile, work backwards: find z for the area, then x = μ + z·σ.

2Practice problems

1.Beam support reactionsMedium
P = 65 kNM = 15 kN·mABRB​ = ?1 m3 m6 m

The simply supported beam has a pin at A and a roller at B. It carries a point load P at 1 m from A and a counter-clockwise couple M at 4 m from A. Find the vertical reaction RB, taking upward as positive.

L = 10 mP = 65 kN at 1 mM = 15 kN·m (counter-clockwise) at 4 m
RB = kN
2.Beam support reactionsHard
w = 4 kN/mP = 25 kNABRA​ = ?RB​1 m1 m4 m

The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RA.

L = 6 mP = 25 kN at 2 mw = 4 kN/m from 1 to 2 m
RA = kN
3.Truss: method of jointsMedium
ABCDEFGH40 kN35 kN40 kN4 × 3 m4 m

Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.

D: 40 kN ↓G: 35 kN ↓H: 40 kN ↓
  1. 1member AB
  2. 2member BC
  3. 3member CD
  4. 4member DE
  5. 5member FG
  6. 6member GH
  7. 7member AF
  8. 8member HE
  9. 9member BF
  10. 10member CG
  11. 11member DH
  12. 12member FC
  13. 13member HC
4.Truss: method of jointsHard
ABCDEFGH15 kN15 kN40 kN4 × 4 m4 m

Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.

D: 15 kN ↓F: 15 kN →G: 40 kN ↓
  1. 1member AB
  2. 2member BC
  3. 3member CD
  4. 4member DE
  5. 5member FG
  6. 6member GH
  7. 7member AF
  8. 8member HE
  9. 9member BF
  10. 10member CG
  11. 11member DH
  12. 12member FC
  13. 13member HC
5.Shear force & bending momentMedium
P1​ = 60 kNP2​ = 70 kNAB2 m1 m5 m

The simply supported beam carries two point loads. Find the maximum bending moment Mmax in the beam.

L = 8 mP1 = 60 kN at 2 mP2 = 70 kN at 3 m
Mmax = kN·m
6.Shear force & bending momentHard
w = 10 kN/mP = 55 kNABsection4.5 m1.5 m2 m

Find the bending moment Mx at the section x = 4.5 m from support A. Use sagging moments positive and upward shear on the left face positive.

L = 8 mP = 55 kN at 6 mw = 10 kN/m from 0 to 8 mx = 4.5 m
Mx = kN·m
7.Beam deflectionMedium
w = 6 kN/mδL = 1.5 m

A cantilever carries a uniformly distributed load w over its whole length. Find the deflection δ at the free end.

w = 6 kN/mL = 1.5 mE = 70 GPa (aluminium)I = 36 × 10⁶ mm⁴
δ = mm
8.Beam deflectionHard
w = 4 kN/mABδ3.5 m

A simply supported timber beam of rectangular section, 125 mm wide, carries a uniformly distributed load w over its whole span. Its midspan deflection may not exceed span/250. Find the smallest depth hreq of the section.

w = 4 kN/mL = 3.5 mE = 11 GPa (timber)b = 125 mm
hreq = mm
9.Column bucklingMedium
PL = 5 md = 40 mmcross-section

A column of length L made of steel is fixed at the base and pinned at the top. Using Euler’s formula, find its critical buckling load Pcr.

L = 5 mE = 200 GPa (steel)d = 40 mm
Pcr = kN
10.Column bucklingHard
PL = 4 md = 25 mmcross-section

A column of length L made of steel is pinned at both ends. Find its slenderness and the critical buckling stress σcr from Euler’s formula.

L = 4 mE = 200 GPa (steel)d = 25 mm
σcr = MPa
11.Centroid & second moment of areaMedium
200 mm150 mm105 mmØ30xIx​ = ?

A 200 mm × 150 mm plate has a circular hole of diameter 30 mm on its vertical centre line, with its centre 105 mm above the bottom. Find the second moment of area Ix about the horizontal axis through the centroid.

b = 200 mmh = 150 mmd = 30 mmhole centre: y = 105 mm
Ix = × 10⁶ mm⁴
12.Centroid & second moment of areaHard
100240163301414xdimensions in mm

A welded I-section has a top flange 100 × 16 mm, a web 330 mm high and 14 mm thick, and a bottom flange 240 × 14 mm (width × thickness). Find its second moment of area Ix about the horizontal axis x through its centroid.

top flange: 100 × 16 mmweb: 14 × 330 mmbottom flange: 240 × 14 mm
Ix = × 10⁶ mm⁴
13.Effective stress in soilMedium
sandγd​ = 16 kN/m³γsat​ = 19 kN/m³14 mwater tableXz = 6 m

For the soil profile shown, find the total vertical stress σ at point X.

z = 6 mzw = 3 mγw = 9.81 kN/m³sand: γd = 16 kN/m³sand: γsat = 19 kN/m³
σ = kPa
14.Effective stress in soilHard
sandγd​ = 16 kN/m³γsat​ = 19 kN/m³4 mclayγsat​ = 19 kN/m³8 mwater tableXz = 8 m

For the soil profile shown, find the vertical effective stress σ′ at point X.

z = 8 mzw = 3 mγw = 9.81 kN/m³sand: γd = 16 kN/m³sand: γsat = 19 kN/m³clay: γsat = 19 kN/m³
σ′ = kPa
15.Consolidation settlementMedium
Δσ = 200 kPasandclayCc​ = 0.3, Cr​ = 0.05e0​ = 0.75σ′0​ = 95 kPaσ′p​ = 205 kPa6 mwater table

A 6 m thick overconsolidated clay layer has Cc = 0.3, Cr = 0.05 and e₀ = 0.75. At its mid-depth the effective vertical stress is 95 kPa and the preconsolidation pressure is 205 kPa. A new building adds 200 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.

H = 6 mCc = 0.3Cr = 0.05e0 = 0.75σ′0 = 95 kPaσ′p = 205 kPaΔσ = 200 kPa
S = mm
16.Consolidation settlementHard
sandclayH = 3.5 m3.5 mimpervious rockwater table

In a laboratory oedometer test, a clay specimen 20 mm thick, drained at the top and bottom, reaches 50% consolidation in 12 min. In the field the same clay forms a layer 3.5 m thick. It lies on impervious rock, with sand above it, so water drains out only at the top. How many days t does the field layer take to reach 50% consolidation?

hlab = 20 mmtlab = 12 minH = 3.5 mfield: single drainage
t = days
17.Hydrostatic forceMedium
gated = 1 mH = 3 m

A vertical rectangular gate 2 m wide sits in the wall of a tank of water, with its top edge 1 m below the surface. Find the resultant hydrostatic force F on the gate.

d = 1 mH = 3 mb = 2 mρ = 1000 kg/m³g = 9.81 m/s²
F = kN
18.Hydrostatic forceHard
gated = 1.5 mH = 1 m

A vertical rectangular gate 2 m wide sits in the wall of a tank of water, with its top edge 1.5 m below the surface. Find the depth ycp of the centre of pressure below the surface.

d = 1.5 mH = 1 mb = 2 mρ = 1000 kg/m³g = 9.81 m/s²
ycp = m
19.Pipe friction & head lossMedium
V = 3 m/sD = 200 mmL = 100 mf = 0.02

Water flows at a mean velocity of 3 m/s through a pipe 100 m long with an inside diameter of 200 mm. Use the Darcy friction factor f = 0.02 and g = 9.81 m/s². Find the friction head loss hf.

V = 3 m/sL = 100 mD = 200 mmf = 0.02g = 9.81 m/s²
hf = m
20.Pipe friction & head lossHard
K = 10Δz = 36 mL = 300 m, D = 150 mm, f = 0.0152× bend (K = 0.3)

Two open reservoirs are joined by a pipe 300 m long with an inside diameter of 150 mm and a Darcy friction factor f = 0.015. The water surface of the upper reservoir is 36 m above that of the lower one. The minor losses are a square-edged entrance (K = 0.5), 2 bends (K = 0.3 each), a valve (K = 10) and the exit into the lower reservoir (K = 1.0). Use g = 9.81 m/s². Find the flow rate Q in L/s.

Δz = 36 mL = 300 mD = 150 mmf = 0.015Kentrance = 0.5Kbend = 0.3 (×2)Kvalve = 10Kexit = 1.0
Q = L/s
21.Open-channel flow (Manning)Medium
D = 300 mmn = 0.013, S = 0.004

A concrete storm sewer with an inside diameter of 300 mm flows just full (as an open channel, not under pressure). Manning n = 0.013 and the slope is S = 0.004. Find the flow rate Q in m³/s.

D = 300 mmn = 0.013S = 0.004
Q = m³/s
22.Open-channel flow (Manning)Hard
b = 4 my = 0.8 mn = 0.015, Q = 5.7 m³/s

A rectangular brickwork channel 4 m wide must carry 5.7 m³/s in uniform flow at a depth of 0.8 m. Manning n = 0.015. Find the required bed slope S (in m/m).

Q = 5.7 m³/sb = 4 my = 0.8 mn = 0.015
S = m/m
23.Pumps & pump powerMedium
PQ = 25 L/sH = 56 m

A pump delivers 25 L/s of water (ρ = 1000 kg/m³) against a head of 56 m. The pump efficiency is 70% and the electric motor driving it has an efficiency of 90%. Use g = 9.81 m/s². Find the electrical power Pel the motor draws, in kW.

Q = 25 L/sH = 56 mηpump = 70%ηmotor = 90%g = 9.81 m/s²
Pel = kW
24.Pumps & pump powerHard
150 kPa (gauge)PQ = 75 L/sΔz = 17 mL = 200 m, D = 200 mm, f = 0.015, ΣK = 8

A pump moves 75 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 17 m higher. The pipe is 200 m long with an inside diameter of 200 mm and a Darcy friction factor f = 0.015; the minor-loss coefficients add up to ΣK = 8 (entrance and exit included). Use g = 9.81 m/s². The upper tank is closed and the air above its water is at a gauge pressure of 150 kPa. Find the head H the pump must add.

Q = 75 L/sΔz = 17 mL = 200 mD = 200 mmf = 0.015ΣK = 8ptank = 150 kPa
H = m
25.Time value of moneyMedium
years01234567PV = ?€20 000

You need €20 000 in 7 years. An account pays 6% per year, compounded monthly. How much must you deposit today? Find the present value PV.

FV = €20 0006% / 12n = 7
PV = €
26.Time value of moneyHard
months0123…216€250€250€250FV = ?

You save €250 at the end of every month for 18 years. The account pays 6% per year, compounded monthly. How much have you saved at the end? Find FV.

A = €2506% / 12N = 216
FV = €
27.NPV & IRRMedium
years0123456−20 0007 0007 0007 0007 0007 0007 000

A project costs €20 000 today and returns €7 000 at the end of each year for 6 years. The cost of capital is 6%. Assume cash flows arrive evenly through each year. Find the discounted payback period DPB in years.

r = 6%CF0 = −20 000CF1 = 7 000CF2 = 7 000CF3 = 7 000CF4 = 7 000CF5 = 7 000CF6 = 7 000
DPB = years
28.NPV & IRRHard
r (%)NPVABr* = ?0

Project A costs €30 000 and returns €17 000, €11 000, €6 500 at the end of years 1 to 3. Project B costs €40 000 and returns €10 000, €15 500, €21 500. Find the crossover rate r* at which both projects have the same NPV, in percent.

A: −30 000, 17 000, 11 000, 6 500B: −40 000, 10 000, 15 500, 21 500
r* = %
29.Normal distributionMedium
−3−2−10123zshaded area between −z and z = 0.9342

Drag z so that the shaded area between −z and z under the standard normal curve is 0.9342. Find z to two decimals.

A = 0.9342
z =
30.Normal distributionHard
10 g0X − Y?

The mass X of a product from line 1 and Y from line 2 are independent and normal: X has mean 500 g and standard deviation 8 g, Y has mean 490 g and standard deviation 6 g. Find the probability P that X is greater than Y. Round z to two decimals.

μX = 500 g, σX = 8 gμY = 490 g, σY = 6 g
P =

3Solutions

1.Beam support reactions

Answer: RB = 5 kN

Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Replace each distributed load by its resultant (its area) acting at the centroid of the load diagram, and take moments about a support to remove that support’s reaction from the equation.

Moments about A

Counter-clockwise positive.

ΣMA = 0: RB·10 − 65·1 + 15 = 0
RB = 50/10 = 5 kN

Vertical equilibrium

RA = 65 − 5 = 60 kN

Answer

RB = 5 kN

A negative reaction acts downward.

2.Beam support reactions

Answer: RA = 19.67 kN

Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.

w = 4 kN/mP = 25 kNABRA​RB​1 m1 m4 m

Free-body diagram

Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.

Equilibrium

Moments about A, counter-clockwise positive. Then vertical force balance.

UDL resultant: W = w·ℓ = 4·1 = 4 kN, acting at x̄ = 1.5 m
ΣMA = 0: RB·6 = 25·2 + 4·1·1.5
RB = 56/6 = 9.333 kN
ΣFy = 0: RA = 29 − 9.333 = 19.67 kN

Answer

RA = 19.67 kN
3.Truss: method of joints

Answer: member BF

Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.

Joint B

AB and BC lie on one straight line and the joint carries no load. Balancing forces across that line leaves only BF.

ΣF⊥ = 0 → FBF = 0

Check with the method of joints

Solving all joints gives these member forces (T = tension, C = compression).

AB: 28.12 kN (T), BC: 28.12 kN (T), CD: 58.12 kN (T), DE: 58.12 kN (T), FG: 56.25 kN (C), GH: 56.25 kN (C), AF: 46.88 kN (C), HE: 96.87 kN (C), BF: 0, CG: 35 kN (C), DH: 40 kN (T), FC: 46.88 kN (T), HC: 3.125 kN (C)

Answer

Zero-force member: BF
4.Truss: method of joints

Answer: member BF

Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.

Joint B

AB and BC lie on one straight line and the joint carries no load. Balancing forces across that line leaves only BF.

ΣF⊥ = 0 → FBF = 0

Check with the method of joints

Solving all joints gives these member forces (T = tension, C = compression).

AB: 35 kN (T), BC: 35 kN (T), CD: 35 kN (T), DE: 35 kN (T), FG: 55 kN (C), GH: 55 kN (C), AF: 28.28 kN (C), HE: 49.5 kN (C), BF: 0, CG: 40 kN (C), DH: 15 kN (T), FC: 28.28 kN (T), HC: 28.28 kN (T)

Answer

Zero-force member: BF
5.Shear force & bending moment

Answer: Mmax = 206.3 kN·m

Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut. Maximum moment: since dM/dx = V, the bending moment has its peak where the shear force passes through zero, either at a point load or inside a distributed load.

Support reactions

Equilibrium of the whole beam.

ΣMA = 0: RB·8 = 60·2 + 70·3
RB = 330/8 = 41.25 kN
ΣFy = 0: RA = 130 − 41.25 = 88.75 kN

Moment under each load

Keep the part left of each load.

under P1: M = RA·2 = 88.75·2 = 177.5 kN·m
under P2: M = RB·5 = 41.25·5 = 206.3 kN·m

Largest value

Mmax = 206.3 kN·m (under P2)

Answer

Mmax = 206.3 kN·m
6.Shear force & bending moment

Answer: Mx = 140.6 kN·m

Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut.

Support reactions

Equilibrium of the whole beam.

UDL resultant: W = w·ℓ = 10·8 = 80 kN, acting at x̄ = 4 m
ΣMA = 0: RB·8 = 55·6 + 10·8·4
RB = 650/8 = 81.25 kN
ΣFy = 0: RA = 135 − 81.25 = 53.75 kN
w = 10 kN/mP = 55 kNABRA​ = 53.75RB​ = 81.25section4.5 m1.5 m2 m

Cut at x = 4.5 m and keep the left part

Only forces left of the cut appear. A UDL portion acts as one force at the middle of that portion.

M = RA·x − (each load left of the cut × its distance to the cut)
Mx = 53.75·4.5 − 10·4.5·2.25 = 140.6 kN·m

Answer

Mx = 140.6 kN·m
7.Beam deflection

Answer: δ = 1.507 mm

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).

Consistent units

Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.

w = 6 N/mm, L = 1500 mm
EI = 2.52 × 10¹² N·mm²

Deflection

δ = wL⁴/(8EI) = 6·1500⁴/(8·2.52 × 10¹²) = 1.507 mm

Answer

δ = 1.507 mm
8.Beam deflection

Answer: hreq = 169.5 mm

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).

Consistent units

Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.

w = 4 N/mm, L = 3500 mm, E = 11000 N/mm²

Deflection limit

δallow = L/250 = 3500/250 = 14 mm

Required second moment of area

Ireq = 5wL⁴/(384·E·δallow) = 5·4·3500⁴/(384·11000·14) = 5.075 × 10⁷ mm⁴

Required depth

bh³/12 = Ireq → h = (12·5.075 × 10⁷/125)1/3 = 169.5 mm

Answer

hreq = 169.5 mm

In practice, choose the next standard depth above this value.

9.Column buckling

Answer: Pcr = 20.25 kN

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Smallest second moment of area

A round section has the same I about every axis.

I = πd⁴/64 = π·40⁴/64 = 125664 mm⁴

Effective length

KL = 0.7·5000 = 3500 mm

Critical load

Pcr = π²EI/(KL)² = π²·200000·125664/3500² = 20249 N = 20.25 kN

Answer

Pcr = 20.25 kN
10.Column buckling

Answer: σcr = 4.819 MPa

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Smallest second moment of area

A round section has the same I about every axis.

I = πd⁴/64 = π·25⁴/64 = 19175 mm⁴

Radius of gyration and slenderness

A = 490.9 mm²
r = √(I/A) = √(19175/490.9) = 6.25 mm
KL = 1·4000 = 4000 mm
KL/r = 4000/6.25 = 640

Critical stress

σcr = π²E/(KL/r)² = π²·200000/640² = 4.819 MPa

Answer

σcr = 4.819 MPa
11.Centroid & second moment of area

Answer: Ix = 55.56 × 10⁶ mm⁴

Sections with holes: treat a hole as a negative area. The centroid is ȳ = (A₁y₁ − A₂y₂)/(A₁ − A₂), with A₁, y₁ for the full plate and A₂, y₂ for the hole. For the second moment of area about the centroidal axis, use the parallel-axis theorem for each part and subtract the hole: I = (Ic1 + A₁d₁²) − (Ic2 + A₂d₂²), where d is the distance from each part's own centroid to the axis through ȳ. A rectangle has Ic = bh³/12 and a circle Ic = πd⁴/64.

Centroid

ȳ = (30000·75 − 706.9·105)/(30000 − 706.9) = 74.28 mm

Full plate about ȳ

200·150³/12 + 30000·0.7239² = 56.27 × 10⁶ mm⁴

Hole about ȳ

π·30⁴/64 + 706.9·30.72² = 0.707 × 10⁶ mm⁴

Subtract

Ix = 55.56 × 10⁶ mm⁴

Answer

Ix = 55.56 × 10⁶ mm⁴
12.Centroid & second moment of area

Answer: Ix = 179.8 × 10⁶ mm⁴

Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.

Split into three rectangles

Measure every y from the bottom edge.

top flange: A = 1600 mm², y = 352 mm
web: A = 4620 mm², y = 179 mm
bottom flange: A = 3360 mm², y = 7 mm

Centroid

ȳ = (1600·352 + 4620·179 + 3360·7)/9580 = 147.6 mm

Parallel-axis theorem

top flange: 100·16³/12 + 1600·204.4² = 6.69 × 10⁷ mm⁴
web: 14·330³/12 + 4620·31.43² = 4.649 × 10⁷ mm⁴
bottom flange: 240·14³/12 + 3360·140.6² = 6.645 × 10⁷ mm⁴
Ix = 6.69 × 10⁷ + 4.649 × 10⁷ + 6.645 × 10⁷
Ix = 1.798 × 10⁸ mm⁴ = 179.8 × 10⁶ mm⁴

Answer

Ix = 179.8 × 10⁶ mm⁴
13.Effective stress in soil

Answer: σ = 105 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Total stress

Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.

σ = γd·zw + γsat·(z − zw) = 16·3 + 19·3 = 105 kPa

Answer

σ = 105 kPa
14.Effective stress in soil

Answer: σ′ = 93.95 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Total stress

Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.

σ = γd·3 + γsat,sand·1 + γsat,clay·4
σ = 16·3 + 19·1 + 19·4 = 143 kPa

Pore water pressure

Water pressure grows with depth below the water table.

u = γw·(z − zw) = 9.81·5 = 49.05 kPa

Effective stress

σ′ = σ − u = 143 − 49.05 = 93.95 kPa

Answer

σ′ = 93.95 kPa
15.Consolidation settlement

Answer: S = 219.8 mm

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Compare with the preconsolidation pressure

σ′f = 95 + 200 = 295 kPa > 205 kPa

Settlement

Recompression up to σ′p, virgin compression beyond it.

S = 0.05·6/(1 + 0.75)·log₁₀(205/95) + 0.3·6/(1 + 0.75)·log₁₀(295/205)
S = 57.26 + 162.6 = 219.8 mm

Answer

S = 219.8 mm
16.Consolidation settlement

Answer: t = 1021 days

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Drainage paths

Hdr,lab = 20/2 = 10 mm = 0.01 m
Hdr,field = 3.5 m

Scale the time

t = Tv·Hdr²/cv with the same T_v and cv in the lab and the field.

tfield = 12·(3.5/0.01)² = 1.47 × 10⁶ min
tfield = 1.47 × 10⁶/1440 = 1021 days

Answer

t = 1021 days
17.Hydrostatic force

Answer: F = 147.2 kN

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 1 + 3/2 = 2.5 m
A = H·b = 3·2 = 6 m²
gated = 1 mH = 3 mF

Resultant force

F = ρ·g·yc·A = 1000·9.81·2.5·6 = 147.2 kN

Answer

F = 147.2 kN
18.Hydrostatic force

Answer: ycp = 2.042 m

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 1.5 + 1/2 = 2 m
A = H·b = 1·2 = 2 m²
gated = 1.5 mH = 1 mF

Resultant force

F = ρ·g·yc·A = 1000·9.81·2·2 = 39.24 kN

Centre of pressure

Pressure grows with depth, so the resultant acts below the centroid.

Ic = b·H³/12 = 2·1³/12 = 0.1667 m⁴
ycp = yc + Ic/(yc·A) = 2 + 0.1667/(2·2) = 2.042 m

Answer

ycp = 2.042 m
19.Pipe friction & head loss

Answer: hf = 4.587 m

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Velocity head

V²/(2g) = 3²/(2·9.81) = 0.4587 m

Darcy–Weisbach

hf = f·(L/D)·V²/(2g) = 0.02·(100/0.2)·3²/(2·9.81) = 4.587 m

Answer

hf = 4.587 m
20.Pipe friction & head loss

Answer: Q = 72.38 L/s

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Loss coefficients

f·L/D = 0.015·300/0.15 = 30
ΣK = 0.5 + 2·0.3 + 10 + 1.0 = 12.1

Energy equation

Both surfaces are open to the air and practically at rest, so all of Δz is lost in the pipe.

36 = (30 + 12.1)·V²/(2·9.81)
V = √(2·9.81·36/42.1) = 4.096 m/s

Flow rate

Q = V·π·D²/4 = 4.096·0.01767 = 0.07238 m³/s = 72.38 L/s

Answer

Q = 72.38 L/s
21.Open-channel flow (Manning)

Answer: Q = 0.06116 m³/s

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Geometry

A = 0.07069 m², R = D/4 = 0.075 m

Velocity

V = (1/0.013)·0.0752/3·0.0041/2 = 0.8652 m/s

Flow rate

Q = A·V = 0.07069·0.8652 = 0.06116 m³/s

Answer

Q = 0.06116 m³/s
22.Open-channel flow (Manning)

Answer: S = 0.001506 m/m

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Geometry

A = b·y = 4·0.8 = 3.2 m²
P = b + 2y = 4 + 2·0.8 = 5.6 m
R = A/P = 0.5714 m

Solve Manning for S

S1/2 = n·Q/(A·R2/3) = 0.015·5.7/(3.2·0.6886) = 0.0388
S = 0.0388² = 0.001506

Answer

S = 0.001506

That is a fall of 1.506 m per kilometre.

23.Pumps & pump power

Answer: Pel = 21.8 kW

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Hydraulic power

Ph = ρ·g·Q·H = 1000·9.81·0.025·56 = 13.73 kW

Shaft power

Pshaft = 13.73/0.7 = 19.62 kW

Electrical power

Pel = 19.62/0.9 = 21.8 kW

Answer

Pel = 21.8 kW
24.Pumps & pump power

Answer: H = 38.97 m

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Velocity

V = Q/A = 0.075/0.03142 = 2.387 m/s
V²/(2g) = 0.2905 m

Head losses

hL = (f·L/D + ΣK)·V²/(2g) = (15 + 8)·0.2905 = 6.681 m

Pressure head

p/(ρ·g) = 150000/(1000·9.81) = 15.29 m

Pump head

Both surfaces are practically at rest, so there is no velocity head term.

H = Δz + p/(ρ·g) + hL = 17 + 15.29 + 6.681 = 38.97 m

Answer

H = 38.97 m
25.Time value of money

Answer: PV = 13155 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Rate and number of periods

i = 0.06/12 = 0.005
N = 12·7 = 84

Present value

PV = FV/(1 + i)N = 20 000/1.52 = €13 154.70

Answer

PV = €13 154.70
26.Time value of money

Answer: FV = 96838 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Monthly rate and number of deposits

i = 0.06/12 = 0.005
N = 12·18 = 216

Future value of the deposits

FV = A·((1 + i)N − 1)/i = 250·(2.937 − 1)/0.005 = €96 838.30

Answer

FV = €96 838.30

You paid in €54 000 yourself; the rest is interest.

27.NPV & IRR

Answer: DPB = 3.232 years

Payback period: the time until the cumulative cash flows repay the initial investment. Cash is assumed to come in evenly during each year, so the last part is a fraction of a year. The simple payback ignores the time value of money; the discounted payback period uses the discounted cash flows instead.

Discounted and cumulative cash flows

year 1: 7 000/1.06 = 6 603.77 → Σ = 6 603.77
year 2: 7 000/1.124 = 6 229.98 → Σ = 12 833.75
year 3: 7 000/1.191 = 5 877.33 → Σ = 18 711.08
year 4: 7 000/1.262 = 5 544.66 → Σ = 24 255.74

Fraction of the last year

DPB = 3 + 1 288.92/5 544.66 = 3.232

Answer

DPB = 3.232 years

The discounted payback is always longer than the simple payback (2.857 years).

28.NPV & IRR

Answer: r* = 5.988 %

Crossover rate: the discount rate at which two projects have the same NPV. It is the IRR of the difference in their cash flows (B − A). Below it the project with the later, larger cash flows has the higher NPV; above it the other one wins.

Difference in cash flows

ΔCF0 = −40 000 − (−30 000) = −10 000
ΔCF1 = 10 000 − 17 000 = −7 000
ΔCF2 = 15 500 − 11 000 = 4 500
ΔCF3 = 21 500 − 6 500 = 15 000

IRR of the difference

NPVΔ(5%) = 372.53
NPVΔ(6%) = −4.50
r* = 5.988%

Answer

r* = 5.988%

Check: at 5.988% both NPVs are €1 291.19.

29.Normal distribution

Answer: z = 1.84

From an area back to z: Φ(z) is the area to the left of z. For a left-tail area A, find z with Φ(z) = A in the table. A right-tail area A means Φ(z) = 1 − A. A central area A between −z and z leaves (1 − A)/2 in each tail, so Φ(z) = (1 + A)/2. For a value x, use x = μ + zσ.

Area to the left of z

Φ(z) = (1 + 0.9342)/2 = 0.9671

Read the z-table backwards

Find 0.9671 inside the table and read off z.

z = 1.84

Answer

z = 1.84
30.Normal distribution

Answer: P = 0.8413

Sums and differences of normal variables: if X and Y are independent and normal, X + Y and X − Y are normal too. Means add or subtract: E(X ± Y) = μX ± μY. Variances always add, also for a difference: Var(X ± Y) = σX² + σY², so σ = √(σX² + σY²). Standard deviations never add directly. The total of n independent items with the same distribution has mean n·μ and standard deviation σ·√n. Then standardise as usual: z = (x − mean)/σ and read Φ(z).

Distribution of the difference

μ = 500 − 490 = 10 g, σ = 10 g

Standardise

z = (0 − 10)/10 = −1

Probability

P = 1 − Φ(−1) = 0.8413

Answer

P = 0.8413

This is independent practice material. ExamProblems is not affiliated with or endorsed by the organisation that runs this exam, and the exam name is used only to describe the content. The FE exam is run by NCEES, which is not affiliated with ExamProblems and does not endorse it.

ExamProblems · examproblems.com/courses/fe-exam-civil