FE Civil exam practice: cram pack

Formula sheets, the key method steps for every topic and 30 practice problems, with full solutions at the back.

New problemsBack to the course

In the print window, choose “Save as PDF” to keep a copy on your device.

1Formulas and methods

Beam support reactions

Equilibrium
ΣFx = 0, ΣFy = 0, ΣM = 0
Uniform load
resultant w·L at the middle of the load
Moment
M = F·d

Method

  1. Draw a free-body diagram and replace each support by its reactions.
  2. Replace every distributed load by a single force at its centroid.
  3. Take moments about one support to find the reaction at the other.
  4. Use ΣFy = 0 to find the remaining reaction, and check with a second moment equation.

Truss: method of joints

Method of joints
ΣFx = 0, ΣFy = 0 at each joint
Method of sections
ΣM = 0 about a cut point
Member force
positive = tension, negative = compression

Method

  1. Find the support reactions for the whole truss.
  2. Method of joints: start at a joint with at most two unknown member forces and use ΣFx = 0 and ΣFy = 0.
  3. Method of sections: cut through the member you need and take moments about a point where the other unknown members meet.
  4. Assume tension; a negative answer means compression.

Shear force & bending moment

Shear and moment
V = ΣF on one side, M = ΣF·d on one side
Bending stress
σ = M·y/I
Rectangle
I = bh³/12
Section modulus
W = I/ymax
Simply supported, uniform load
Mmax = wL²/8

Method

  1. Find the support reactions from equilibrium of the whole beam.
  2. Cut the beam at the section you need and keep one side.
  3. Shear force: sum of the vertical forces on that side. Bending moment: sum of their moments about the cut.
  4. For the maximum moment, find where the shear force is zero.

Beam deflection

Point load at midspan
δ = PL³/(48EI)
Uniform load, simply supported
δ = 5wL⁴/(384EI)
Cantilever, end load
δ = PL³/(3EI)
Cantilever, uniform load
δ = wL⁴/(8EI)
Superposition
δ = δ1 + δ2

Column buckling

Euler load
Pcr = π²EI/(KL)²
Effective length factor
K = 1 pinned–pinned, 0.5 fixed–fixed, 0.7 fixed–pinned, 2 fixed–free
Critical stress
σcr = Pcr/A
Slenderness
λ = KL/r, r = √(I/A)

Centroid & second moment of area

Centroid
ȳ = ΣAiyi/ΣAi
Rectangle
I = bh³/12
Parallel-axis theorem
I = Ic + A·d²
Composite section
I = Σ(Ic,i + Aidi²)

Effective stress in soil

Total stress
σ = Σγi·hi
Pore water pressure
u = γw·(z − zw)
Effective stress
σ′ = σ − u
Water
γw = 9.81 kN/m³

Consolidation settlement

Normally consolidated
S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0)
Final stress
σ′f = σ′0 + Δσ (at mid-depth of the layer)
Overconsolidated, σ′f ≤ σ′p
S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0)
Overconsolidated, σ′f > σ′p
S = H/(1 + e0)·[Cr·log₁₀(σ′p/σ′0) + Cc·log₁₀(σ′f/σ′p)]
Overconsolidation ratio
OCR = σ′p/σ′0
Time for consolidation
t = Tv·Hdr²/cv
Drainage path
Hdr = H/2 (double drainage), H (single drainage)
Time factors
U 50% → 0.197, 60% → 0.287, 70% → 0.403, 80% → 0.567, 90% → 0.848

Hydrostatic force

Pressure at depth
p = ρgh
Force on a vertical wall
F = ρg·hc·A
Centre of pressure
yp = yc + Ic/(ycA)
Rectangle
Ic = bH³/12

Pipe friction & head loss

Reynolds number
Re = V·D/ν = ρ·V·D/μ
Flow regime
laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)

Open-channel flow (Manning)

Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²

Pumps & pump power

Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)

Time value of money

Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i

Method

  1. Draw a timeline with every cash flow and its timing.
  2. Match the rate to the period: a monthly rate for monthly payments.
  3. Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
  4. Check the sign and the order of magnitude of the answer.

NPV & IRR

Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)

Method

  1. List all cash flows with their year; the investment at year 0 is negative.
  2. Discount each cash flow: CFt/(1 + r)t.
  3. Add them up to get the NPV. Positive means the project earns more than r.
  4. For the IRR, find the rate that makes NPV zero by trial or interpolation.

Normal distribution

z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ

Method

  1. Convert the value to a z-score: z = (x − μ)/σ.
  2. Look up Φ(z), the area to the left of z.
  3. For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
  4. For a percentile, work backwards: find z for the area, then x = μ + z·σ.

2Practice problems

1.Beam support reactionsMedium
P1​ = 45 kNP2​ = 25 kNABRA​RB​ = ?2 m0.5 m1.5 m

The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RB.

L = 4 mP1 = 45 kN at 2 mP2 = 25 kN at 2.5 m
RB = kN
2.Beam support reactionsHard
w = 12 kN/mP = 25 kNABRA​ = ?RB​2 m0.5 m1.5 m1 m

The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RA.

L = 5 mP = 25 kN at 2.5 mw = 12 kN/m from 2 to 4 m
RA = kN
3.Truss: method of jointsMedium
ABCDEFGH35 kN30 kN25 kN4 × 4 m3 m

Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.

B: 35 kN ↓D: 30 kN ↓G: 25 kN ↓
  1. 1member AB
  2. 2member BC
  3. 3member CD
  4. 4member DE
  5. 5member FG
  6. 6member GH
  7. 7member AF
  8. 8member HE
  9. 9member BF
  10. 10member CG
  11. 11member DH
  12. 12member BG
  13. 13member DG
4.Truss: method of jointsHard
ABCDEFGH20 kN20 kN20 kN10 kN25 kN4 × 4 m4 m

Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.

B: 20 kN ↓D: 20 kN ↓F: 20 kN ↓G: 10 kN ↓H: 25 kN ←
  1. 1member AB
  2. 2member BC
  3. 3member CD
  4. 4member DE
  5. 5member FG
  6. 6member GH
  7. 7member AF
  8. 8member HE
  9. 9member BF
  10. 10member CG
  11. 11member DH
  12. 12member BG
  13. 13member DG
5.Shear force & bending momentMedium
6 kN/m45 kNABCDEFG2 m2 m2 m2 m2 m2 m

The marks A to G split the beam into six equal parts. At which mark is the bending moment largest in size, sagging or hogging? Click it in the diagram.

45 kN @ 4 m6 kN/m, 2–12 m
  1. 1A (x = 0 m)
  2. 2B (x = 2 m)
  3. 3C (x = 4 m)
  4. 4D (x = 6 m)
  5. 5E (x = 8 m)
  6. 6F (x = 10 m)
  7. 7G (x = 12 m)
6.Shear force & bending momentHard
w = 2 kN/mABC6 m1 m

The beam rests on a pin at A and a roller at B and overhangs B by 1 m to the free end C. A uniformly distributed load w acts over the whole length A–C. Find the bending moment MB at support B. Use sagging moments positive and upward shear on the left face positive.

L = 7 mw = 2 kN/m from 0 to 7 msupports at x = 0 and x = 6 m
MB = kN·m
7.Beam deflectionMedium
w = 10 kN/mδL = 4 m

A simply supported beam carries a uniformly distributed load w over its whole span. Find the maximum deflection δmax, at midspan.

w = 10 kN/mL = 4 mE = 70 GPa (aluminium)I = 57 × 10⁶ mm⁴
δmax = mm
8.Beam deflectionHard
w = 10 kN/mP = 23 kNδL = 4 m

A simply supported beam carries a uniformly distributed load w and a point load P at midspan. Using superposition, find the midspan deflection δmax.

P = 23 kNw = 10 kN/mL = 4 mE = 70 GPa (aluminium)I = 160 × 10⁶ mm⁴
δmax = mm
9.Column bucklingMedium
PL = 4 m25 × 100 mmcross-section

A column of length L made of steel is pinned at both ends. Using Euler’s formula, find its critical buckling load Pcr.

L = 4 mE = 200 GPa (steel)b × h = 25 × 100 mm
Pcr = kN
10.Column bucklingHard
PL = 5 md = 40 mmcross-section

A column of length L made of aluminium is fixed at the base and pinned at the top. Find its slenderness and the critical buckling stress σcr from Euler’s formula.

L = 5 mE = 70 GPa (aluminium)d = 40 mm
σcr = MPa
11.Centroid & second moment of areaMedium
120 mm300 mm195 mmØ50xIx​ = ?

A 120 mm × 300 mm plate has a circular hole of diameter 50 mm on its vertical centre line, with its centre 195 mm above the bottom. Find the second moment of area Ix about the horizontal axis through the centroid.

b = 120 mmh = 300 mmd = 50 mmhole centre: y = 195 mm
Ix = × 10⁶ mm⁴
12.Centroid & second moment of areaHard
3002522018xM = 40 kN·mdimensions in mm

The T-section is used as a beam with the flange on top and carries a sagging bending moment of 40 kN·m. Find the size of the bending stress σtop at the top edge.

bf = 300 mmtf = 25 mmtw = 18 mmhw = 220 mmM = 40 kN·m
σtop = MPa
13.Effective stress in soilMedium
sandγd​ = 16.5 kN/m³γsat​ = 20.5 kN/m³8 mwater tableXz = 7 m

For the soil profile shown, find the vertical effective stress σ′ at point X.

z = 7 mzw = 4 mγw = 9.81 kN/m³sand: γd = 16.5 kN/m³sand: γsat = 20.5 kN/m³
σ′ = kPa
14.Effective stress in soilHard
sandγd​ = 15 kN/m³γsat​ = 19 kN/m³6 mclayγsat​ = 17.5 kN/m³5 mwater tableXz = 8.5 m

For the soil profile shown, find the total vertical stress σ at point X.

z = 8.5 mzw = 2 mγw = 9.81 kN/m³sand: γd = 15 kN/m³sand: γsat = 19 kN/m³clay: γsat = 17.5 kN/m³
σ = kPa
15.Consolidation settlementMedium
Δσ = 150 kPasandclayCc​ = 0.45, Cr​ = 0.06e0​ = 0.6σ′0​ = 95 kPaσ′p​ = 155 kPa6.5 mwater table

A 6.5 m thick overconsolidated clay layer has Cc = 0.45, Cr = 0.06 and e₀ = 0.6. At its mid-depth the effective vertical stress is 95 kPa and the preconsolidation pressure is 155 kPa. A new building adds 150 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.

H = 6.5 mCc = 0.45Cr = 0.06e0 = 0.6σ′0 = 95 kPaσ′p = 155 kPaΔσ = 150 kPa
S = mm
16.Consolidation settlementHard
sandclayH = 3.5 mcv​ = 2.5 m²/year3.5 msandwater table

A clay layer 3.5 m thick has a coefficient of consolidation cv = 2.5 m²/year. It lies between two sand layers, so water drains out at the top and the bottom. For 50% average consolidation the time factor is Tv = 0.197. How many years t does the layer take to reach 50% consolidation?

H = 3.5 mcv = 2.5 m²/yearU = 50%Tv = 0.197double drainage
t = years
17.Hydrostatic forceMedium
gated = 2 mH = 1 m

A vertical rectangular gate 2 m wide sits in the wall of a tank of water, with its top edge 2 m below the surface. Find the resultant hydrostatic force F on the gate.

d = 2 mH = 1 mb = 2 mρ = 1000 kg/m³g = 9.81 m/s²
F = kN
18.Hydrostatic forceHard
gated = 0.5 mH = 1.5 m

A vertical rectangular gate 3 m wide sits in the wall of a tank of oil, with its top edge 0.5 m below the surface. Find the resultant hydrostatic force F on the gate.

d = 0.5 mH = 1.5 mb = 3 mρ = 880 kg/m³g = 9.81 m/s²
F = kN
19.Pipe friction & head lossMedium
Q = 6 L/sD = 75 mmL = 100 mf = 0.02

Water flows at 6 L/s through a pipe 100 m long with an inside diameter of 75 mm. Use the Darcy friction factor f = 0.02 and g = 9.81 m/s². Find the friction head loss hf.

Q = 6 L/sL = 100 mD = 75 mmf = 0.02g = 9.81 m/s²
hf = m
20.Pipe friction & head lossHard
K = 10Δz = 23 mL = 300 m, D = 300 mm, f = 0.0152× bend (K = 0.3)

Two open reservoirs are joined by a pipe 300 m long with an inside diameter of 300 mm and a Darcy friction factor f = 0.015. The water surface of the upper reservoir is 23 m above that of the lower one. The minor losses are a square-edged entrance (K = 0.5), 2 bends (K = 0.3 each), a valve (K = 10) and the exit into the lower reservoir (K = 1.0). Use g = 9.81 m/s². Find the flow rate Q in L/s.

Δz = 23 mL = 300 mD = 300 mmf = 0.015Kentrance = 0.5Kbend = 0.3 (×2)Kvalve = 10Kexit = 1.0
Q = L/s
21.Open-channel flow (Manning)Medium
b = 6 my = 0.7 mn = 0.015, S = 0.004

A rectangular brickwork channel is 6 m wide. Water flows uniformly 0.7 m deep. Manning n = 0.015 and the bed slope is S = 0.004. Find the flow rate Q in m³/s.

b = 6 my = 0.7 mn = 0.015S = 0.004
Q = m³/s
22.Open-channel flow (Manning)Hard
D = 250 mmn = 0.013, V = 1 m/s

A concrete sewer with an inside diameter of 250 mm (Manning n = 0.013) must reach a self-cleansing velocity of 1 m/s when flowing just full. Find the minimum slope S (in m/m).

D = 250 mmn = 0.013V = 1 m/s
S = m/m
23.Pumps & pump powerMedium
PQ = 40 L/sH = 44 m

A pump delivers 40 L/s of water (ρ = 1000 kg/m³) against a head of 44 m. The pump efficiency is 70% and the electric motor driving it has an efficiency of 95%. Use g = 9.81 m/s². Find the electrical power Pel the motor draws, in kW.

Q = 40 L/sH = 44 mηpump = 70%ηmotor = 95%g = 9.81 m/s²
Pel = kW
24.Pumps & pump powerHard
250 kPa (gauge)PQ = 80 L/sΔz = 6 mL = 150 m, D = 250 mm, f = 0.02, ΣK = 4

A pump moves 80 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 6 m higher. The pipe is 150 m long with an inside diameter of 250 mm and a Darcy friction factor f = 0.02; the minor-loss coefficients add up to ΣK = 4 (entrance and exit included). Use g = 9.81 m/s². The upper tank is closed and the air above its water is at a gauge pressure of 250 kPa. Find the head H the pump must add.

Q = 80 L/sΔz = 6 mL = 150 mD = 250 mmf = 0.02ΣK = 4ptank = 250 kPa
H = m
25.Time value of moneyMedium
years01234567€1 000FV = ?

You invest €1 000 at a nominal rate of 4.8% per year, compounded quarterly. Find the value FV of the investment after 7 years.

PV = €1 0004.8% / 4n = 7
FV = €
26.Time value of moneyHard
months0123…N = ?€12 000€525€525€525€5253% / 12

You borrow €12 000 at 3% per year, compounded monthly, and repay €525 at the end of every month. How many months does it take until the loan is repaid (the last payment may be smaller)? Give the number of payments N.

P = €12 000A = €5253% / 12
N = payments
27.NPV & IRRMedium
years0123…9€50 000€1 000€1 000€1 000€1 000r = 12%, EAC = ?

A machine costs €50 000 today, lasts 9 years and costs €1 000 per year to run (paid at the end of each year). The cost of capital is 12%. Find its equivalent annual cost EAC.

C0 = €50 000M = €1 000n = 9r = 12%
EAC = €
28.NPV & IRRHard
years0123…10−200 00024 000+3%+3%+3%r = 8%, NPV = ?

A project costs €200 000 today. Its cash flow is €24 000 at the end of year 1 and grows by 3% per year until the last cash flow at the end of year 10. The cost of capital is 8%. Find the net present value NPV.

C0 = €200 000CF1 = €24 000g = 3%n = 10r = 8%
NPV = €
29.Normal distributionMedium
−3−2−10123zshaded area between −z and z = 0.9756

Drag z so that the shaded area between −z and z under the standard normal curve is 0.9756. Find z to two decimals.

A = 0.9756
z =
30.Normal distributionHard
μ = 32x = ?5%

The delivery times are normally distributed with mean 32 min and standard deviation 6 min. Find the value x below which 5% of them lie (the 5th percentile).

μ = 32σ = 6P = 5%
x = min

3Solutions

1.Beam support reactions

Answer: RB = 38.13 kN

Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.

P1​ = 45 kNP2​ = 25 kNABRA​RB​2 m0.5 m1.5 m

Free-body diagram

Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.

Equilibrium

Moments about A, counter-clockwise positive. Then vertical force balance.

ΣMA = 0: RB·4 = 45·2 + 25·2.5
RB = 152.5/4 = 38.13 kN
ΣFy = 0: RA = 70 − 38.13 = 31.88 kN

Answer

RB = 38.13 kN
2.Beam support reactions

Answer: RA = 22.1 kN

Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.

w = 12 kN/mP = 25 kNABRA​RB​2 m0.5 m1.5 m1 m

Free-body diagram

Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.

Equilibrium

Moments about A, counter-clockwise positive. Then vertical force balance.

UDL resultant: W = w·ℓ = 12·2 = 24 kN, acting at x̄ = 3 m
ΣMA = 0: RB·5 = 25·2.5 + 12·2·3
RB = 134.5/5 = 26.9 kN
ΣFy = 0: RA = 49 − 26.9 = 22.1 kN

Answer

RA = 22.1 kN
3.Truss: method of joints

Answer: member CG

Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.

Joint C

BC and CD lie on one straight line and the joint carries no load. Balancing forces across that line leaves only CG.

ΣF⊥ = 0 → FCG = 0

Check with the method of joints

Solving all joints gives these member forces (T = tension, C = compression).

AB: 61.67 kN (T), BC: 76.67 kN (T), CD: 76.67 kN (T), DE: 58.33 kN (T), FG: 61.67 kN (C), GH: 58.33 kN (C), AF: 77.08 kN (C), HE: 72.92 kN (C), BF: 46.25 kN (T), CG: 0, DH: 43.75 kN (T), BG: 18.75 kN (C), DG: 22.92 kN (C)

Answer

Zero-force member: CG
4.Truss: method of joints

Answer: member CG

Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.

Joint C

BC and CD lie on one straight line and the joint carries no load. Balancing forces across that line leaves only CG.

ΣF⊥ = 0 → FCG = 0

Check with the method of joints

Solving all joints gives these member forces (T = tension, C = compression).

AB: 21.25 kN (T), BC: 27.5 kN (T), CD: 27.5 kN (T), DE: 23.75 kN (T), FG: 46.25 kN (C), GH: 48.75 kN (C), AF: 65.41 kN (C), HE: 33.59 kN (C), BF: 26.25 kN (T), CG: 0, DH: 23.75 kN (T), BG: 8.839 kN (C), DG: 5.303 kN (C)

Answer

Zero-force member: CG
5.Shear force & bending moment

Answer: C (x = 4 m)

Largest bending moment: M changes slope wherever the shear force changes, so its peaks sit where the shear force crosses zero: under a point load, inside a distributed load, or over a support of an overhang. At a fixed support of a cantilever the moment is largest at the wall. Compare the size of M at those places, sagging or hogging.

Support reactions

Take moments about one support, then use the vertical force balance.

R1 = 55 kN, R2 = 50 kN

Bending moment at every mark

Sum the moments of all forces on one side of the cut. Sagging is positive, hogging negative.

MA = 0, MB = 110, MC = 208 kN·m, MD = 192, ME = 152, MF = 88, MG = 0

Answer

Mark C: MC = 208 kN·m
6.Shear force & bending moment

Answer: MB = −1 kN·m

Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut. Maximum moment: since dM/dx = V, the bending moment has its peak where the shear force passes through zero, either at a point load or inside a distributed load.

Support reactions

Equilibrium of the whole beam, including the load on the overhang.

UDL resultant: W = w·ℓ = 2·7 = 14 kN, acting at x̄ = 3.5 m
ΣMA = 0: RB·6 = 2·7·3.5
RB = 49/6 = 8.167 kN
ΣFy = 0: RA = 14 − 8.167 = 5.833 kN

Cut at B and keep the overhang

The load on the overhang, w·a, acts at a/2 from B and makes the beam hog over the support.

MB = −w·a²/2 = −2·1²/2 = −1 kN·m

Answer

MB = −1 kN·m
7.Beam deflection

Answer: δmax = 8.354 mm

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).

Consistent units

Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.

w = 10 N/mm, L = 4000 mm
EI = 3.99 × 10¹² N·mm²

Deflection

δmax = 5wL⁴/(384EI) = 5·10·4000⁴/(384·3.99 × 10¹²) = 8.354 mm

Answer

δmax = 8.354 mm
8.Beam deflection

Answer: δmax = 5.714 mm

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).

Consistent units

Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.

P = 23000 N, w = 10 N/mm, L = 4000 mm, EI = 1.12 × 10¹³ N·mm²

Each load on its own

δP = PL³/(48EI) = 23000·4000³/(48·1.12 × 10¹³) = 2.738 mm
δw = 5wL⁴/(384EI) = 5·10·4000⁴/(384·1.12 × 10¹³) = 2.976 mm

Add them

δmax = 2.738 + 2.976 = 5.714 mm

Answer

δmax = 5.714 mm
9.Column buckling

Answer: Pcr = 16.06 kN

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Smallest second moment of area

A rectangle buckles about its weak axis, using the smaller dimension cubed.

Imin = h·b³/12 = 100·25³/12 = 130208 mm⁴

Effective length

KL = 1·4000 = 4000 mm

Critical load

Pcr = π²EI/(KL)² = π²·200000·130208/4000² = 16064 N = 16.06 kN

Answer

Pcr = 16.06 kN
10.Column buckling

Answer: σcr = 5.64 MPa

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Smallest second moment of area

A round section has the same I about every axis.

I = πd⁴/64 = π·40⁴/64 = 125664 mm⁴

Radius of gyration and slenderness

A = 1257 mm²
r = √(I/A) = √(125664/1257) = 10 mm
KL = 0.7·5000 = 3500 mm
KL/r = 3500/10 = 350

Critical stress

σcr = π²E/(KL/r)² = π²·70000/350² = 5.64 MPa

Answer

σcr = 5.64 MPa
11.Centroid & second moment of area

Answer: Ix = 265.5 × 10⁶ mm⁴

Sections with holes: treat a hole as a negative area. The centroid is ȳ = (A₁y₁ − A₂y₂)/(A₁ − A₂), with A₁, y₁ for the full plate and A₂, y₂ for the hole. For the second moment of area about the centroidal axis, use the parallel-axis theorem for each part and subtract the hole: I = (Ic1 + A₁d₁²) − (Ic2 + A₂d₂²), where d is the distance from each part's own centroid to the axis through ȳ. A rectangle has Ic = bh³/12 and a circle Ic = πd⁴/64.

Centroid

ȳ = (36000·150 − 1963·195)/(36000 − 1963) = 147.4 mm

Full plate about ȳ

120·300³/12 + 36000·2.596² = 270.2 × 10⁶ mm⁴

Hole about ȳ

π·50⁴/64 + 1963·47.6² = 4.755 × 10⁶ mm⁴

Subtract

Ix = 265.5 × 10⁶ mm⁴

Answer

Ix = 265.5 × 10⁶ mm⁴
12.Centroid & second moment of area

Answer: σtop = 39.69 MPa

Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.

Split into two rectangles

Measure every y from the bottom edge.

flange: Af = 300·25 = 7500 mm², yf = 220 + 25/2 = 232.5 mm
web: Aw = 18·220 = 3960 mm², yw = 220/2 = 110 mm

Centroid

ȳ = (Afyf + Awyw)/(Af + Aw) = (7500·232.5 + 3960·110)/11460 = 190.2 mm

Parallel-axis theorem

flange: 300·25³/12 + 7500·(232.5 − 190.2)² = 1.383 × 10⁷ mm⁴
web: 18·220³/12 + 3960·(110 − 190.2)² = 4.142 × 10⁷ mm⁴
Ix = 1.383 × 10⁷ + 4.142 × 10⁷ = 5.525 × 10⁷ mm⁴

Bending stress

The top edge is h − ȳ from the axis.

y = 245 − 190.2 = 54.83 mm
σ = M·y/I = 4 × 10⁷·54.83/5.525 × 10⁷ = 39.69 MPa

Answer

σtop = 39.69 MPa
13.Effective stress in soil

Answer: σ′ = 98.07 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Total stress

Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.

σ = γd·zw + γsat·(z − zw) = 16.5·4 + 20.5·3 = 127.5 kPa

Pore water pressure

Water pressure grows with depth below the water table.

u = γw·(z − zw) = 9.81·3 = 29.43 kPa

Effective stress

σ′ = σ − u = 127.5 − 29.43 = 98.07 kPa

Answer

σ′ = 98.07 kPa
14.Effective stress in soil

Answer: σ = 149.8 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Total stress

Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.

σ = γd·2 + γsat,sand·4 + γsat,clay·2.5
σ = 15·2 + 19·4 + 17.5·2.5 = 149.8 kPa

Answer

σ = 149.8 kPa
15.Consolidation settlement

Answer: S = 415.3 mm

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Compare with the preconsolidation pressure

σ′f = 95 + 150 = 245 kPa > 155 kPa

Settlement

Recompression up to σ′p, virgin compression beyond it.

S = 0.06·6.5/(1 + 0.6)·log₁₀(155/95) + 0.45·6.5/(1 + 0.6)·log₁₀(245/155)
S = 51.82 + 363.5 = 415.3 mm

Answer

S = 415.3 mm
16.Consolidation settlement

Answer: t = 0.2413 years

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Drainage path

Hdr = H/2 = 3.5/2 = 1.75 m

Time

t = Tv·Hdr²/cv = 0.197·1.75²/2.5 = 0.2413 years

Answer

t = 0.2413 years
17.Hydrostatic force

Answer: F = 49.05 kN

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 2 + 1/2 = 2.5 m
A = H·b = 1·2 = 2 m²
gated = 2 mH = 1 mF

Resultant force

F = ρ·g·yc·A = 1000·9.81·2.5·2 = 49.05 kN

Answer

F = 49.05 kN
18.Hydrostatic force

Answer: F = 48.56 kN

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 0.5 + 1.5/2 = 1.25 m
A = H·b = 1.5·3 = 4.5 m²
gated = 0.5 mH = 1.5 mF

Resultant force

F = ρ·g·yc·A = 880·9.81·1.25·4.5 = 48.56 kN

Answer

F = 48.56 kN
19.Pipe friction & head loss

Answer: hf = 2.507 m

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Mean velocity

A = π·0.075²/4 = 0.004418 m²
V = Q/A = 0.006/0.004418 = 1.358 m/s

Velocity head

V²/(2g) = 1.358²/(2·9.81) = 0.09401 m

Darcy–Weisbach

hf = f·(L/D)·V²/(2g) = 0.02·(100/0.075)·1.358²/(2·9.81) = 2.507 m

Answer

hf = 2.507 m
20.Pipe friction & head loss

Answer: Q = 288.4 L/s

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Loss coefficients

f·L/D = 0.015·300/0.3 = 15
ΣK = 0.5 + 2·0.3 + 10 + 1.0 = 12.1

Energy equation

Both surfaces are open to the air and practically at rest, so all of Δz is lost in the pipe.

23 = (15 + 12.1)·V²/(2·9.81)
V = √(2·9.81·23/27.1) = 4.081 m/s

Flow rate

Q = V·π·D²/4 = 4.081·0.07069 = 0.2884 m³/s = 288.4 L/s

Answer

Q = 288.4 L/s
21.Open-channel flow (Manning)

Answer: Q = 12.14 m³/s

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Geometry

A = b·y = 6·0.7 = 4.2 m²
P = b + 2y = 6 + 2·0.7 = 7.4 m
R = A/P = 0.5676 m

Velocity

V = (1/0.015)·0.56762/3·0.0041/2 = 2.89 m/s

Flow rate

Q = A·V = 4.2·2.89 = 12.14 m³/s

Answer

Q = 12.14 m³/s
22.Open-channel flow (Manning)

Answer: S = 0.006814 m/m

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Hydraulic radius

R = D/4 = 0.25/4 = 0.0625 m

Solve Manning for S

S = (n·V/R2/3)² = (0.013·1/0.1575)² = 0.006814

Answer

S = 0.006814

That is a fall of 6.814 m per kilometre.

23.Pumps & pump power

Answer: Pel = 25.96 kW

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Hydraulic power

Ph = ρ·g·Q·H = 1000·9.81·0.04·44 = 17.27 kW

Shaft power

Pshaft = 17.27/0.7 = 24.67 kW

Electrical power

Pel = 24.67/0.95 = 25.96 kW

Answer

Pel = 25.96 kW
24.Pumps & pump power

Answer: H = 33.65 m

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Velocity

V = Q/A = 0.08/0.04909 = 1.63 m/s
V²/(2g) = 0.1354 m

Head losses

hL = (f·L/D + ΣK)·V²/(2g) = (12 + 4)·0.1354 = 2.166 m

Pressure head

p/(ρ·g) = 250000/(1000·9.81) = 25.48 m

Pump head

Both surfaces are practically at rest, so there is no velocity head term.

H = Δz + p/(ρ·g) + hL = 6 + 25.48 + 2.166 = 33.65 m

Answer

H = 33.65 m
25.Time value of money

Answer: FV = 1397 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Rate and number of periods

i = r/m = 0.048/4 = 0.012
N = m·n = 4·7 = 28

Future value

FV = 1 000·(1 + 0.012)28 = 1 000·1.397 = €1 396.54

Answer

FV = €1 396.54
26.Time value of money

Answer: N = 24 payments

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Rearrange the annuity formula

i = 0.0025
(1 + i)−N = 1 − 12 000·0.0025/525 = 0.9429

Solve with logarithms

N = −ln(0.9429)/ln(1.002) = 23.57

Round up to whole payments

23 full payments leave a small balance, which the last, smaller payment clears.

N = 24

Answer

N = 24 payments
27.NPV & IRR

Answer: EAC = 10384 €

Equivalent annual cost: spread the present value of all costs over the life as an equal yearly amount (an annuity): EAC = PV·r/(1 − (1 + r)⁻ⁿ). It lets you compare machines with different lives.

Annuity factor

(1 − 1.12−9)/0.12 = 5.328

Annualised purchase price

50 000/5.328 = 9 383.94

EAC

EAC = 9 383.94 + 1 000 = €10 383.94

Answer

EAC = €10 383.94
28.NPV & IRR

Answer: NPV = −18797 €

Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.

Present value of the growing annuity

((1.03)/(1.08))10 = 0.6225
PV = 24 000/(0.08 − 0.03)·(1 − 0.6225) = 181 203.21

NPV

NPV = 181 203.21 − 200 000 = −€18 796.79

Answer

NPV = −€18 796.79

NPV is negative, so the project earns less than the required return.

29.Normal distribution

Answer: z = 2.25

From an area back to z: Φ(z) is the area to the left of z. For a left-tail area A, find z with Φ(z) = A in the table. A right-tail area A means Φ(z) = 1 − A. A central area A between −z and z leaves (1 − A)/2 in each tail, so Φ(z) = (1 + A)/2. For a value x, use x = μ + zσ.

Area to the left of z

Φ(z) = (1 + 0.9756)/2 = 0.9878

Read the z-table backwards

Find 0.9878 inside the table and read off z.

z = 2.25

Answer

z = 2.25
30.Normal distribution

Answer: x = 22.13 min

Normal distribution: convert a value x to a z-score, z = (x − μ)/σ, which counts standard deviations from the mean. A z-table (or Φ(z)) gives the area to the left of z, which is P(X < x). The area to the right is 1 − Φ(z), and the area between two values is the difference of their two areas.

z for the percentile

Φ(z) = 0.05 → z = −1.645

Back to x

x = 32 + −1.645·6 = 22.13 min

Answer

x = 22.13 min

This is independent practice material. ExamProblems is not affiliated with or endorsed by the organisation that runs this exam, and the exam name is used only to describe the content. The FE exam is run by NCEES, which is not affiliated with ExamProblems and does not endorse it.

ExamProblems · examproblems.com/courses/fe-exam-civil