1Formulas and methods

Beam support reactions

Equilibrium
ΣFx = 0, ΣFy = 0, ΣM = 0
Uniform load
resultant w·L at the middle of the load
Moment
M = F·d

Method

  1. Draw a free-body diagram and replace each support by its reactions.
  2. Replace every distributed load by a single force at its centroid.
  3. Take moments about one support to find the reaction at the other.
  4. Use ΣFy = 0 to find the remaining reaction, and check with a second moment equation.

Truss: method of joints

Method of joints
ΣFx = 0, ΣFy = 0 at each joint
Method of sections
ΣM = 0 about a cut point
Member force
positive = tension, negative = compression

Method

  1. Find the support reactions for the whole truss.
  2. Method of joints: start at a joint with at most two unknown member forces and use ΣFx = 0 and ΣFy = 0.
  3. Method of sections: cut through the member you need and take moments about a point where the other unknown members meet.
  4. Assume tension; a negative answer means compression.

Shear force & bending moment

Shear and moment
V = ΣF on one side, M = ΣF·d on one side
Bending stress
σ = M·y/I
Rectangle
I = bh³/12
Section modulus
W = I/ymax
Simply supported, uniform load
Mmax = wL²/8

Method

  1. Find the support reactions from equilibrium of the whole beam.
  2. Cut the beam at the section you need and keep one side.
  3. Shear force: sum of the vertical forces on that side. Bending moment: sum of their moments about the cut.
  4. For the maximum moment, find where the shear force is zero.

Beam deflection

Point load at midspan
δ = PL³/(48EI)
Uniform load, simply supported
δ = 5wL⁴/(384EI)
Cantilever, end load
δ = PL³/(3EI)
Cantilever, uniform load
δ = wL⁴/(8EI)
Superposition
δ = δ1 + δ2

Column buckling

Euler load
Pcr = π²EI/(KL)²
Effective length factor
K = 1 pinned–pinned, 0.5 fixed–fixed, 0.7 fixed–pinned, 2 fixed–free
Critical stress
σcr = Pcr/A
Slenderness
λ = KL/r, r = √(I/A)

Centroid & second moment of area

Centroid
ȳ = ΣAiyi/ΣAi
Rectangle
I = bh³/12
Parallel-axis theorem
I = Ic + A·d²
Composite section
I = Σ(Ic,i + Aidi²)

Effective stress in soil

Total stress
σ = Σγi·hi
Pore water pressure
u = γw·(z − zw)
Effective stress
σ′ = σ − u
Water
γw = 9.81 kN/m³

Consolidation settlement

Normally consolidated
S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0)
Final stress
σ′f = σ′0 + Δσ (at mid-depth of the layer)
Overconsolidated, σ′f ≤ σ′p
S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0)
Overconsolidated, σ′f > σ′p
S = H/(1 + e0)·[Cr·log₁₀(σ′p/σ′0) + Cc·log₁₀(σ′f/σ′p)]
Overconsolidation ratio
OCR = σ′p/σ′0
Time for consolidation
t = Tv·Hdr²/cv
Drainage path
Hdr = H/2 (double drainage), H (single drainage)
Time factors
U 50% → 0.197, 60% → 0.287, 70% → 0.403, 80% → 0.567, 90% → 0.848

Hydrostatic force

Pressure at depth
p = ρgh
Force on a vertical wall
F = ρg·hc·A
Centre of pressure
yp = yc + Ic/(ycA)
Rectangle
Ic = bH³/12

Pipe friction & head loss

Reynolds number
Re = V·D/ν = ρ·V·D/μ
Flow regime
laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)

Open-channel flow (Manning)

Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²

Pumps & pump power

Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)

Time value of money

Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i

Method

  1. Draw a timeline with every cash flow and its timing.
  2. Match the rate to the period: a monthly rate for monthly payments.
  3. Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
  4. Check the sign and the order of magnitude of the answer.

NPV & IRR

Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)

Method

  1. List all cash flows with their year; the investment at year 0 is negative.
  2. Discount each cash flow: CFt/(1 + r)t.
  3. Add them up to get the NPV. Positive means the project earns more than r.
  4. For the IRR, find the rate that makes NPV zero by trial or interpolation.

Normal distribution

z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ

Method

  1. Convert the value to a z-score: z = (x − μ)/σ.
  2. Look up Φ(z), the area to the left of z.
  3. For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
  4. For a percentile, work backwards: find z for the area, then x = μ + z·σ.

2Practice problems

1.Beam support reactionsMedium
P1​ = 65 kNP2​ = 30 kNABCRA​ = ?3 m1 m1 m

The beam has a pin at A and a roller at B, 4 m from A, and overhangs B to the free end C. Find the vertical reaction RA, taking upward as positive.

AB = 4 mAC = 5 mP1 = 65 kN at 3 mP2 = 30 kN at 5 m
RA = kN
2.Beam support reactionsHard
w = 4 kN/mP = 50 kNABRA​ = ?RB​2 m2 m2 m2 m

The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RA.

L = 8 mP = 50 kN at 6 mw = 4 kN/m from 2 to 4 m
RA = kN
3.Truss: method of jointsMedium
ABBCACACB25 kN6 m2 m3 m

Use the method of joints to find the force FAB in member AB. Give tension as positive and compression as negative.

span = 6 mheight = 3 mB is 2 m from Avertical load = 25 kN
FAB = kN
4.Truss: method of jointsHard
ABCDEFGH20 kN35 kN15 kN15 kN4 × 4 m4 m

Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.

B: 20 kN ↓F: 35 kN ↓F: 15 kN →G: 15 kN ↓
  1. 1member AB
  2. 2member BC
  3. 3member CD
  4. 4member DE
  5. 5member FG
  6. 6member GH
  7. 7member AF
  8. 8member HE
  9. 9member BF
  10. 10member CG
  11. 11member DH
  12. 12member FC
  13. 13member HC
5.Shear force & bending momentMedium
w = 3 kN/mABsection1.5 m4.5 m

Find the bending moment Mx at the section x = 1.5 m from support A. Use sagging moments positive and upward shear on the left face positive.

L = 6 mw = 3 kN/m from 0 to 6 mx = 1.5 m
Mx = kN·m
6.Shear force & bending momentHard
w = 5 kN/mP = 25 kNABsection3.5 m0.5 m2 m

Find the bending moment Mx at the section x = 3.5 m from support A. Use sagging moments positive and upward shear on the left face positive.

L = 6 mP = 25 kN at 4 mw = 5 kN/m from 0 to 6 mx = 3.5 m
Mx = kN·m
7.Beam deflectionMedium
w = 5 kN/mP = 17 kNABδ1.5 m

A cantilever carries a uniformly distributed load w over its whole length and a point load P at its free end. Using superposition, find the deflection δ at the free end.

P = 17 kNw = 5 kN/mL = 1.5 mE = 200 GPa (steel)I = 8.5 × 10⁶ mm⁴
δ = mm
8.Beam deflectionHard
w = 4 kN/mABδ4 m

A simply supported timber beam of rectangular section, 75 mm wide, carries a uniformly distributed load w over its whole span. Its midspan deflection may not exceed span/300. Find the smallest depth hreq of the section.

w = 4 kN/mL = 4 mE = 11 GPa (timber)b = 75 mm
hreq = mm
9.Column bucklingMedium
PL = 1.5 md = 60 mmcross-section

A column of length L made of aluminium is pinned at both ends. Using Euler’s formula, find its critical buckling load Pcr.

L = 1.5 mE = 70 GPa (aluminium)d = 60 mm
Pcr = kN
10.Column bucklingHard
P = 100 kNL = 2 md = ?cross-section

A solid round column of length L made of aluminium is pinned at both ends. It must carry 100 kN with a factor of safety of 2 against buckling. Find the smallest diameter d.

P = 100 kNn = 2L = 2 mE = 70 GPa (aluminium)
d = mm
11.Centroid & second moment of areaMedium
16090t = 10xdimensions in mm

A channel section lies with its open side up: a base plate 160 mm wide with two upright legs, 90 mm high overall. Base and legs are all 10 mm thick. Find its second moment of area Ix about the horizontal axis x through its centroid.

b = 160 mmh = 90 mmt = 10 mm
Ix = × 10⁶ mm⁴
12.Centroid & second moment of areaHard
1404202412xM = 200 kN·mdimensions in mm

A symmetric I-section has flanges 140 mm wide and 24 mm thick, an overall depth of 420 mm and a web 12 mm thick. It carries a bending moment of 200 kN·m about the axis x. Find the size of the maximum bending stress σmax in the section.

B = 140 mmH = 420 mmtf = 24 mmtw = 12 mmM = 200 kN·m
σmax = MPa
13.Effective stress in soilMedium
sandγd​ = 15.5 kN/m³γsat​ = 18.5 kN/m³10 mwater tableXz = 7 m

For the soil profile shown, find the pore water pressure u at point X.

z = 7 mzw = 2 mγw = 9.81 kN/m³sand: γd = 15.5 kN/m³sand: γsat = 18.5 kN/m³
u = kPa
14.Effective stress in soilHard
sandγd​ = 15 kN/m³γsat​ = 19.5 kN/m³5 mclayγsat​ = 17 kN/m³5 mwater tableXz = 7.5 m

For the soil profile shown, find the vertical effective stress σ′ at point X.

z = 7.5 mzw = 1 mγw = 9.81 kN/m³sand: γd = 15 kN/m³sand: γsat = 19.5 kN/m³clay: γsat = 17 kN/m³
σ′ = kPa
15.Consolidation settlementMedium
Δσ = 60 kPasandclayCc​ = 0.2, Cr​ = 0.05e0​ = 1σ′0​ = 70 kPaσ′p​ = 100 kPa6.5 mwater table

A 6.5 m thick overconsolidated clay layer has Cc = 0.2, Cr = 0.05 and e₀ = 1. At its mid-depth the effective vertical stress is 70 kPa and the preconsolidation pressure is 100 kPa. A new building adds 60 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.

H = 6.5 mCc = 0.2Cr = 0.05e0 = 1σ′0 = 70 kPaσ′p = 100 kPaΔσ = 60 kPa
S = mm
16.Consolidation settlementHard
sandclayH = 2 m2 msandwater table

In a laboratory oedometer test, a clay specimen 25 mm thick, drained at the top and bottom, reaches 50% consolidation in 5 min. In the field the same clay forms a layer 2 m thick. It lies between two sand layers, so water drains out at the top and the bottom. How many days t does the field layer take to reach 50% consolidation?

hlab = 25 mmtlab = 5 minH = 2 mfield: double drainage
t = days
17.Hydrostatic forceMedium
gated = 1 mH = 1 m

A vertical rectangular gate 2 m wide sits in the wall of a tank of water, with its top edge 1 m below the surface. Find the resultant hydrostatic force F on the gate.

d = 1 mH = 1 mb = 2 mρ = 1000 kg/m³g = 9.81 m/s²
F = kN
18.Hydrostatic forceHard
gated = 4 mH = 2.5 m

A vertical rectangular gate 2 m wide sits in the wall of a tank of glycerin, with its top edge 4 m below the surface. Find the depth ycp of the centre of pressure below the surface.

d = 4 mH = 2.5 mb = 2 mρ = 1260 kg/m³g = 9.81 m/s²
ycp = m
19.Pipe friction & head lossMedium
Q = 20 L/sD = 200 mmL = 150 mf = 0.028

Water flows at 20 L/s through a pipe 150 m long with an inside diameter of 200 mm. Use the Darcy friction factor f = 0.028 and g = 9.81 m/s². Find the friction head loss hf.

Q = 20 L/sL = 150 mD = 200 mmf = 0.028g = 9.81 m/s²
hf = m
20.Pipe friction & head lossHard
K = 10Δz = 32 mL = 100 m, D = 100 mm, f = 0.0184× bend (K = 0.3)

Two open reservoirs are joined by a pipe 100 m long with an inside diameter of 100 mm and a Darcy friction factor f = 0.018. The water surface of the upper reservoir is 32 m above that of the lower one. The minor losses are a square-edged entrance (K = 0.5), 4 bends (K = 0.3 each), a valve (K = 10) and the exit into the lower reservoir (K = 1.0). Use g = 9.81 m/s². Find the flow rate Q in L/s.

Δz = 32 mL = 100 mD = 100 mmf = 0.018Kentrance = 0.5Kbend = 0.3 (×4)Kvalve = 10Kexit = 1.0
Q = L/s
21.Open-channel flow (Manning)Medium
b = 1 my = 1.7 m3 : 1n = 0.014, S = 0.005

A trapezoidal unfinished concrete channel has a bottom width of 1 m and side slopes of 3:1 (horizontal:vertical). Water flows uniformly 1.7 m deep. Manning n = 0.014 and the bed slope is S = 0.005. Find the flow rate Q in m³/s.

b = 1 my = 1.7 mz = 3n = 0.014S = 0.005
Q = m³/s
22.Open-channel flow (Manning)Hard
D = 375 mmn = 0.013, V = 0.6 m/s

A concrete sewer with an inside diameter of 375 mm (Manning n = 0.013) must reach a self-cleansing velocity of 0.6 m/s when flowing just full. Find the minimum slope S (in m/m).

D = 375 mmn = 0.013V = 0.6 m/s
S = m/m
23.Pumps & pump powerMedium
PQ = 40 L/sH = 66 m

A pump with an efficiency of 72% delivers 40 L/s of water (ρ = 1000 kg/m³) against a head of 66 m. Use g = 9.81 m/s². Find the shaft power Pshaft needed, in kW.

Q = 40 L/sH = 66 mη = 72%g = 9.81 m/s²
Pshaft = kW
24.Pumps & pump powerHard
300 kPa (gauge)PQ = 20 L/sΔz = 14 mL = 100 m, D = 100 mm, f = 0.015, ΣK = 6

A pump moves 20 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 14 m higher. The pipe is 100 m long with an inside diameter of 100 mm and a Darcy friction factor f = 0.015; the minor-loss coefficients add up to ΣK = 6 (entrance and exit included). Use g = 9.81 m/s². The upper tank is closed and the air above its water is at a gauge pressure of 300 kPa. Find the head H the pump must add.

Q = 20 L/sΔz = 14 mL = 100 mD = 100 mmf = 0.015ΣK = 6ptank = 300 kPa
H = m
25.Time value of moneyMedium
years012345€2 000FV = ?

You invest €2 000 at 8% per year with continuous compounding. Find the value FV after 5 years.

PV = €2 000r = 8%t = 5
FV = €
26.Time value of moneyHard
months0123…168€150€150€150FV = ?

You save €150 at the end of every month for 14 years. The account pays 3.6% per year, compounded monthly. How much have you saved at the end? Find FV.

A = €1503.6% / 12N = 168
FV = €
27.NPV & IRRMedium
years01234−60 00019 50019 50019 50019 500

A project costs €60 000 today and returns €19 500 at the end of each year for 4 years. The cost of capital is 5%. Assume cash flows arrive evenly through each year. Find the discounted payback period DPB in years.

r = 5%CF0 = −60 000CF1 = 19 500CF2 = 19 500CF3 = 19 500CF4 = 19 500
DPB = years
28.NPV & IRRHard
years0123456−150 00030 000+2%+2%+2%+2%+2%r = 10%, NPV = ?

A project costs €150 000 today. Its cash flow is €30 000 at the end of year 1 and grows by 2% per year until the last cash flow at the end of year 6. The cost of capital is 10%. Find the net present value NPV.

C0 = €150 000CF1 = €30 000g = 2%n = 6r = 10%
NPV = €
29.Normal distributionMedium
20.336.8P = ?

The delivery times are normally distributed with mean 32 min and standard deviation 6 min. What fraction lies between 20.3 and 36.8 min? Give P as a decimal.

μ = 32σ = 6x1 = 20.3x2 = 36.8
P =
30.Normal distributionHard
10 cm0X − Y?

The heights X of men and Y of women in a group are independent and normal: X has mean 180 cm and standard deviation 10 cm, Y has mean 170 cm and standard deviation 12 cm. Find the probability P that X is greater than Y. Round z to two decimals.

μX = 180 cm, σX = 10 cmμY = 170 cm, σY = 12 cm
P =

3Solutions

1.Beam support reactions

Answer: RA = 8.75 kN

Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Replace each distributed load by its resultant (its area) acting at the centroid of the load diagram, and take moments about a support to remove that support’s reaction from the equation.

Moments about A

Counter-clockwise positive.

ΣMA = 0: RB·4 = 65·3 + 30·5
RB = 345/4 = 86.25 kN

Vertical equilibrium

RA = 65 + 30 − 86.25 = 8.75 kN

Answer

RA = 8.75 kN
2.Beam support reactions

Answer: RA = 17.5 kN

Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.

w = 4 kN/mP = 50 kNABRA​RB​2 m2 m2 m2 m

Free-body diagram

Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.

Equilibrium

Moments about A, counter-clockwise positive. Then vertical force balance.

UDL resultant: W = w·ℓ = 4·2 = 8 kN, acting at x̄ = 3 m
ΣMA = 0: RB·8 = 50·6 + 4·2·3
RB = 324/8 = 40.5 kN
ΣFy = 0: RA = 58 − 40.5 = 17.5 kN

Answer

RA = 17.5 kN
3.Truss: method of joints

Answer: FAB = −20.03 kN

Method of joints: every pin of a truss is in equilibrium, so ΣFx = 0 and ΣFy = 0 at each joint. Start at a joint with at most two unknown member forces. A negative result means the member is in compression.

ABBCACACB25 kNAy​Cy​

Support reactions

Equilibrium of the whole truss. Moments about A, counter-clockwise positive.

ΣMA = 0: Cy·6 = 25·2 → Cy = 8.333 kN
ΣFy = 0: Ay = 25 − 8.333 = 16.67 kN

Joint A

Assume every member is in tension (pulling away from the joint). Only AB has a vertical component at A.

sin α = 3/3.606 = 0.8321
ΣFy = 0: Ay + FAB·sin α = 0
FAB = −16.67/0.8321 = −20.03 kN

Answer

FAB = −20.03 kN (compression)
4.Truss: method of joints

Answer: member DH

Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.

Joint D

CD and DE lie on one straight line and the joint carries no load. Balancing forces across that line leaves only DH.

ΣF⊥ = 0 → FDH = 0

Check with the method of joints

Solving all joints gives these member forces (T = tension, C = compression).

AB: 60 kN (T), BC: 60 kN (T), CD: 25 kN (T), DE: 25 kN (T), FG: 50 kN (C), GH: 50 kN (C), AF: 63.64 kN (C), HE: 35.36 kN (C), BF: 20 kN (T), CG: 15 kN (C), DH: 0, FC: 14.14 kN (C), HC: 35.36 kN (T)

Answer

Zero-force member: DH
5.Shear force & bending moment

Answer: Mx = 10.13 kN·m

Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut.

Support reactions

Equilibrium of the whole beam.

UDL resultant: W = w·ℓ = 3·6 = 18 kN, acting at x̄ = 3 m
ΣMA = 0: RB·6 = 3·6·3
RB = 54/6 = 9 kN
ΣFy = 0: RA = 18 − 9 = 9 kN
w = 3 kN/mABRA​ = 9RB​ = 9section1.5 m4.5 m

Cut at x = 1.5 m and keep the left part

Only forces left of the cut appear. A UDL portion acts as one force at the middle of that portion.

M = RA·x − (each load left of the cut × its distance to the cut)
Mx = 9·1.5 − 3·1.5·0.75 = 10.13 kN·m

Answer

Mx = 10.13 kN·m
6.Shear force & bending moment

Answer: Mx = 51.04 kN·m

Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut.

Support reactions

Equilibrium of the whole beam.

UDL resultant: W = w·ℓ = 5·6 = 30 kN, acting at x̄ = 3 m
ΣMA = 0: RB·6 = 25·4 + 5·6·3
RB = 190/6 = 31.67 kN
ΣFy = 0: RA = 55 − 31.67 = 23.33 kN
w = 5 kN/mP = 25 kNABRA​ = 23.33RB​ = 31.67section3.5 m0.5 m2 m

Cut at x = 3.5 m and keep the left part

Only forces left of the cut appear. A UDL portion acts as one force at the middle of that portion.

M = RA·x − (each load left of the cut × its distance to the cut)
Mx = 23.33·3.5 − 5·3.5·1.75 = 51.04 kN·m

Answer

Mx = 51.04 kN·m
7.Beam deflection

Answer: δ = 13.11 mm

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).

Consistent units

Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.

P = 17000 N, w = 5 N/mm, L = 1500 mm
EI = 1.7 × 10¹² N·mm²

Each load on its own

δP = PL³/(3EI) = 17000·1500³/(3·1.7 × 10¹²) = 11.25 mm
δw = wL⁴/(8EI) = 5·1500⁴/(8·1.7 × 10¹²) = 1.861 mm

Add them

δ = 11.25 + 1.861 = 13.11 mm

Answer

δ = 13.11 mm
8.Beam deflection

Answer: hreq = 244.1 mm

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).

Consistent units

Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.

w = 4 N/mm, L = 4000 mm, E = 11000 N/mm²

Deflection limit

δallow = L/300 = 4000/300 = 13.33 mm

Required second moment of area

Ireq = 5wL⁴/(384·E·δallow) = 5·4·4000⁴/(384·11000·13.33) = 9.091 × 10⁷ mm⁴

Required depth

bh³/12 = Ireq → h = (12·9.091 × 10⁷/75)1/3 = 244.1 mm

Answer

hreq = 244.1 mm

In practice, choose the next standard depth above this value.

9.Column buckling

Answer: Pcr = 195.3 kN

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Smallest second moment of area

A round section has the same I about every axis.

I = πd⁴/64 = π·60⁴/64 = 636173 mm⁴

Effective length

KL = 1·1500 = 1500 mm

Critical load

Pcr = π²EI/(KL)² = π²·70000·636173/1500² = 195340 N = 195.3 kN

Answer

Pcr = 195.3 kN
10.Column buckling

Answer: d = 69.69 mm

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Required critical load

Pcr = n·P = 2·100000 = 200000 N
KL = 1·2000 = 2000 mm

Solve for the diameter

d = (64·n·P·(KL)²/(π³E))^(1/4) = (64·200000·2000²/(π³·70000))^(1/4) = 69.69 mm

Answer

d = 69.69 mm

Check: the slenderness KL/r is 114.8, so the column is slender and Euler applies.

11.Centroid & second moment of area

Answer: Ix = 2.487 × 10⁶ mm⁴

Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.

Split into rectangles

Take the base at full width and the two legs above it (height h − t), so nothing is counted twice.

base: A1 = 160·10 = 1600 mm², y1 = 5 mm
two legs: A2 = 2·10·80 = 1600 mm², y2 = 10 + 80/2 = 50 mm

Centroid

ȳ = (1600·5 + 1600·50)/3200 = 27.5 mm

Parallel-axis theorem

base: 160·10³/12 + 1600·(5 − 27.5)² = 823333 mm⁴
two legs: 2·10·80³/12 + 1600·(50 − 27.5)² = 1.663 × 10⁶ mm⁴
Ix = 823333 + 1.663 × 10⁶
Ix = 2.487 × 10⁶ mm⁴ = 2.487 × 10⁶ mm⁴

Answer

Ix = 2.487 × 10⁶ mm⁴
12.Centroid & second moment of area

Answer: σmax = 133.2 MPa

Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.

Outer rectangle minus the two side cut-outs

Both cut-outs together are (B − tw) wide and hw = H − 2tf high, and share the axis x.

hw = 420 − 2·24 = 372 mm
Ix = (B·H³ − (B − tw)·hw³)/12 = (140·420³ − 128·372³)/12
Ix = 3.153 × 10⁸ mm⁴

Bending stress

y = 210 mm
σ = M·y/I = 2 × 10⁸·210/3.153 × 10⁸ = 133.2 MPa

Answer

σmax = 133.2 MPa
13.Effective stress in soil

Answer: u = 49.05 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Pore water pressure

Water pressure grows with depth below the water table.

u = γw·(z − zw) = 9.81·5 = 49.05 kPa

Answer

u = 49.05 kPa
14.Effective stress in soil

Answer: σ′ = 71.73 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Total stress

Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.

σ = γd·1 + γsat,sand·4 + γsat,clay·2.5
σ = 15·1 + 19.5·4 + 17·2.5 = 135.5 kPa

Pore water pressure

Water pressure grows with depth below the water table.

u = γw·(z − zw) = 9.81·6.5 = 63.77 kPa

Effective stress

σ′ = σ − u = 135.5 − 63.77 = 71.73 kPa

Answer

σ′ = 71.73 kPa
15.Consolidation settlement

Answer: S = 99.23 mm

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Compare with the preconsolidation pressure

σ′f = 70 + 60 = 130 kPa > 100 kPa

Settlement

Recompression up to σ′p, virgin compression beyond it.

S = 0.05·6.5/(1 + 1)·log₁₀(100/70) + 0.2·6.5/(1 + 1)·log₁₀(130/100)
S = 25.17 + 74.06 = 99.23 mm

Answer

S = 99.23 mm
16.Consolidation settlement

Answer: t = 22.22 days

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Drainage paths

Hdr,lab = 25/2 = 12.5 mm = 0.0125 m
Hdr,field = 2/2 = 1 m

Scale the time

t = Tv·Hdr²/cv with the same T_v and cv in the lab and the field.

tfield = 5·(1/0.0125)² = 32000 min
tfield = 32000/1440 = 22.22 days

Answer

t = 22.22 days
17.Hydrostatic force

Answer: F = 29.43 kN

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 1 + 1/2 = 1.5 m
A = H·b = 1·2 = 2 m²
gated = 1 mH = 1 mF

Resultant force

F = ρ·g·yc·A = 1000·9.81·1.5·2 = 29.43 kN

Answer

F = 29.43 kN
18.Hydrostatic force

Answer: ycp = 5.349 m

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 4 + 2.5/2 = 5.25 m
A = H·b = 2.5·2 = 5 m²
gated = 4 mH = 2.5 mF

Resultant force

F = ρ·g·yc·A = 1260·9.81·5.25·5 = 324.5 kN

Centre of pressure

Pressure grows with depth, so the resultant acts below the centroid.

Ic = b·H³/12 = 2·2.5³/12 = 2.604 m⁴
ycp = yc + Ic/(yc·A) = 5.25 + 2.604/(5.25·5) = 5.349 m

Answer

ycp = 5.349 m
19.Pipe friction & head loss

Answer: hf = 0.4338 m

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Mean velocity

A = π·0.2²/4 = 0.03142 m²
V = Q/A = 0.02/0.03142 = 0.6366 m/s

Velocity head

V²/(2g) = 0.6366²/(2·9.81) = 0.02066 m

Darcy–Weisbach

hf = f·(L/D)·V²/(2g) = 0.028·(150/0.2)·0.6366²/(2·9.81) = 0.4338 m

Answer

hf = 0.4338 m
20.Pipe friction & head loss

Answer: Q = 35.52 L/s

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Loss coefficients

f·L/D = 0.018·100/0.1 = 18
ΣK = 0.5 + 4·0.3 + 10 + 1.0 = 12.7

Energy equation

Both surfaces are open to the air and practically at rest, so all of Δz is lost in the pipe.

32 = (18 + 12.7)·V²/(2·9.81)
V = √(2·9.81·32/30.7) = 4.522 m/s

Flow rate

Q = V·π·D²/4 = 4.522·0.007854 = 0.03552 m³/s = 35.52 L/s

Answer

Q = 35.52 L/s
21.Open-channel flow (Manning)

Answer: Q = 48.19 m³/s

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Geometry

A = (b + z·y)·y = (1 + 3·1.7)·1.7 = 10.37 m²
P = b + 2y·√(1 + z²) = 1 + 2·1.7·√(1 + 3²) = 11.75 m
R = A/P = 0.8824 m

Velocity

V = (1/0.014)·0.88242/3·0.0051/2 = 4.647 m/s

Flow rate

Q = A·V = 10.37·4.647 = 48.19 m³/s

Answer

Q = 48.19 m³/s
22.Open-channel flow (Manning)

Answer: S = 0.001429 m/m

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Hydraulic radius

R = D/4 = 0.375/4 = 0.09375 m

Solve Manning for S

S = (n·V/R2/3)² = (0.013·0.6/0.2064)² = 0.001429

Answer

S = 0.001429

That is a fall of 1.429 m per kilometre.

23.Pumps & pump power

Answer: Pshaft = 35.97 kW

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Hydraulic power

Ph = ρ·g·Q·H = 1000·9.81·0.04·66 = 25.9 kW

Shaft power

Pshaft = Ph/η = 25.9/0.72 = 35.97 kW

Answer

Pshaft = 35.97 kW
24.Pumps & pump power

Answer: H = 51.52 m

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Velocity

V = Q/A = 0.02/0.007854 = 2.546 m/s
V²/(2g) = 0.3305 m

Head losses

hL = (f·L/D + ΣK)·V²/(2g) = (15 + 6)·0.3305 = 6.941 m

Pressure head

p/(ρ·g) = 300000/(1000·9.81) = 30.58 m

Pump head

Both surfaces are practically at rest, so there is no velocity head term.

H = Δz + p/(ρ·g) + hL = 14 + 30.58 + 6.941 = 51.52 m

Answer

H = 51.52 m
25.Time value of money

Answer: FV = 2984 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Exponent

r·t = 0.08·5 = 0.4
e0.4 = 1.492

Future value

FV = 2 000·1.492 = €2 983.65

Answer

FV = €2 983.65
26.Time value of money

Answer: FV = 32704 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Monthly rate and number of deposits

i = 0.036000000000000004/12 = 0.003
N = 12·14 = 168

Future value of the deposits

FV = A·((1 + i)N − 1)/i = 150·(1.654 − 1)/0.003 = €32 704.05

Answer

FV = €32 704.05

You paid in €25 200 yourself; the rest is interest.

27.NPV & IRR

Answer: DPB = 3.43 years

Payback period: the time until the cumulative cash flows repay the initial investment. Cash is assumed to come in evenly during each year, so the last part is a fraction of a year. The simple payback ignores the time value of money; the discounted payback period uses the discounted cash flows instead.

Discounted and cumulative cash flows

year 1: 19 500/1.05 = 18 571.43 → Σ = 18 571.43
year 2: 19 500/1.103 = 17 687.07 → Σ = 36 258.50
year 3: 19 500/1.158 = 16 844.83 → Σ = 53 103.34
year 4: 19 500/1.216 = 16 042.70 → Σ = 69 146.03

Fraction of the last year

DPB = 3 + 6 896.66/16 042.70 = 3.43

Answer

DPB = 3.43 years

The discounted payback is always longer than the simple payback (3.077 years).

28.NPV & IRR

Answer: NPV = −13383 €

Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.

Present value of the growing annuity

((1.02)/(1.1))6 = 0.6357
PV = 30 000/(0.1 − 0.02)·(1 − 0.6357) = 136 616.50

NPV

NPV = 136 616.50 − 150 000 = −€13 383.50

Answer

NPV = −€13 383.50

NPV is negative, so the project earns less than the required return.

29.Normal distribution

Answer: P = 0.7626

Normal distribution: convert a value x to a z-score, z = (x − μ)/σ, which counts standard deviations from the mean. A z-table (or Φ(z)) gives the area to the left of z, which is P(X < x). The area to the right is 1 − Φ(z), and the area between two values is the difference of their two areas.

z-scores

z₁ = (20.3 − 32)/6 = −1.95
z₂ = (36.8 − 32)/6 = 0.8

Area between

P = Φ(0.8) − Φ(−1.95) = 0.7881 − 0.02559 = 0.7626

Answer

P = 0.7626
30.Normal distribution

Answer: P = 0.7389

Sums and differences of normal variables: if X and Y are independent and normal, X + Y and X − Y are normal too. Means add or subtract: E(X ± Y) = μX ± μY. Variances always add, also for a difference: Var(X ± Y) = σX² + σY², so σ = √(σX² + σY²). Standard deviations never add directly. The total of n independent items with the same distribution has mean n·μ and standard deviation σ·√n. Then standardise as usual: z = (x − mean)/σ and read Φ(z).

Distribution of the difference

μ = 180 − 170 = 10 cm, σ = 15.62 cm

Standardise

z = (0 − 10)/15.62 = −0.64

Probability

P = 1 − Φ(−0.64) = 0.7389

Answer

P = 0.7389