1Formulas and methods

Beam support reactions

Equilibrium
ΣFx = 0, ΣFy = 0, ΣM = 0
Uniform load
resultant w·L at the middle of the load
Moment
M = F·d

Method

  1. Draw a free-body diagram and replace each support by its reactions.
  2. Replace every distributed load by a single force at its centroid.
  3. Take moments about one support to find the reaction at the other.
  4. Use ΣFy = 0 to find the remaining reaction, and check with a second moment equation.

Truss: method of joints

Method of joints
ΣFx = 0, ΣFy = 0 at each joint
Method of sections
ΣM = 0 about a cut point
Member force
positive = tension, negative = compression

Method

  1. Find the support reactions for the whole truss.
  2. Method of joints: start at a joint with at most two unknown member forces and use ΣFx = 0 and ΣFy = 0.
  3. Method of sections: cut through the member you need and take moments about a point where the other unknown members meet.
  4. Assume tension; a negative answer means compression.

Shear force & bending moment

Shear and moment
V = ΣF on one side, M = ΣF·d on one side
Bending stress
σ = M·y/I
Rectangle
I = bh³/12
Section modulus
W = I/ymax
Simply supported, uniform load
Mmax = wL²/8

Method

  1. Find the support reactions from equilibrium of the whole beam.
  2. Cut the beam at the section you need and keep one side.
  3. Shear force: sum of the vertical forces on that side. Bending moment: sum of their moments about the cut.
  4. For the maximum moment, find where the shear force is zero.

Beam deflection

Point load at midspan
δ = PL³/(48EI)
Uniform load, simply supported
δ = 5wL⁴/(384EI)
Cantilever, end load
δ = PL³/(3EI)
Cantilever, uniform load
δ = wL⁴/(8EI)
Superposition
δ = δ1 + δ2

Column buckling

Euler load
Pcr = π²EI/(KL)²
Effective length factor
K = 1 pinned–pinned, 0.5 fixed–fixed, 0.7 fixed–pinned, 2 fixed–free
Critical stress
σcr = Pcr/A
Slenderness
λ = KL/r, r = √(I/A)

Centroid & second moment of area

Centroid
ȳ = ΣAiyi/ΣAi
Rectangle
I = bh³/12
Parallel-axis theorem
I = Ic + A·d²
Composite section
I = Σ(Ic,i + Aidi²)

Effective stress in soil

Total stress
σ = Σγi·hi
Pore water pressure
u = γw·(z − zw)
Effective stress
σ′ = σ − u
Water
γw = 9.81 kN/m³

Consolidation settlement

Normally consolidated
S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0)
Final stress
σ′f = σ′0 + Δσ (at mid-depth of the layer)
Overconsolidated, σ′f ≤ σ′p
S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0)
Overconsolidated, σ′f > σ′p
S = H/(1 + e0)·[Cr·log₁₀(σ′p/σ′0) + Cc·log₁₀(σ′f/σ′p)]
Overconsolidation ratio
OCR = σ′p/σ′0
Time for consolidation
t = Tv·Hdr²/cv
Drainage path
Hdr = H/2 (double drainage), H (single drainage)
Time factors
U 50% → 0.197, 60% → 0.287, 70% → 0.403, 80% → 0.567, 90% → 0.848

Hydrostatic force

Pressure at depth
p = ρgh
Force on a vertical wall
F = ρg·hc·A
Centre of pressure
yp = yc + Ic/(ycA)
Rectangle
Ic = bH³/12

Pipe friction & head loss

Reynolds number
Re = V·D/ν = ρ·V·D/μ
Flow regime
laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)

Open-channel flow (Manning)

Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²

Pumps & pump power

Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)

Time value of money

Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i

Method

  1. Draw a timeline with every cash flow and its timing.
  2. Match the rate to the period: a monthly rate for monthly payments.
  3. Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
  4. Check the sign and the order of magnitude of the answer.

NPV & IRR

Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)

Method

  1. List all cash flows with their year; the investment at year 0 is negative.
  2. Discount each cash flow: CFt/(1 + r)t.
  3. Add them up to get the NPV. Positive means the project earns more than r.
  4. For the IRR, find the rate that makes NPV zero by trial or interpolation.

Normal distribution

z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ

Method

  1. Convert the value to a z-score: z = (x − μ)/σ.
  2. Look up Φ(z), the area to the left of z.
  3. For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
  4. For a percentile, work backwards: find z for the area, then x = μ + z·σ.

2Practice problems

1.Beam support reactionsMedium
w0​ = 8 kN/mABRB​ = ?5 m

The simply supported beam (pin at A, roller at B) carries a linearly varying load that falls from 8 kN/m at A to zero at B. Find the vertical support reaction RB.

L = 5 mw0 = 8 kN/m
RB = kN
2.Beam support reactionsHard
w = 8 kN/mP = 40 kNABRA​ = ?RB​3 m1 m1 m1 m

The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RA.

L = 6 mP = 40 kN at 3 mw = 8 kN/m from 4 to 5 m
RA = kN
3.Truss: method of jointsMedium
ABCDEFGH30 kN4 × 3 m3 m

Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.

F: 30 kN ↓
  1. 1member AB
  2. 2member BC
  3. 3member CD
  4. 4member DE
  5. 5member FG
  6. 6member GH
  7. 7member AF
  8. 8member HE
  9. 9member BF
  10. 10member CG
  11. 11member DH
  12. 12member BG
  13. 13member DG
4.Truss: method of jointsHard
ABCDEFGH20 kN40 kN40 kN4 × 3 m4 m

Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.

B: 20 kN ↓D: 40 kN ↓H: 40 kN ←
  1. 1member AB
  2. 2member BC
  3. 3member CD
  4. 4member DE
  5. 5member FG
  6. 6member GH
  7. 7member AF
  8. 8member HE
  9. 9member BF
  10. 10member CG
  11. 11member DH
  12. 12member FC
  13. 13member HC
5.Shear force & bending momentMedium
w = 2 kN/mABsection7 m1 m

Find the shear force Vx at the section x = 7 m from support A. Use sagging moments positive and upward shear on the left face positive.

L = 8 mw = 2 kN/m from 0 to 8 mx = 7 m
Vx = kN
6.Shear force & bending momentHard
25 kN20 kN25 kNABCDEFG1 m1 m1 m1 m1 m1 m

The marks A to G split the beam into six equal parts. At which mark is the bending moment largest in size, sagging or hogging? Click it in the diagram.

25 kN @ 0 m20 kN @ 6 m25 kN @ 3 m
  1. 1A (x = 0 m)
  2. 2B (x = 1 m)
  3. 3C (x = 2 m)
  4. 4D (x = 3 m)
  5. 5E (x = 4 m)
  6. 6F (x = 5 m)
  7. 7G (x = 6 m)
7.Beam deflectionMedium
w = 8 kN/mABθ6 m

A simply supported beam carries a uniformly distributed load w over its whole span. Find the slope θA of the beam at support A, in radians.

w = 8 kN/mL = 6 mE = 70 GPa (aluminium)I = 36 × 10⁶ mm⁴
θA = rad
8.Beam deflectionHard
w = 2.5 kN/mABδ5 m

A simply supported timber beam of rectangular section, 125 mm wide, carries a uniformly distributed load w over its whole span. Its midspan deflection may not exceed span/250. Find the smallest depth hreq of the section.

w = 2.5 kN/mL = 5 mE = 11 GPa (timber)b = 125 mm
hreq = mm
9.Column bucklingMedium
PL = 5 md = 60 mmcross-section

A column of length L made of steel is fixed at the base and free at the top. Using Euler’s formula, find its critical buckling load Pcr.

L = 5 mE = 200 GPa (steel)d = 60 mm
Pcr = kN
10.Column bucklingHard
PL = 2.5 md = 25 mmcross-section

A column of length L made of steel is fixed at both ends. Find its slenderness and the critical buckling stress σcr from Euler’s formula.

L = 2.5 mE = 200 GPa (steel)d = 25 mm
σcr = MPa
11.Centroid & second moment of areaMedium
200 mm150 mm45 mmØ30xIx​ = ?

A 200 mm × 150 mm plate has a circular hole of diameter 30 mm on its vertical centre line, with its centre 45 mm above the bottom. Find the second moment of area Ix about the horizontal axis through the centroid.

b = 200 mmh = 150 mmd = 30 mmhole centre: y = 45 mm
Ix = × 10⁶ mm⁴
12.Centroid & second moment of areaHard
1003601214xM = 100 kN·mdimensions in mm

A symmetric I-section has flanges 100 mm wide and 12 mm thick, an overall depth of 360 mm and a web 14 mm thick. It carries a bending moment of 100 kN·m about the axis x. Find the size of the bending stress σj at the junction of the web and the top flange.

B = 100 mmH = 360 mmtf = 12 mmtw = 14 mmM = 100 kN·m
σj = MPa
13.Effective stress in soilMedium
sandγd​ = 16.5 kN/m³γsat​ = 20.5 kN/m³13 mwater tableXz = 12 m

For the soil profile shown, find the vertical effective stress σ′ at point X.

z = 12 mzw = 1 mγw = 9.81 kN/m³sand: γd = 16.5 kN/m³sand: γsat = 20.5 kN/m³
σ′ = kPa
14.Effective stress in soilHard
sandγd​ = 15.5 kN/m³γsat​ = 20 kN/m³3 mclayγsat​ = 18 kN/m³6 mwater tableXz = 6 m

For the soil profile shown, find the vertical effective stress σ′ at point X.

z = 6 mzw = 2 mγw = 9.81 kN/m³sand: γd = 15.5 kN/m³sand: γsat = 20 kN/m³clay: γsat = 18 kN/m³
σ′ = kPa
15.Consolidation settlementMedium
Δσ = 170 kPasandclayCc​ = 0.2, Cr​ = 0.02e0​ = 0.65σ′0​ = 75 kPaOCR = 2.52.5 mwater table

A 2.5 m thick overconsolidated clay layer has Cc = 0.2, Cr = 0.02 and e₀ = 0.65. At its mid-depth the effective vertical stress is 75 kPa and the overconsolidation ratio is OCR = 2.5. A new building adds 170 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.

H = 2.5 mCc = 0.2Cr = 0.02e0 = 0.65σ′0 = 75 kPaOCR = 2.5Δσ = 170 kPa
S = mm
16.Consolidation settlementHard
sandclayH = 7 mcv​ = 0.8 m²/year7 mimpervious rockwater table

A clay layer 7 m thick has a coefficient of consolidation cv = 0.8 m²/year. It lies on impervious rock, with sand above it, so water drains out only at the top. For 90% average consolidation the time factor is Tv = 0.848. How many years t does the layer take to reach 90% consolidation?

H = 7 mcv = 0.8 m²/yearU = 90%Tv = 0.848single drainage
t = years
17.Hydrostatic forceMedium
gated = 2 mH = 3 m

A vertical rectangular gate 1.5 m wide sits in the wall of a tank of water, with its top edge 2 m below the surface. Find the resultant hydrostatic force F on the gate.

d = 2 mH = 3 mb = 1.5 mρ = 1000 kg/m³g = 9.81 m/s²
F = kN
18.Hydrostatic forceHard
gated = 1.5 mH = 2 m

A vertical rectangular gate 3 m wide sits in the wall of a tank of seawater, with its top edge 1.5 m below the surface. Find the depth ycp of the centre of pressure below the surface.

d = 1.5 mH = 2 mb = 3 mρ = 1025 kg/m³g = 9.81 m/s²
ycp = m
19.Pipe friction & head lossMedium
V = 1.7 m/sD = 50 mmL = 400 mf = 0.015

Water (ρ = 1000 kg/m³) flows at 1.7 m/s through a horizontal pipe, 400 m long, with an inside diameter of 50 mm. Use the Darcy friction factor f = 0.015 and g = 9.81 m/s². Find the pressure drop Δp over the pipe in kPa.

V = 1.7 m/sL = 400 mD = 50 mmf = 0.015ρ = 1000 kg/m³
Δp = kPa
20.Pipe friction & head lossHard
K = 2free outletH = ?L = 150 m, D = 300 mm, f = 0.0183× bend (K = 0.3)

A pipe 150 m long with an inside diameter of 300 mm (Darcy friction factor f = 0.018) runs from an open reservoir and discharges as a free jet into the air. The minor losses are a square-edged entrance (K = 0.5), 3 bends (K = 0.3 each) and a valve (K = 2). Use g = 9.81 m/s². How far H must the reservoir surface be above the pipe outlet for a flow rate of 100 L/s?

Q = 100 L/sL = 150 mD = 300 mmf = 0.018Kentrance = 0.5Kbend = 0.3 (×3)Kvalve = 2
H = m
21.Open-channel flow (Manning)Medium
D = 900 mmn = 0.013, S = 0.0005

A concrete storm sewer with an inside diameter of 900 mm flows half full. Manning n = 0.013 and the slope is S = 0.0005. Find the flow rate Q in m³/s.

D = 900 mmn = 0.013S = 0.0005
Q = m³/s
22.Open-channel flow (Manning)Hard
D = 250 mmn = 0.013, V = 0.75 m/s

A concrete sewer with an inside diameter of 250 mm (Manning n = 0.013) must reach a self-cleansing velocity of 0.75 m/s when flowing just full. Find the minimum slope S (in m/m).

D = 250 mmn = 0.013V = 0.75 m/s
S = m/m
23.Pumps & pump powerMedium
PQ = 40 L/sH = 18 m

A pump with an efficiency of 78% delivers 40 L/s of water (ρ = 1000 kg/m³) against a head of 18 m. Use g = 9.81 m/s². Find the shaft power Pshaft needed, in kW.

Q = 40 L/sH = 18 mη = 78%g = 9.81 m/s²
Pshaft = kW
24.Pumps & pump powerHard
300 kPa (gauge)PQ = 10 L/sΔz = 5 mL = 100 m, D = 100 mm, f = 0.022, ΣK = 6

A pump moves 10 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 5 m higher. The pipe is 100 m long with an inside diameter of 100 mm and a Darcy friction factor f = 0.022; the minor-loss coefficients add up to ΣK = 6 (entrance and exit included). Use g = 9.81 m/s². The upper tank is closed and the air above its water is at a gauge pressure of 300 kPa. Find the head H the pump must add.

Q = 10 L/sΔz = 5 mL = 100 mD = 100 mmf = 0.022ΣK = 6ptank = 300 kPa
H = m
25.Time value of moneyMedium
years0123PV = ?€5 000

You need €5 000 in 3 years. An account pays 3% per year, compounded quarterly. How much must you deposit today? Find the present value PV.

FV = €5 0003% / 4n = 3
PV = €
26.Time value of moneyHard
years0123…10€2 000€2 000€2 000FV = ?

You deposit €2 000 at the start of every year for 10 years, the first deposit today. The account pays 4% per year. How much is in the account at the end of year 10? Find FV.

A = €2 000i = 4%n = 10
FV = €
27.NPV & IRRMedium
years0123−45 00013 00017 00017 000

An investment of €45 000 gives these cash flows at the end of years 1 to 3: €13 000, €17 000, €17 000. The cost of capital is 15%. Find the net present value NPV.

r = 15%CF0 = −45 000CF1 = 13 000CF2 = 17 000CF3 = 17 000
NPV = €
28.NPV & IRRHard
r (%)NPVABr* = ?0

Project A costs €40 000 and returns €23 000, €16 000, €9 000 at the end of years 1 to 3. Project B costs €42 000 and returns €12 000, €18 500, €21 500. Find the crossover rate r* at which both projects have the same NPV, in percent.

A: −40 000, 23 000, 16 000, 9 000B: −42 000, 12 000, 18 500, 21 500
r* = %
29.Normal distributionMedium
55.567.5P = ?

The exam scores are normally distributed with mean 65 points and standard deviation 10 points. What fraction lies between 55.5 and 67.5 points? Give P as a decimal.

μ = 65σ = 10x1 = 55.5x2 = 67.5
P =
30.Normal distributionHard
μ = 100x = ?25%

The IQ scores are normally distributed with mean 100 points and standard deviation 15 points. Find the value x below which 25% of them lie (the 25th percentile).

μ = 100σ = 15P = 25%
x = points

3Solutions

1.Beam support reactions

Answer: RB = 6.667 kN

Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Replace each distributed load by its resultant (its area) acting at the centroid of the load diagram, and take moments about a support to remove that support’s reaction from the equation.

Resultant of the triangular load

W = ½·8·5 = 20 kN
x̄ = L/3 = 1.667 m

Equilibrium

Moments about A, counter-clockwise positive. Then vertical force balance.

ΣMA = 0: RB·5 = 20·1.667
RB = 6.667 kN
RA = 20 − 6.667 = 13.33 kN

Answer

RB = 6.667 kN
2.Beam support reactions

Answer: RA = 22 kN

Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.

w = 8 kN/mP = 40 kNABRA​RB​3 m1 m1 m1 m

Free-body diagram

Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.

Equilibrium

Moments about A, counter-clockwise positive. Then vertical force balance.

UDL resultant: W = w·ℓ = 8·1 = 8 kN, acting at x̄ = 4.5 m
ΣMA = 0: RB·6 = 40·3 + 8·1·4.5
RB = 156/6 = 26 kN
ΣFy = 0: RA = 48 − 26 = 22 kN

Answer

RA = 22 kN
3.Truss: method of joints

Answer: member CG

Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.

Joint C

BC and CD lie on one straight line and the joint carries no load. Balancing forces across that line leaves only CG.

ΣF⊥ = 0 → FCG = 0

Check with the method of joints

Solving all joints gives these member forces (T = tension, C = compression).

AB: 22.5 kN (T), BC: 15 kN (T), CD: 15 kN (T), DE: 7.5 kN (T), FG: 22.5 kN (C), GH: 7.5 kN (C), AF: 31.82 kN (C), HE: 10.61 kN (C), BF: 7.5 kN (C), CG: 0, DH: 7.5 kN (T), BG: 10.61 kN (T), DG: 10.61 kN (C)

Answer

Zero-force member: CG
4.Truss: method of joints

Answer: member CG

Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.

Joint G

FG and GH lie on one straight line and the joint carries no load. Balancing forces across that line leaves only CG.

ΣF⊥ = 0 → FCG = 0

Check with the method of joints

Solving all joints gives these member forces (T = tension, C = compression).

AB: 11.25 kN (C), BC: 11.25 kN (C), CD: 16.25 kN (T), DE: 16.25 kN (T), FG: 42.5 kN (C), GH: 42.5 kN (C), AF: 47.92 kN (C), HE: 27.08 kN (C), BF: 20 kN (T), CG: 0, DH: 40 kN (T), FC: 22.92 kN (T), HC: 22.92 kN (C)

Answer

Zero-force member: CG
5.Shear force & bending moment

Answer: Vx = −6 kN

Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut.

Support reactions

Equilibrium of the whole beam.

UDL resultant: W = w·ℓ = 2·8 = 16 kN, acting at x̄ = 4 m
ΣMA = 0: RB·8 = 2·8·4
RB = 64/8 = 8 kN
ΣFy = 0: RA = 16 − 8 = 8 kN
w = 2 kN/mABRA​ = 8RB​ = 8section7 m1 m

Cut at x = 7 m and keep the left part

Only forces left of the cut appear. A UDL portion acts as one force at the middle of that portion.

V = RA − (all downward loads left of the cut)
Vx = 8 − 2·7 = −6 kN

Answer

Vx = −6 kN
6.Shear force & bending moment

Answer: E (x = 4 m)

Largest bending moment: M changes slope wherever the shear force changes, so its peaks sit where the shear force crosses zero: under a point load, inside a distributed load, or over a support of an overhang. At a fixed support of a cantilever the moment is largest at the wall. Compare the size of M at those places, sagging or hogging.

Support reactions

Take moments about one support, then use the vertical force balance.

R1 = 28.33 kN, R2 = 41.67 kN

Bending moment at every mark

Sum the moments of all forces on one side of the cut. Sagging is positive, hogging negative.

MA = 0, MB = −25, MC = −21.67, MD = −18.33, ME = −40 kN·m, MF = −20, MG = 0

Answer

Mark E: ME = −40 kN·m
7.Beam deflection

Answer: θA = 0.02857 rad

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition). The slope θ = dv/dx is the first integral of M/(EI); in consistent units it comes out in radians.

Consistent units

Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.

w = 8 N/mm, L = 6000 mm
EI = 2.52 × 10¹² N·mm²

End slope

θA = wL³/(24EI) = 8·6000³/(24·2.52 × 10¹²) = 0.02857 rad

Answer

θA = 0.02857 rad

That is 1.637°.

8.Beam deflection

Answer: hreq = 207.1 mm

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).

Consistent units

Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.

w = 2.5 N/mm, L = 5000 mm, E = 11000 N/mm²

Deflection limit

δallow = L/250 = 5000/250 = 20 mm

Required second moment of area

Ireq = 5wL⁴/(384·E·δallow) = 5·2.5·5000⁴/(384·11000·20) = 9.248 × 10⁷ mm⁴

Required depth

bh³/12 = Ireq → h = (12·9.248 × 10⁷/125)1/3 = 207.1 mm

Answer

hreq = 207.1 mm

In practice, choose the next standard depth above this value.

9.Column buckling

Answer: Pcr = 12.56 kN

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Smallest second moment of area

A round section has the same I about every axis.

I = πd⁴/64 = π·60⁴/64 = 636173 mm⁴

Effective length

KL = 2·5000 = 10000 mm

Critical load

Pcr = π²EI/(KL)² = π²·200000·636173/10000² = 12558 N = 12.56 kN

Answer

Pcr = 12.56 kN
10.Column buckling

Answer: σcr = 49.35 MPa

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Smallest second moment of area

A round section has the same I about every axis.

I = πd⁴/64 = π·25⁴/64 = 19175 mm⁴

Radius of gyration and slenderness

A = 490.9 mm²
r = √(I/A) = √(19175/490.9) = 6.25 mm
KL = 0.5·2500 = 1250 mm
KL/r = 1250/6.25 = 200

Critical stress

σcr = π²E/(KL/r)² = π²·200000/200² = 49.35 MPa

Answer

σcr = 49.35 MPa
11.Centroid & second moment of area

Answer: Ix = 55.56 × 10⁶ mm⁴

Sections with holes: treat a hole as a negative area. The centroid is ȳ = (A₁y₁ − A₂y₂)/(A₁ − A₂), with A₁, y₁ for the full plate and A₂, y₂ for the hole. For the second moment of area about the centroidal axis, use the parallel-axis theorem for each part and subtract the hole: I = (Ic1 + A₁d₁²) − (Ic2 + A₂d₂²), where d is the distance from each part's own centroid to the axis through ȳ. A rectangle has Ic = bh³/12 and a circle Ic = πd⁴/64.

Centroid

ȳ = (30000·75 − 706.9·45)/(30000 − 706.9) = 75.72 mm

Full plate about ȳ

200·150³/12 + 30000·−0.7239² = 56.27 × 10⁶ mm⁴

Hole about ȳ

π·30⁴/64 + 706.9·−30.72² = 0.707 × 10⁶ mm⁴

Subtract

Ix = 55.56 × 10⁶ mm⁴

Answer

Ix = 55.56 × 10⁶ mm⁴
12.Centroid & second moment of area

Answer: σj = 143.7 MPa

Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.

Outer rectangle minus the two side cut-outs

Both cut-outs together are (B − tw) wide and hw = H − 2tf high, and share the axis x.

hw = 360 − 2·12 = 336 mm
Ix = (B·H³ − (B − tw)·hw³)/12 = (100·360³ − 86·336³)/12
Ix = 1.169 × 10⁸ mm⁴

Bending stress

y = 180 − 12 = 168 mm
σ = M·y/I = 1 × 10⁸·168/1.169 × 10⁸ = 143.7 MPa

Answer

σj = 143.7 MPa
13.Effective stress in soil

Answer: σ′ = 134.1 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Total stress

Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.

σ = γd·zw + γsat·(z − zw) = 16.5·1 + 20.5·11 = 242 kPa

Pore water pressure

Water pressure grows with depth below the water table.

u = γw·(z − zw) = 9.81·11 = 107.9 kPa

Effective stress

σ′ = σ − u = 242 − 107.9 = 134.1 kPa

Answer

σ′ = 134.1 kPa
14.Effective stress in soil

Answer: σ′ = 65.76 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Total stress

Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.

σ = γd·2 + γsat,sand·1 + γsat,clay·3
σ = 15.5·2 + 20·1 + 18·3 = 105 kPa

Pore water pressure

Water pressure grows with depth below the water table.

u = γw·(z − zw) = 9.81·4 = 39.24 kPa

Effective stress

σ′ = σ − u = 105 − 39.24 = 65.76 kPa

Answer

σ′ = 65.76 kPa
15.Consolidation settlement

Answer: S = 47.26 mm

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Preconsolidation pressure

σ′p = OCR·σ′0 = 2.5·75 = 187.5 kPa

Compare with the preconsolidation pressure

σ′f = 75 + 170 = 245 kPa > 187.5 kPa

Settlement

Recompression up to σ′p, virgin compression beyond it.

S = 0.02·2.5/(1 + 0.65)·log₁₀(187.5/75) + 0.2·2.5/(1 + 0.65)·log₁₀(245/187.5)
S = 12.06 + 35.2 = 47.26 mm

Answer

S = 47.26 mm
16.Consolidation settlement

Answer: t = 51.94 years

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Drainage path

Hdr = H = 7 m

Time

t = Tv·Hdr²/cv = 0.848·7²/0.8 = 51.94 years

Answer

t = 51.94 years
17.Hydrostatic force

Answer: F = 154.5 kN

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 2 + 3/2 = 3.5 m
A = H·b = 3·1.5 = 4.5 m²
gated = 2 mH = 3 mF

Resultant force

F = ρ·g·yc·A = 1000·9.81·3.5·4.5 = 154.5 kN

Answer

F = 154.5 kN
18.Hydrostatic force

Answer: ycp = 2.633 m

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 1.5 + 2/2 = 2.5 m
A = H·b = 2·3 = 6 m²
gated = 1.5 mH = 2 mF

Resultant force

F = ρ·g·yc·A = 1025·9.81·2.5·6 = 150.8 kN

Centre of pressure

Pressure grows with depth, so the resultant acts below the centroid.

Ic = b·H³/12 = 3·2³/12 = 2 m⁴
ycp = yc + Ic/(yc·A) = 2.5 + 2/(2.5·6) = 2.633 m

Answer

ycp = 2.633 m
19.Pipe friction & head loss

Answer: Δp = 173.4 kPa

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Head loss

hf = f·(L/D)·V²/(2g) = 0.015·(400/0.05)·1.7²/(2·9.81) = 17.68 m

Pressure drop

The pipe is horizontal and the velocity does not change, so the energy equation reduces to Δp = ρ·g·hf.

Δp = ρ·g·hf = 1000·9.81·17.68 = 173400 Pa = 173.4 kPa

Answer

Δp = 173.4 kPa
20.Pipe friction & head loss

Answer: H = 1.367 m

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Velocity

V = Q/A = 0.1/0.07069 = 1.415 m/s
V²/(2g) = 0.102 m

Loss coefficients

f·L/D = 0.018·150/0.3 = 9
ΣK = 0.5 + 3·0.3 + 2 = 3.4

Energy equation

The outlet jet still carries its velocity head; it is not a loss but it has to be supplied.

H = (1 + 9 + 3.4)·0.102 = 1.367 m

Answer

H = 1.367 m
21.Open-channel flow (Manning)

Answer: Q = 0.2024 m³/s

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Geometry

A = 0.3181 m², R = D/4 = 0.225 m

Velocity

V = (1/0.013)·0.2252/3·0.00051/2 = 0.6363 m/s

Flow rate

Q = A·V = 0.3181·0.6363 = 0.2024 m³/s

Answer

Q = 0.2024 m³/s
22.Open-channel flow (Manning)

Answer: S = 0.003833 m/m

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Hydraulic radius

R = D/4 = 0.25/4 = 0.0625 m

Solve Manning for S

S = (n·V/R2/3)² = (0.013·0.75/0.1575)² = 0.003833

Answer

S = 0.003833

That is a fall of 3.833 m per kilometre.

23.Pumps & pump power

Answer: Pshaft = 9.055 kW

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Hydraulic power

Ph = ρ·g·Q·H = 1000·9.81·0.04·18 = 7.063 kW

Shaft power

Pshaft = Ph/η = 7.063/0.78 = 9.055 kW

Answer

Pshaft = 9.055 kW
24.Pumps & pump power

Answer: H = 37.89 m

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Velocity

V = Q/A = 0.01/0.007854 = 1.273 m/s
V²/(2g) = 0.08263 m

Head losses

hL = (f·L/D + ΣK)·V²/(2g) = (22 + 6)·0.08263 = 2.314 m

Pressure head

p/(ρ·g) = 300000/(1000·9.81) = 30.58 m

Pump head

Both surfaces are practically at rest, so there is no velocity head term.

H = Δz + p/(ρ·g) + hL = 5 + 30.58 + 2.314 = 37.89 m

Answer

H = 37.89 m
25.Time value of money

Answer: PV = 4571 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Rate and number of periods

i = 0.03/4 = 0.0075
N = 4·3 = 12

Present value

PV = FV/(1 + i)N = 5 000/1.094 = €4 571.19

Answer

PV = €4 571.19
26.Time value of money

Answer: FV = 24973 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Ordinary annuity factor

((1 + 0.04)10 − 1)/0.04 = 12.01

Annuity due

Each deposit is invested one year longer.

FV = 2 000·12.01·1.04 = €24 972.70

Answer

FV = €24 972.70
27.NPV & IRR

Answer: NPV = −9663 €

Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.

Present value of each cash flow

CF0 = −45 000
CF1/(1 + 0.15)1 = 13 000/1.15 = 11 304.35
CF2/(1 + 0.15)2 = 17 000/1.322 = 12 854.44
CF3/(1 + 0.15)3 = 17 000/1.521 = 11 177.78

Add them up

NPV = €−9 663.43

Answer

NPV = €−9 663.43

NPV is negative, so the project earns less than the required return.

28.NPV & IRR

Answer: r* = 7.468 %

Crossover rate: the discount rate at which two projects have the same NPV. It is the IRR of the difference in their cash flows (B − A). Below it the project with the later, larger cash flows has the higher NPV; above it the other one wins.

Difference in cash flows

ΔCF0 = −42 000 − (−40 000) = −2 000
ΔCF1 = 12 000 − 23 000 = −11 000
ΔCF2 = 18 500 − 16 000 = 2 500
ΔCF3 = 21 500 − 9 000 = 12 500

IRR of the difference

NPVΔ(7%) = 106.95
NPVΔ(8%) = −118.94
r* = 7.468%

Answer

r* = 7.468%

Check: at 7.468% both NPVs are €2 506.37.

29.Normal distribution

Answer: P = 0.4277

Normal distribution: convert a value x to a z-score, z = (x − μ)/σ, which counts standard deviations from the mean. A z-table (or Φ(z)) gives the area to the left of z, which is P(X < x). The area to the right is 1 − Φ(z), and the area between two values is the difference of their two areas.

z-scores

z₁ = (55.5 − 65)/10 = −0.95
z₂ = (67.5 − 65)/10 = 0.25

Area between

P = Φ(0.25) − Φ(−0.95) = 0.5987 − 0.1711 = 0.4277

Answer

P = 0.4277
30.Normal distribution

Answer: x = 89.88 points

Normal distribution: convert a value x to a z-score, z = (x − μ)/σ, which counts standard deviations from the mean. A z-table (or Φ(z)) gives the area to the left of z, which is P(X < x). The area to the right is 1 − Φ(z), and the area between two values is the difference of their two areas.

z for the percentile

Φ(z) = 0.25 → z = −0.6745

Back to x

x = 100 + −0.6745·15 = 89.88 points

Answer

x = 89.88 points