laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)
Open-channel flow (Manning)
Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²
Pumps & pump power
Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)
Time value of money
Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i
Method
Draw a timeline with every cash flow and its timing.
Match the rate to the period: a monthly rate for monthly payments.
Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
Check the sign and the order of magnitude of the answer.
NPV & IRR
Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)
Method
List all cash flows with their year; the investment at year 0 is negative.
Discount each cash flow: CFt/(1 + r)t.
Add them up to get the NPV. Positive means the project earns more than r.
For the IRR, find the rate that makes NPV zero by trial or interpolation.
Normal distribution
z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ
Method
Convert the value to a z-score: z = (x − μ)/σ.
Look up Φ(z), the area to the left of z.
For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
For a percentile, work backwards: find z for the area, then x = μ + z·σ.
2Practice problems
1.Beam support reactionsMedium
The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RB.
L = 8 mP1 = 10 kN at 1 mP2 = 55 kN at 5 m
RB = kN
2.Beam support reactionsHard
The cantilever beam is fixed to the wall at A. It carries a linearly varying load that is zero at the wall and rises to 12 kN/m at the free end B, plus a point load P at 4 m from the wall. Find the magnitude of the reaction moment MA at the wall.
L = 6 mw0 = 12 kN/mP = 35 kN at 4 m
MA = kN·m
3.Truss: method of jointsMedium
Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.
B: 10 kN ↓F: 25 kN ↓G: 25 kN ↓H: 30 kN ↓
1member AB
2member BC
3member CD
4member DE
5member FG
6member GH
7member AF
8member HE
9member BF
10member CG
11member DH
12member FC
13member HC
4.Truss: method of jointsHard
Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.
The marks A to G split the beam into six equal parts. At which mark is the bending moment largest in size, sagging or hogging? Click it in the diagram.
50 kN @ 2 m10 kN/m, 0–6 m
1A (x = 0 m)
2B (x = 1 m)
3C (x = 2 m)
4D (x = 3 m)
5E (x = 4 m)
6F (x = 5 m)
7G (x = 6 m)
6.Shear force & bending momentHard
The beam rests on a pin at A and a roller at B and overhangs B by 2.5 m to the free end C. A uniformly distributed load w acts over the whole length A–C. Find the maximum sagging bending moment Mmax between the supports.
L = 8.5 mw = 8 kN/m from 0 to 8.5 msupports at x = 0 and x = 6 m
Mmax = kN·m
7.Beam deflectionMedium
A simply supported beam carries a point load P at a = 2 m from support A. Find the deflection δP under the load.
P = 8 kNa = 2 mL = 5 mE = 70 GPa (aluminium)I = 160 × 10⁶ mm⁴
δP = mm
8.Beam deflectionHard
A propped cantilever is fixed at A and simply supported (propped) at B. It carries a point load P at midspan. EI is constant. Find the reaction RB at the prop.
L = 8 mP = 75 kN at 4 m
RB = kN
9.Column bucklingMedium
A column of length L made of steel is pinned at both ends. Using Euler’s formula, find its critical buckling load Pcr.
L = 2 mE = 200 GPa (steel)d = 20 mm
Pcr = kN
10.Column bucklingHard
A solid round column of length L made of steel is fixed at both ends. It must carry 30 kN with a factor of safety of 2.5 against buckling. Find the smallest diameter d.
P = 30 kNn = 2.5L = 6 mE = 200 GPa (steel)
d = mm
11.Centroid & second moment of areaMedium
A 200 mm × 300 mm plate has a circular hole of diameter 40 mm on its vertical centre line, with its centre 210 mm above the bottom. Find the second moment of area Ix about the horizontal axis through the centroid.
b = 200 mmh = 300 mmd = 40 mmhole centre: y = 210 mm
Ix = × 10⁶ mm⁴
12.Centroid & second moment of areaHard
A 150 mm × 300 mm plate has a rectangular cut-out 50 mm wide and 30 mm high, centred on the vertical centre line with its centre 195 mm above the bottom. Find the second moment of area Ix about the horizontal axis through the centroid.
b = 150 mmh = 300 mmcut-out: 50 × 30 mmhole centre: y = 195 mm
Ix = × 10⁶ mm⁴
13.Effective stress in soilMedium
For the soil profile shown, find the vertical effective stress σ′ at point X.
A 4.5 m thick overconsolidated clay layer has Cc = 0.5, Cr = 0.04 and e₀ = 0.9. At its mid-depth the effective vertical stress is 45 kPa and the preconsolidation pressure is 135 kPa. A new building adds 210 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.
A clay layer 10 m thick has a coefficient of consolidation cv = 1.2 m²/year. It lies on impervious rock, with sand above it, so water drains out only at the top. For 70% average consolidation the time factor is Tv = 0.403. How many years t does the layer take to reach 70% consolidation?
A vertical rectangular gate 3 m wide sits in the wall of a tank of water, with its top edge 1 m below the surface. Find the resultant hydrostatic force F on the gate.
d = 1 mH = 3 mb = 3 mρ = 1000 kg/m³g = 9.81 m/s²
F = kN
18.Hydrostatic forceHard
A vertical rectangular gate 1.5 m wide sits in the wall of a tank of water, with its top edge 2.5 m below the surface. Find the resultant hydrostatic force F on the gate.
Water flows at a mean velocity of 2.1 m/s through a pipe 100 m long with an inside diameter of 75 mm. Use the Darcy friction factor f = 0.015 and g = 9.81 m/s². Find the friction head loss hf.
A pipe 200 m long with an inside diameter of 250 mm (Darcy friction factor f = 0.022) runs from an open reservoir and discharges as a free jet into the air. The minor losses are a square-edged entrance (K = 0.5), 2 bends (K = 0.3 each) and a valve (K = 10). Use g = 9.81 m/s². How far H must the reservoir surface be above the pipe outlet for a flow rate of 60 L/s?
A rectangular unfinished concrete channel is 5 m wide. Water flows uniformly 2.1 m deep. Manning n = 0.014 and the bed slope is S = 0.002. Find the flow rate Q in m³/s.
b = 5 my = 2.1 mn = 0.014S = 0.002
Q = m³/s
22.Open-channel flow (Manning)Hard
A trapezoidal grass-lined earth channel with a bottom width of 1.5 m and side slopes of 2:1 (horizontal:vertical) must carry 12 m³/s in uniform flow at a depth of 2.1 m. Manning n = 0.03. Find the required bed slope S (in m/m).
Q = 12 m³/sb = 1.5 my = 2.1 mz = 2n = 0.03
S = m/m
23.Pumps & pump powerMedium
In a test, a pump delivers 30 L/s of water (ρ = 1000 kg/m³) against a head of 22 m while its shaft takes 10 kW. Use g = 9.81 m/s². Find the pump efficiency η in percent.
Q = 30 L/sH = 22 mPshaft = 10 kWg = 9.81 m/s²
η = %
24.Pumps & pump powerHard
A pump moves 75 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 32 m higher. The pipe is 300 m long with an inside diameter of 200 mm and a Darcy friction factor f = 0.022; the minor-loss coefficients add up to ΣK = 8 (entrance and exit included). Use g = 9.81 m/s². Find the head H the pump must add.
An annuity pays €5 000 at the end of each year for 8 years. The interest rate is 6% per year. Find the present value PV of the annuity.
A = €5 000i = 6%n = 8
PV = €
26.Time value of moneyHard
A loan of €12 000 is repaid with equal monthly payments over 5 years. The interest rate is 5.4% per year, compounded monthly. Find the monthly payment A.
P = €12 0005.4% / 12N = 60
A = €
27.NPV & IRRMedium
An investment of €45 000 gives these cash flows at the end of years 1 to 4: €22 000, €22 000, €12 000, €20 000. The cost of capital is 10%. Find the net present value NPV.
A project costs €10 000 and returns €7 000, €7 000 at the end of years 1 to 2. Find its internal rate of return IRR in percent.
CF0 = −10 000CF1 = 7 000CF2 = 7 000
IRR = %
29.Normal distributionMedium
The delivery times are normally distributed with mean 32 min and standard deviation 6 min. What fraction lies between 26.3 and 41.3 min? Give P as a decimal.
μ = 32σ = 6x1 = 26.3x2 = 41.3
P =
30.Normal distributionHard
The heights of adult men are normally distributed with mean 178 cm and standard deviation 7 cm. Find the value x below which 5% of them lie (the 5th percentile).
μ = 178σ = 7P = 5%
x = cm
3Solutions
1.Beam support reactions
Answer: RB = 35.63 kN
Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.
Free-body diagram
Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.
Equilibrium
Moments about A, counter-clockwise positive. Then vertical force balance.
ΣMA = 0: RB·8 = 10·1 + 55·5
RB = 285/8 = 35.63 kN
ΣFy = 0: RA = 65 − 35.63 = 29.38 kN
Answer
RB = 35.63 kN
2.Beam support reactions
Answer: MA = 284 kN·m
Cantilever equilibrium: a fixed support can push up and also resist rotation, so it gives a vertical reaction RA and a reaction moment MA. ΣFy = 0 gives RA, and moments about the wall give MA = Σ(load × distance from the wall). A distributed load acts as its resultant at the centroid of the load diagram.
Resultant of the triangular load
W = ½·12·6 = 36 kN
x̄ = 2L/3 = 4 m
Moment about the wall
MA = W·x̄ + P·a = 36·4 + 35·4 = 284 kN·m
Answer
MA = 284 kN·m
3.Truss: method of joints
Answer: member DH
Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.
Joint D
CD and DE lie on one straight line and the joint carries no load. Balancing forces across that line leaves only DH.
ΣF⊥ = 0 → FDH = 0
Check with the method of joints
Solving all joints gives these member forces (T = tension, C = compression).
Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.
Joint G
FG and GH lie on one straight line and the joint carries no load. Balancing forces across that line leaves only CG.
ΣF⊥ = 0 → FCG = 0
Check with the method of joints
Solving all joints gives these member forces (T = tension, C = compression).
Largest bending moment: M changes slope wherever the shear force changes, so its peaks sit where the shear force crosses zero: under a point load, inside a distributed load, or over a support of an overhang. At a fixed support of a cantilever the moment is largest at the wall. Compare the size of M at those places, sagging or hogging.
Support reactions
Take moments about one support, then use the vertical force balance.
R1 = 63.33 kN, R2 = 46.67 kN
Bending moment at every mark
Sum the moments of all forces on one side of the cut. Sagging is positive, hogging negative.
MA = 0, MB = 58.33, MC = 106.7 kN·m, MD = 95, ME = 73.33, MF = 41.67, MG = 0
Answer
Mark C: MC = 106.7 kN·m
6.Shear force & bending moment
Answer: Mmax = 24.59 kN·m
Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut. Maximum moment: since dM/dx = V, the bending moment has its peak where the shear force passes through zero, either at a point load or inside a distributed load.
Support reactions
Equilibrium of the whole beam, including the load on the overhang.
UDL resultant: W = w·ℓ = 8·8.5 = 68 kN, acting at x̄ = 4.25 m
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).
Consistent units
Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.
P = 8000 N, a = 2000 mm, b = 3000 mm, L = 5000 mm
EI = 1.12 × 10¹³ N·mm²
Deflection under the load
δP = Pa²b²/(3EIL) = 8000·2000²·3000²/(3·1.12 × 10¹³·5000) = 1.714 mm
Answer
δP = 1.714 mm
8.Beam deflection
Answer: RB = 23.44 kN
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition). For a statically indeterminate beam, remove a redundant support and require the deflection there to be zero (compatibility).
Remove the prop
Without the prop the beam is a cantilever. Its free end would deflect under the load.
δload = P(L/2)²(3L − L/2)/(6EI) = 5PL³/(48EI)
Compatibility at the prop
The prop force RB alone lifts the free end by RBL³/(3EI). The prop holds B at zero deflection, so the two must cancel. EI cancels out.
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Required critical load
Pcr = n·P = 2.5·30000 = 75000 N
KL = 0.5·6000 = 3000 mm
Solve for the diameter
d = (64·n·P·(KL)²/(π³E))^(1/4) = (64·75000·3000²/(π³·200000))^(1/4) = 51.37 mm
Answer
d = 51.37 mm
Check: the slenderness KL/r is 233.6, so the column is slender and Euler applies.
11.Centroid & second moment of area
Answer: Ix = 445.3 × 10⁶ mm⁴
Sections with holes: treat a hole as a negative area. The centroid is ȳ = (A₁y₁ − A₂y₂)/(A₁ − A₂), with A₁, y₁ for the full plate and A₂, y₂ for the hole. For the second moment of area about the centroidal axis, use the parallel-axis theorem for each part and subtract the hole: I = (Ic1 + A₁d₁²) − (Ic2 + A₂d₂²), where d is the distance from each part's own centroid to the axis through ȳ. A rectangle has Ic = bh³/12 and a circle Ic = πd⁴/64.
Centroid
ȳ = (60000·150 − 1257·210)/(60000 − 1257) = 148.7 mm
Full plate about ȳ
200·300³/12 + 60000·1.284² = 450.1 × 10⁶ mm⁴
Hole about ȳ
π·40⁴/64 + 1257·61.28² = 4.845 × 10⁶ mm⁴
Subtract
Ix = 445.3 × 10⁶ mm⁴
Answer
Ix = 445.3 × 10⁶ mm⁴
12.Centroid & second moment of area
Answer: Ix = 334.2 × 10⁶ mm⁴
Sections with holes: treat a hole as a negative area. The centroid is ȳ = (A₁y₁ − A₂y₂)/(A₁ − A₂), with A₁, y₁ for the full plate and A₂, y₂ for the hole. For the second moment of area about the centroidal axis, use the parallel-axis theorem for each part and subtract the hole: I = (Ic1 + A₁d₁²) − (Ic2 + A₂d₂²), where d is the distance from each part's own centroid to the axis through ȳ. A rectangle has Ic = bh³/12 and a circle Ic = πd⁴/64.
Centroid
ȳ = (45000·150 − 1500·195)/(45000 − 1500) = 148.4 mm
Full plate about ȳ
150·300³/12 + 45000·1.552² = 337.6 × 10⁶ mm⁴
Hole about ȳ
50·30³/12 + 1500·46.55² = 3.363 × 10⁶ mm⁴
Subtract
Ix = 334.2 × 10⁶ mm⁴
Answer
Ix = 334.2 × 10⁶ mm⁴
13.Effective stress in soil
Answer: σ′ = 57.76 kPa
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Total stress
Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.
Water pressure grows with depth below the water table.
u = γw·(z − zw) = 9.81·4 = 39.24 kPa
Effective stress
σ′ = σ − u = 97 − 39.24 = 57.76 kPa
Answer
σ′ = 57.76 kPa
14.Effective stress in soil
Answer: σ′ = 83.26 kPa
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Total stress
Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.
σ = γd·3 + γsat,sand·1 + γsat,clay·3
σ = 15.5·3 + 19·1 + 19·3 = 122.5 kPa
Pore water pressure
Water pressure grows with depth below the water table.
u = γw·(z − zw) = 9.81·4 = 39.24 kPa
Effective stress
σ′ = σ − u = 122.5 − 39.24 = 83.26 kPa
Answer
σ′ = 83.26 kPa
15.Consolidation settlement
Answer: S = 372.3 mm
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Compare with the preconsolidation pressure
σ′f = 45 + 210 = 255 kPa > 135 kPa
Settlement
Recompression up to σ′p, virgin compression beyond it.
S = 0.04·4.5/(1 + 0.9)·log₁₀(135/45) + 0.5·4.5/(1 + 0.9)·log₁₀(255/135)
S = 45.2 + 327.1 = 372.3 mm
Answer
S = 372.3 mm
16.Consolidation settlement
Answer: t = 33.58 years
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Drainage path
Hdr = H = 10 m
Time
t = Tv·Hdr²/cv = 0.403·10²/1.2 = 33.58 years
Answer
t = 33.58 years
17.Hydrostatic force
Answer: F = 220.7 kN
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 1 + 3/2 = 2.5 m
A = H·b = 3·3 = 9 m²
Resultant force
F = ρ·g·yc·A = 1000·9.81·2.5·9 = 220.7 kN
Answer
F = 220.7 kN
18.Hydrostatic force
Answer: F = 71.74 kN
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 2.5 + 1.5/2 = 3.25 m
A = H·b = 1.5·1.5 = 2.25 m²
Resultant force
F = ρ·g·yc·A = 1000·9.81·3.25·2.25 = 71.74 kN
Answer
F = 71.74 kN
19.Pipe friction & head loss
Answer: hf = 4.495 m
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Velocity head
V²/(2g) = 2.1²/(2·9.81) = 0.2248 m
Darcy–Weisbach
hf = f·(L/D)·V²/(2g) = 0.015·(100/0.075)·2.1²/(2·9.81) = 4.495 m
Answer
hf = 4.495 m
20.Pipe friction & head loss
Answer: H = 2.262 m
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Velocity
V = Q/A = 0.06/0.04909 = 1.222 m/s
V²/(2g) = 0.07615 m
Loss coefficients
f·L/D = 0.022·200/0.25 = 17.6
ΣK = 0.5 + 2·0.3 + 10 = 11.1
Energy equation
The outlet jet still carries its velocity head; it is not a loss but it has to be supplied.
H = (1 + 17.6 + 11.1)·0.07615 = 2.262 m
Answer
H = 2.262 m
21.Open-channel flow (Manning)
Answer: Q = 36.63 m³/s
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Geometry
A = b·y = 5·2.1 = 10.5 m²
P = b + 2y = 5 + 2·2.1 = 9.2 m
R = A/P = 1.141 m
Velocity
V = (1/0.014)·1.1412/3·0.0021/2 = 3.489 m/s
Flow rate
Q = A·V = 10.5·3.489 = 36.63 m³/s
Answer
Q = 36.63 m³/s
22.Open-channel flow (Manning)
Answer: S = 0.0007975 m/m
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Geometry
A = (b + z·y)·y = (1.5 + 2·2.1)·2.1 = 11.97 m²
P = b + 2y·√(1 + z²) = 1.5 + 2·2.1·√(1 + 2²) = 10.89 m
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Hydraulic power
Ph = ρ·g·Q·H = 1000·9.81·0.03·22 = 6.475 kW
Efficiency
η = Ph/Pshaft = 6.475/10 = 64.75%
Answer
η = 64.75%
24.Pumps & pump power
Answer: H = 43.91 m
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Both surfaces are open and practically at rest, so pressure and velocity terms drop out.
H = Δz + hL = 32 + 11.91 = 43.91 m
Answer
H = 43.91 m
25.Time value of money
Answer: PV = 31049 €
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
Annuity factor
(1 − (1 + i)−n)/i = (1 − 0.6274)/0.06 = 6.21
Present value
PV = 5 000·6.21 = €31 048.97
Answer
PV = €31 048.97
26.Time value of money
Answer: A = 228.7 €
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
Monthly rate and number of payments
i = 0.054000000000000006/12 = 0.0045
N = 12·5 = 60
Payment
The present value of N equal payments A is A·(1 − (1 + i)⁻ᴺ)/i. Set it equal to the loan and solve for A.
(1 + i)−N = 0.7638
A = 12 000·0.0045/(1 − 0.7638) = €228.66
Answer
A = €228.66
27.NPV & IRR
Answer: NPV = 15858 €
Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.
Present value of each cash flow
CF0 = −45 000
CF1/(1 + 0.1)1 = 22 000/1.1 = 20 000.00
CF2/(1 + 0.1)2 = 22 000/1.21 = 18 181.82
CF3/(1 + 0.1)3 = 12 000/1.331 = 9 015.78
CF4/(1 + 0.1)4 = 20 000/1.464 = 13 660.27
Add them up
NPV = €15 857.86
Answer
NPV = €15 857.86
NPV is positive, so the project earns more than the required return.
28.NPV & IRR
Answer: IRR = 25.69 %
Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.
Bracket the IRR
NPV falls as the rate rises, so the IRR lies between a rate with positive NPV and one with negative NPV.
NPV(25%) = 80.00
NPV(30%) = −473.37
Narrow down
Linear interpolation gives a first estimate; repeating it (or a calculator's IRR function) gives the exact rate.
IRR ≈ 25 + 5·80.00/(80.00 − (−473.37)) = 25.72%
exact: NPV(25.69%) = 0 → IRR = 25.69%
Answer
IRR = 25.69%
29.Normal distribution
Answer: P = 0.7684
Normal distribution: convert a value x to a z-score, z = (x − μ)/σ, which counts standard deviations from the mean. A z-table (or Φ(z)) gives the area to the left of z, which is P(X < x). The area to the right is 1 − Φ(z), and the area between two values is the difference of their two areas.
z-scores
z₁ = (26.3 − 32)/6 = −0.95
z₂ = (41.3 − 32)/6 = 1.55
Area between
P = Φ(1.55) − Φ(−0.95) = 0.9394 − 0.1711 = 0.7684
Answer
P = 0.7684
30.Normal distribution
Answer: x = 166.5 cm
Normal distribution: convert a value x to a z-score, z = (x − μ)/σ, which counts standard deviations from the mean. A z-table (or Φ(z)) gives the area to the left of z, which is P(X < x). The area to the right is 1 − Φ(z), and the area between two values is the difference of their two areas.
z for the percentile
Φ(z) = 0.05 → z = −1.645
Back to x
x = 178 + −1.645·7 = 166.49 cm
Answer
x = 166.49 cm
This is independent practice material. ExamProblems is not affiliated with or endorsed by the organisation that runs this exam, and the exam name is used only to describe the content. The FE exam is run by NCEES, which is not affiliated with ExamProblems and does not endorse it.