laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)
Open-channel flow (Manning)
Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²
Pumps & pump power
Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)
Time value of money
Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i
Method
Draw a timeline with every cash flow and its timing.
Match the rate to the period: a monthly rate for monthly payments.
Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
Check the sign and the order of magnitude of the answer.
NPV & IRR
Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)
Method
List all cash flows with their year; the investment at year 0 is negative.
Discount each cash flow: CFt/(1 + r)t.
Add them up to get the NPV. Positive means the project earns more than r.
For the IRR, find the rate that makes NPV zero by trial or interpolation.
Normal distribution
z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ
Method
Convert the value to a z-score: z = (x − μ)/σ.
Look up Φ(z), the area to the left of z.
For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
For a percentile, work backwards: find z for the area, then x = μ + z·σ.
2Practice problems
1.Beam support reactionsMedium
The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RA.
L = 5 mP1 = 15 kN at 2.5 mP2 = 35 kN at 3.5 m
RA = kN
2.Beam support reactionsHard
The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RB.
L = 4 mP = 40 kN at 1.5 mw = 12 kN/m from 1 to 2 m
RB = kN
3.Truss: method of jointsMedium
Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.
B: 10 kN ↓C: 20 kN ↓D: 30 kN ↓H: 10 kN ↓
1member AB
2member BC
3member CD
4member DE
5member FG
6member GH
7member AF
8member HE
9member BF
10member CG
11member DH
12member FC
13member HC
4.Truss: method of jointsHard
Use the method of joints to find the force FAC in member AC. Give tension as positive and compression as negative.
span = 8 mheight = 2 mB is 3 m from Avertical load = 50 kNhorizontal load = 15 kN →
FAC = kN
5.Shear force & bending momentMedium
The marks A to G split the beam into six equal parts. At which mark is the bending moment largest in size, sagging or hogging? Click it in the diagram.
20 kN @ 4 m5 kN/m, 0–6 m
1A (x = 0 m)
2B (x = 1 m)
3C (x = 2 m)
4D (x = 3 m)
5E (x = 4 m)
6F (x = 5 m)
7G (x = 6 m)
6.Shear force & bending momentHard
The marks A to G split the beam into six equal parts. At which mark is the bending moment largest in size, sagging or hogging? Click it in the diagram.
10 kN @ 12 m25 kN @ 2 m
1A (x = 0 m)
2B (x = 2 m)
3C (x = 4 m)
4D (x = 6 m)
5E (x = 8 m)
6F (x = 10 m)
7G (x = 12 m)
7.Beam deflectionMedium
A simply supported beam carries a point load P at a = 5 m from support A. Find the deflection δP under the load.
P = 18 kNa = 5 mL = 6 mE = 200 GPa (steel)I = 120 × 10⁶ mm⁴
δP = mm
8.Beam deflectionHard
A simply supported beam carries a uniformly distributed load w and a point load P at midspan. Using superposition, find the midspan deflection δmax.
P = 17 kNw = 2 kN/mL = 3 mE = 200 GPa (steel)I = 57 × 10⁶ mm⁴
δmax = mm
9.Column bucklingMedium
A column of length L made of steel is fixed at the base and pinned at the top. Using Euler’s formula, find its critical buckling load Pcr.
L = 3 mE = 200 GPa (steel)b × h = 25 × 60 mm
Pcr = kN
10.Column bucklingHard
A column of length L made of aluminium is fixed at both ends. Find its slenderness and the critical buckling stress σcr from Euler’s formula.
L = 5 mE = 70 GPa (aluminium)d = 80 mm
σcr = MPa
11.Centroid & second moment of areaMedium
Find the second moment of area Ix of the T-section about the horizontal axis x through its centroid.
bf = 100 mmtf = 15 mmtw = 10 mmhw = 180 mm
Ix = × 10⁶ mm⁴
12.Centroid & second moment of areaHard
A 120 mm × 240 mm plate has a rectangular cut-out 80 mm wide and 20 mm high, centred on the vertical centre line with its centre 168 mm above the bottom. Find the second moment of area Ix about the horizontal axis through the centroid.
b = 120 mmh = 240 mmcut-out: 80 × 20 mmhole centre: y = 168 mm
Ix = × 10⁶ mm⁴
13.Effective stress in soilMedium
For the soil profile shown, find the vertical effective stress σ′ at point X.
A 5.5 m thick overconsolidated clay layer has Cc = 0.3, Cr = 0.05 and e₀ = 0.95. At its mid-depth the effective vertical stress is 95 kPa and the preconsolidation pressure is 175 kPa. A new building adds 55 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.
In a laboratory oedometer test, a clay specimen 25 mm thick, drained at the top and bottom, reaches 50% consolidation in 5 min. In the field the same clay forms a layer 10 m thick. It lies on impervious rock, with sand above it, so water drains out only at the top. How many days t does the field layer take to reach 50% consolidation?
A vertical rectangular gate 1.5 m wide sits in the wall of a tank of water, with its top edge 2 m below the surface. Find the resultant hydrostatic force F on the gate.
A vertical rectangular gate 1.5 m wide sits in the wall of a tank of glycerin, with its top edge 3 m below the surface. Find the resultant hydrostatic force F on the gate.
Water (ρ = 1000 kg/m³) flows at 1.7 m/s through a horizontal pipe, 500 m long, with an inside diameter of 100 mm. Use the Darcy friction factor f = 0.025 and g = 9.81 m/s². Find the pressure drop Δp over the pipe in kPa.
Two open reservoirs are joined by a pipe 200 m long with an inside diameter of 300 mm and a Darcy friction factor f = 0.022. The water surface of the upper reservoir is 29 m above that of the lower one. The minor losses are a square-edged entrance (K = 0.5), 3 bends (K = 0.3 each), a valve (K = 5) and the exit into the lower reservoir (K = 1.0). Use g = 9.81 m/s². Find the flow rate Q in L/s.
A rectangular grass-lined earth channel is 4.5 m wide. Water flows uniformly 2 m deep. Manning n = 0.03 and the bed slope is S = 0.0008. Find the flow rate Q in m³/s.
b = 4.5 my = 2 mn = 0.03S = 0.0008
Q = m³/s
22.Open-channel flow (Manning)Hard
A rectangular brickwork channel 2 m wide must carry 5.7 m³/s in uniform flow at a depth of 1.8 m. Manning n = 0.015. Find the required bed slope S (in m/m).
Q = 5.7 m³/sb = 2 my = 1.8 mn = 0.015
S = m/m
23.Pumps & pump powerMedium
In a test, a pump delivers 40 L/s of water (ρ = 1000 kg/m³) against a head of 34 m while its shaft takes 17.8 kW. Use g = 9.81 m/s². Find the pump efficiency η in percent.
Q = 40 L/sH = 34 mPshaft = 17.8 kWg = 9.81 m/s²
η = %
24.Pumps & pump powerHard
A pump moves 120 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 15 m higher. The pipe is 400 m long with an inside diameter of 250 mm and a Darcy friction factor f = 0.025; the minor-loss coefficients add up to ΣK = 5 (entrance and exit included). Use g = 9.81 m/s². The pump efficiency is 85%. Find the shaft power Pshaft in kW.
You invest €12 000 at a nominal rate of 6% per year, compounded quarterly. Find the value FV of the investment after 7 years.
PV = €12 0006% / 4n = 7
FV = €
26.Time value of moneyHard
A mortgage of €300 000 is repaid with equal monthly payments over 20 years at 7.2% per year, compounded monthly. How much is still owed just after the payment at the end of year 3? Find the outstanding balance B.
P = €300 0007.2% / 12N = 240k = 36
B = €
27.NPV & IRRMedium
An investment of €75 000 gives these cash flows at the end of years 1 to 3: €31 000, €29 000, €27 000. The cost of capital is 10%. Find the net present value NPV.
A project costs €10 000 and returns €6 000, €7 500 at the end of years 1 to 2. Find its internal rate of return IRR in percent.
CF0 = −10 000CF1 = 6 000CF2 = 7 500
IRR = %
29.Normal distributionMedium
The masses of bags of cement are independent and normal with mean 25 kg and standard deviation 0.5 kg. Find the probability P that the total mass of 4 of them is below 98.5 kg. Round z to two decimals.
μ = 25 kgσ = 0.5 kgn = 4< 98.5 kg
P =
30.Normal distributionHard
The battery lifetimes are normally distributed with mean 500 h and standard deviation 40 h. Find the value x below which 75% of them lie (the 75th percentile).
μ = 500σ = 40P = 75%
x = h
3Solutions
1.Beam support reactions
Answer: RA = 18 kN
Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.
Free-body diagram
Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.
Equilibrium
Moments about A, counter-clockwise positive. Then vertical force balance.
ΣMA = 0: RB·5 = 15·2.5 + 35·3.5
RB = 160/5 = 32 kN
ΣFy = 0: RA = 50 − 32 = 18 kN
Answer
RA = 18 kN
2.Beam support reactions
Answer: RB = 19.5 kN
Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.
Free-body diagram
Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.
Equilibrium
Moments about A, counter-clockwise positive. Then vertical force balance.
UDL resultant: W = w·ℓ = 12·1 = 12 kN, acting at x̄ = 1.5 m
ΣMA = 0: RB·4 = 40·1.5 + 12·1·1.5
RB = 78/4 = 19.5 kN
ΣFy = 0: RA = 52 − 19.5 = 32.5 kN
Answer
RB = 19.5 kN
3.Truss: method of joints
Answer: member CG
Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.
Joint G
FG and GH lie on one straight line and the joint carries no load. Balancing forces across that line leaves only CG.
ΣF⊥ = 0 → FCG = 0
Check with the method of joints
Solving all joints gives these member forces (T = tension, C = compression).
Method of joints: every pin of a truss is in equilibrium, so ΣFx = 0 and ΣFy = 0 at each joint. Start at a joint with at most two unknown member forces. A negative result means the member is in compression.
Support reactions
Equilibrium of the whole truss. Moments about A, counter-clockwise positive.
ΣMA = 0: Cy·8 = 50·3 + 15·2 → Cy = 22.5 kN
ΣFy = 0: Ay = 50 − 22.5 = 27.5 kN
ΣFx = 0: Ax = −15 kN
Joint C
The roller gives only a vertical reaction, so joint C has just two unknown member forces. Assume both in tension.
sin γ = 2/5.385 = 0.3714, cos γ = 5/5.385 = 0.9285
Largest bending moment: M changes slope wherever the shear force changes, so its peaks sit where the shear force crosses zero: under a point load, inside a distributed load, or over a support of an overhang. At a fixed support of a cantilever the moment is largest at the wall. Compare the size of M at those places, sagging or hogging.
Support reactions
Take moments about one support, then use the vertical force balance.
R1 = 21.67 kN, R2 = 28.33 kN
Bending moment at every mark
Sum the moments of all forces on one side of the cut. Sagging is positive, hogging negative.
MA = 0, MB = 19.17, MC = 33.33, MD = 42.5, ME = 46.67 kN·m, MF = 25.83, MG = 0
Answer
Mark E: ME = 46.67 kN·m
6.Shear force & bending moment
Answer: B (x = 2 m)
Largest bending moment: M changes slope wherever the shear force changes, so its peaks sit where the shear force crosses zero: under a point load, inside a distributed load, or over a support of an overhang. At a fixed support of a cantilever the moment is largest at the wall. Compare the size of M at those places, sagging or hogging.
Support reactions
Take moments about one support, then use the vertical force balance.
R1 = 18 kN, R2 = 17 kN
Bending moment at every mark
Sum the moments of all forces on one side of the cut. Sagging is positive, hogging negative.
MA = 0, MB = 36 kN·m, MC = 22, MD = 8, ME = −6, MF = −20, MG = 0
Answer
Mark B: MB = 36 kN·m
7.Beam deflection
Answer: δP = 1.042 mm
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).
Consistent units
Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.
P = 18000 N, a = 5000 mm, b = 1000 mm, L = 6000 mm
EI = 2.4 × 10¹³ N·mm²
Deflection under the load
δP = Pa²b²/(3EIL) = 18000·5000²·1000²/(3·2.4 × 10¹³·6000) = 1.042 mm
Answer
δP = 1.042 mm
8.Beam deflection
Answer: δmax = 1.024 mm
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).
Consistent units
Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.
P = 17000 N, w = 2 N/mm, L = 3000 mm, EI = 1.14 × 10¹³ N·mm²
Each load on its own
δP = PL³/(48EI) = 17000·3000³/(48·1.14 × 10¹³) = 0.8388 mm
δw = 5wL⁴/(384EI) = 5·2·3000⁴/(384·1.14 × 10¹³) = 0.185 mm
Add them
δmax = 0.8388 + 0.185 = 1.024 mm
Answer
δmax = 1.024 mm
9.Column buckling
Answer: Pcr = 34.97 kN
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Smallest second moment of area
A rectangle buckles about its weak axis, using the smaller dimension cubed.
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Smallest second moment of area
A round section has the same I about every axis.
I = πd⁴/64 = π·80⁴/64 = 2.011 × 10⁶ mm⁴
Radius of gyration and slenderness
A = 5027 mm²
r = √(I/A) = √(2.011 × 10⁶/5027) = 20 mm
KL = 0.5·5000 = 2500 mm
KL/r = 2500/20 = 125
Critical stress
σcr = π²E/(KL/r)² = π²·70000/125² = 44.22 MPa
Answer
σcr = 44.22 MPa
11.Centroid & second moment of area
Answer: Ix = 12.67 × 10⁶ mm⁴
Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.
Split into two rectangles
Measure every y from the bottom edge.
flange: Af = 100·15 = 1500 mm², yf = 180 + 15/2 = 187.5 mm
Sections with holes: treat a hole as a negative area. The centroid is ȳ = (A₁y₁ − A₂y₂)/(A₁ − A₂), with A₁, y₁ for the full plate and A₂, y₂ for the hole. For the second moment of area about the centroidal axis, use the parallel-axis theorem for each part and subtract the hole: I = (Ic1 + A₁d₁²) − (Ic2 + A₂d₂²), where d is the distance from each part's own centroid to the axis through ȳ. A rectangle has Ic = bh³/12 and a circle Ic = πd⁴/64.
Centroid
ȳ = (28800·120 − 1600·168)/(28800 − 1600) = 117.2 mm
Full plate about ȳ
120·240³/12 + 28800·2.824² = 138.5 × 10⁶ mm⁴
Hole about ȳ
80·20³/12 + 1600·50.82² = 4.186 × 10⁶ mm⁴
Subtract
Ix = 134.3 × 10⁶ mm⁴
Answer
Ix = 134.3 × 10⁶ mm⁴
13.Effective stress in soil
Answer: σ′ = 53.76 kPa
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Total stress
Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.
σ = γd·zw + γsat·(z − zw) = 17·1 + 19·4 = 93 kPa
Pore water pressure
Water pressure grows with depth below the water table.
u = γw·(z − zw) = 9.81·4 = 39.24 kPa
Effective stress
σ′ = σ − u = 93 − 39.24 = 53.76 kPa
Answer
σ′ = 53.76 kPa
14.Effective stress in soil
Answer: σ′ = 59.66 kPa
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Total stress
Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.
σ = γd·2 + γsat,sand·1 + γsat,clay·2.5
σ = 15·2 + 19·1 + 18·2.5 = 94 kPa
Pore water pressure
Water pressure grows with depth below the water table.
u = γw·(z − zw) = 9.81·3.5 = 34.34 kPa
Effective stress
σ′ = σ − u = 94 − 34.34 = 59.66 kPa
Answer
σ′ = 59.66 kPa
15.Consolidation settlement
Answer: S = 27.97 mm
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Compare with the preconsolidation pressure
σ′f = 95 + 55 = 150 kPa ≤ 175 kPa
Settlement
The clay stays on its recompression line.
S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0) = 0.05·5.5/(1 + 0.95)·log₁₀(150/95) = 27.97 mm
Answer
S = 27.97 mm
16.Consolidation settlement
Answer: t = 2222 days
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Drainage paths
Hdr,lab = 25/2 = 12.5 mm = 0.0125 m
Hdr,field = 10 m
Scale the time
t = Tv·Hdr²/cv with the same T_v and cv in the lab and the field.
tfield = 5·(10/0.0125)² = 3.2 × 10⁶ min
tfield = 3.2 × 10⁶/1440 = 2222 days
Answer
t = 2222 days
17.Hydrostatic force
Answer: F = 119.6 kN
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 2 + 2.5/2 = 3.25 m
A = H·b = 2.5·1.5 = 3.75 m²
Resultant force
F = ρ·g·yc·A = 1000·9.81·3.25·3.75 = 119.6 kN
Answer
F = 119.6 kN
18.Hydrostatic force
Answer: F = 104.3 kN
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 3 + 1.5/2 = 3.75 m
A = H·b = 1.5·1.5 = 2.25 m²
Resultant force
F = ρ·g·yc·A = 1260·9.81·3.75·2.25 = 104.3 kN
Answer
F = 104.3 kN
19.Pipe friction & head loss
Answer: Δp = 180.6 kPa
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Head loss
hf = f·(L/D)·V²/(2g) = 0.025·(500/0.1)·1.7²/(2·9.81) = 18.41 m
Pressure drop
The pipe is horizontal and the velocity does not change, so the energy equation reduces to Δp = ρ·g·hf.
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Loss coefficients
f·L/D = 0.022·200/0.3 = 14.67
ΣK = 0.5 + 3·0.3 + 5 + 1.0 = 7.4
Energy equation
Both surfaces are open to the air and practically at rest, so all of Δz is lost in the pipe.
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Geometry
A = b·y = 4.5·2 = 9 m²
P = b + 2y = 4.5 + 2·2 = 8.5 m
R = A/P = 1.059 m
Velocity
V = (1/0.03)·1.0592/3·0.00081/2 = 0.9794 m/s
Flow rate
Q = A·V = 9·0.9794 = 8.815 m³/s
Answer
Q = 8.815 m³/s
22.Open-channel flow (Manning)
Answer: S = 0.001017 m/m
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Hydraulic power
Ph = ρ·g·Q·H = 1000·9.81·0.04·34 = 13.34 kW
Efficiency
η = Ph/Pshaft = 13.34/17.8 = 74.95%
Answer
η = 74.95%
24.Pumps & pump power
Answer: Pshaft = 39.76 kW
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
Whatever is still owed must be exactly paid off by the remaining payments.
N − k = 240 − 36 = 204
B = 2362·(1 − (1 + 0.006)−204)/0.006 = €277 489.83
Answer
B = €277 489.83
27.NPV & IRR
Answer: NPV = −2566 €
Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.
Present value of each cash flow
CF0 = −75 000
CF1/(1 + 0.1)1 = 31 000/1.1 = 28 181.82
CF2/(1 + 0.1)2 = 29 000/1.21 = 23 966.94
CF3/(1 + 0.1)3 = 27 000/1.331 = 20 285.50
Add them up
NPV = €−2 565.74
Answer
NPV = €−2 565.74
NPV is negative, so the project earns less than the required return.
28.NPV & IRR
Answer: IRR = 21.65 %
Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.
Bracket the IRR
NPV falls as the rate rises, so the IRR lies between a rate with positive NPV and one with negative NPV.
NPV(20%) = 208.33
NPV(25%) = −400.00
Narrow down
Linear interpolation gives a first estimate; repeating it (or a calculator's IRR function) gives the exact rate.
IRR ≈ 20 + 5·208.33/(208.33 − (−400.00)) = 21.71%
exact: NPV(21.65%) = 0 → IRR = 21.65%
Answer
IRR = 21.65%
29.Normal distribution
Answer: P = 0.06681
Sums and differences of normal variables: if X and Y are independent and normal, X + Y and X − Y are normal too. Means add or subtract: E(X ± Y) = μX ± μY. Variances always add, also for a difference: Var(X ± Y) = σX² + σY², so σ = √(σX² + σY²). Standard deviations never add directly. The total of n independent items with the same distribution has mean n·μ and standard deviation σ·√n. Then standardise as usual: z = (x − mean)/σ and read Φ(z).
Distribution of the total
μT = 100 kg, σT = 0.5·√4 = 1 kg
Standardise
z = (98.5 − 100)/1 = −1.5
Probability
P = Φ(−1.5) = 0.06681
Answer
P = 0.06681
30.Normal distribution
Answer: x = 527 h
Normal distribution: convert a value x to a z-score, z = (x − μ)/σ, which counts standard deviations from the mean. A z-table (or Φ(z)) gives the area to the left of z, which is P(X < x). The area to the right is 1 − Φ(z), and the area between two values is the difference of their two areas.
z for the percentile
Φ(z) = 0.75 → z = 0.6745
Back to x
x = 500 + 0.6745·40 = 526.98 h
Answer
x = 526.98 h
This is independent practice material. ExamProblems is not affiliated with or endorsed by the organisation that runs this exam, and the exam name is used only to describe the content. The FE exam is run by NCEES, which is not affiliated with ExamProblems and does not endorse it.