FE Civil exam practice: cram pack

Formula sheets, the key method steps for every topic and 30 practice problems, with full solutions at the back.

New problemsBack to the course

In the print window, choose “Save as PDF” to keep a copy on your device.

1Formulas and methods

Beam support reactions

Equilibrium
ΣFx = 0, ΣFy = 0, ΣM = 0
Uniform load
resultant w·L at the middle of the load
Moment
M = F·d

Method

  1. Draw a free-body diagram and replace each support by its reactions.
  2. Replace every distributed load by a single force at its centroid.
  3. Take moments about one support to find the reaction at the other.
  4. Use ΣFy = 0 to find the remaining reaction, and check with a second moment equation.

Truss: method of joints

Method of joints
ΣFx = 0, ΣFy = 0 at each joint
Method of sections
ΣM = 0 about a cut point
Member force
positive = tension, negative = compression

Method

  1. Find the support reactions for the whole truss.
  2. Method of joints: start at a joint with at most two unknown member forces and use ΣFx = 0 and ΣFy = 0.
  3. Method of sections: cut through the member you need and take moments about a point where the other unknown members meet.
  4. Assume tension; a negative answer means compression.

Shear force & bending moment

Shear and moment
V = ΣF on one side, M = ΣF·d on one side
Bending stress
σ = M·y/I
Rectangle
I = bh³/12
Section modulus
W = I/ymax
Simply supported, uniform load
Mmax = wL²/8

Method

  1. Find the support reactions from equilibrium of the whole beam.
  2. Cut the beam at the section you need and keep one side.
  3. Shear force: sum of the vertical forces on that side. Bending moment: sum of their moments about the cut.
  4. For the maximum moment, find where the shear force is zero.

Beam deflection

Point load at midspan
δ = PL³/(48EI)
Uniform load, simply supported
δ = 5wL⁴/(384EI)
Cantilever, end load
δ = PL³/(3EI)
Cantilever, uniform load
δ = wL⁴/(8EI)
Superposition
δ = δ1 + δ2

Column buckling

Euler load
Pcr = π²EI/(KL)²
Effective length factor
K = 1 pinned–pinned, 0.5 fixed–fixed, 0.7 fixed–pinned, 2 fixed–free
Critical stress
σcr = Pcr/A
Slenderness
λ = KL/r, r = √(I/A)

Centroid & second moment of area

Centroid
ȳ = ΣAiyi/ΣAi
Rectangle
I = bh³/12
Parallel-axis theorem
I = Ic + A·d²
Composite section
I = Σ(Ic,i + Aidi²)

Effective stress in soil

Total stress
σ = Σγi·hi
Pore water pressure
u = γw·(z − zw)
Effective stress
σ′ = σ − u
Water
γw = 9.81 kN/m³

Consolidation settlement

Normally consolidated
S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0)
Final stress
σ′f = σ′0 + Δσ (at mid-depth of the layer)
Overconsolidated, σ′f ≤ σ′p
S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0)
Overconsolidated, σ′f > σ′p
S = H/(1 + e0)·[Cr·log₁₀(σ′p/σ′0) + Cc·log₁₀(σ′f/σ′p)]
Overconsolidation ratio
OCR = σ′p/σ′0
Time for consolidation
t = Tv·Hdr²/cv
Drainage path
Hdr = H/2 (double drainage), H (single drainage)
Time factors
U 50% → 0.197, 60% → 0.287, 70% → 0.403, 80% → 0.567, 90% → 0.848

Hydrostatic force

Pressure at depth
p = ρgh
Force on a vertical wall
F = ρg·hc·A
Centre of pressure
yp = yc + Ic/(ycA)
Rectangle
Ic = bH³/12

Pipe friction & head loss

Reynolds number
Re = V·D/ν = ρ·V·D/μ
Flow regime
laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)

Open-channel flow (Manning)

Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²

Pumps & pump power

Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)

Time value of money

Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i

Method

  1. Draw a timeline with every cash flow and its timing.
  2. Match the rate to the period: a monthly rate for monthly payments.
  3. Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
  4. Check the sign and the order of magnitude of the answer.

NPV & IRR

Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)

Method

  1. List all cash flows with their year; the investment at year 0 is negative.
  2. Discount each cash flow: CFt/(1 + r)t.
  3. Add them up to get the NPV. Positive means the project earns more than r.
  4. For the IRR, find the rate that makes NPV zero by trial or interpolation.

Normal distribution

z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ

Method

  1. Convert the value to a z-score: z = (x − μ)/σ.
  2. Look up Φ(z), the area to the left of z.
  3. For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
  4. For a percentile, work backwards: find z for the area, then x = μ + z·σ.

2Practice problems

1.Beam support reactionsMedium
P1​ = 15 kNP2​ = 35 kNABRA​ = ?RB​2.5 m1 m1.5 m

The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RA.

L = 5 mP1 = 15 kN at 2.5 mP2 = 35 kN at 3.5 m
RA = kN
2.Beam support reactionsHard
w = 12 kN/mP = 40 kNABRA​RB​ = ?1 m0.5 m0.5 m2 m

The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RB.

L = 4 mP = 40 kN at 1.5 mw = 12 kN/m from 1 to 2 m
RB = kN
3.Truss: method of jointsMedium
ABCDEFGH10 kN20 kN30 kN10 kN4 × 4 m4 m

Exactly one member of this truss carries no force under these loads. Which is the zero-force member? Click it in the diagram.

B: 10 kN ↓C: 20 kN ↓D: 30 kN ↓H: 10 kN ↓
  1. 1member AB
  2. 2member BC
  3. 3member CD
  4. 4member DE
  5. 5member FG
  6. 6member GH
  7. 7member AF
  8. 8member HE
  9. 9member BF
  10. 10member CG
  11. 11member DH
  12. 12member FC
  13. 13member HC
4.Truss: method of jointsHard
ABBCACACB50 kN15 kN8 m3 m2 m

Use the method of joints to find the force FAC in member AC. Give tension as positive and compression as negative.

span = 8 mheight = 2 mB is 3 m from Avertical load = 50 kNhorizontal load = 15 kN →
FAC = kN
5.Shear force & bending momentMedium
5 kN/m20 kNABCDEFG1 m1 m1 m1 m1 m1 m

The marks A to G split the beam into six equal parts. At which mark is the bending moment largest in size, sagging or hogging? Click it in the diagram.

20 kN @ 4 m5 kN/m, 0–6 m
  1. 1A (x = 0 m)
  2. 2B (x = 1 m)
  3. 3C (x = 2 m)
  4. 4D (x = 3 m)
  5. 5E (x = 4 m)
  6. 6F (x = 5 m)
  7. 7G (x = 6 m)
6.Shear force & bending momentHard
10 kN25 kNABCDEFG2 m2 m2 m2 m2 m2 m

The marks A to G split the beam into six equal parts. At which mark is the bending moment largest in size, sagging or hogging? Click it in the diagram.

10 kN @ 12 m25 kN @ 2 m
  1. 1A (x = 0 m)
  2. 2B (x = 2 m)
  3. 3C (x = 4 m)
  4. 4D (x = 6 m)
  5. 5E (x = 8 m)
  6. 6F (x = 10 m)
  7. 7G (x = 12 m)
7.Beam deflectionMedium
P = 18 kNABδ5 m1 m

A simply supported beam carries a point load P at a = 5 m from support A. Find the deflection δP under the load.

P = 18 kNa = 5 mL = 6 mE = 200 GPa (steel)I = 120 × 10⁶ mm⁴
δP = mm
8.Beam deflectionHard
w = 2 kN/mP = 17 kNδL = 3 m

A simply supported beam carries a uniformly distributed load w and a point load P at midspan. Using superposition, find the midspan deflection δmax.

P = 17 kNw = 2 kN/mL = 3 mE = 200 GPa (steel)I = 57 × 10⁶ mm⁴
δmax = mm
9.Column bucklingMedium
PL = 3 m25 × 60 mmcross-section

A column of length L made of steel is fixed at the base and pinned at the top. Using Euler’s formula, find its critical buckling load Pcr.

L = 3 mE = 200 GPa (steel)b × h = 25 × 60 mm
Pcr = kN
10.Column bucklingHard
PL = 5 md = 80 mmcross-section

A column of length L made of aluminium is fixed at both ends. Find its slenderness and the critical buckling stress σcr from Euler’s formula.

L = 5 mE = 70 GPa (aluminium)d = 80 mm
σcr = MPa
11.Centroid & second moment of areaMedium
1001518010xdimensions in mm

Find the second moment of area Ix of the T-section about the horizontal axis x through its centroid.

bf = 100 mmtf = 15 mmtw = 10 mmhw = 180 mm
Ix = × 10⁶ mm⁴
12.Centroid & second moment of areaHard
120 mm240 mm168 mm80 × 20xIx​ = ?

A 120 mm × 240 mm plate has a rectangular cut-out 80 mm wide and 20 mm high, centred on the vertical centre line with its centre 168 mm above the bottom. Find the second moment of area Ix about the horizontal axis through the centroid.

b = 120 mmh = 240 mmcut-out: 80 × 20 mmhole centre: y = 168 mm
Ix = × 10⁶ mm⁴
13.Effective stress in soilMedium
sandγd​ = 17 kN/m³γsat​ = 19 kN/m³11 mwater tableXz = 5 m

For the soil profile shown, find the vertical effective stress σ′ at point X.

z = 5 mzw = 1 mγw = 9.81 kN/m³sand: γd = 17 kN/m³sand: γsat = 19 kN/m³
σ′ = kPa
14.Effective stress in soilHard
sandγd​ = 15 kN/m³γsat​ = 19 kN/m³3 mclayγsat​ = 18 kN/m³5 mwater tableXz = 5.5 m

For the soil profile shown, find the vertical effective stress σ′ at point X.

z = 5.5 mzw = 2 mγw = 9.81 kN/m³sand: γd = 15 kN/m³sand: γsat = 19 kN/m³clay: γsat = 18 kN/m³
σ′ = kPa
15.Consolidation settlementMedium
Δσ = 55 kPasandclayCc​ = 0.3, Cr​ = 0.05e0​ = 0.95σ′0​ = 95 kPaσ′p​ = 175 kPa5.5 mwater table

A 5.5 m thick overconsolidated clay layer has Cc = 0.3, Cr = 0.05 and e₀ = 0.95. At its mid-depth the effective vertical stress is 95 kPa and the preconsolidation pressure is 175 kPa. A new building adds 55 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.

H = 5.5 mCc = 0.3Cr = 0.05e0 = 0.95σ′0 = 95 kPaσ′p = 175 kPaΔσ = 55 kPa
S = mm
16.Consolidation settlementHard
sandclayH = 10 m10 mimpervious rockwater table

In a laboratory oedometer test, a clay specimen 25 mm thick, drained at the top and bottom, reaches 50% consolidation in 5 min. In the field the same clay forms a layer 10 m thick. It lies on impervious rock, with sand above it, so water drains out only at the top. How many days t does the field layer take to reach 50% consolidation?

hlab = 25 mmtlab = 5 minH = 10 mfield: single drainage
t = days
17.Hydrostatic forceMedium
gated = 2 mH = 2.5 m

A vertical rectangular gate 1.5 m wide sits in the wall of a tank of water, with its top edge 2 m below the surface. Find the resultant hydrostatic force F on the gate.

d = 2 mH = 2.5 mb = 1.5 mρ = 1000 kg/m³g = 9.81 m/s²
F = kN
18.Hydrostatic forceHard
gated = 3 mH = 1.5 m

A vertical rectangular gate 1.5 m wide sits in the wall of a tank of glycerin, with its top edge 3 m below the surface. Find the resultant hydrostatic force F on the gate.

d = 3 mH = 1.5 mb = 1.5 mρ = 1260 kg/m³g = 9.81 m/s²
F = kN
19.Pipe friction & head lossMedium
V = 1.7 m/sD = 100 mmL = 500 mf = 0.025

Water (ρ = 1000 kg/m³) flows at 1.7 m/s through a horizontal pipe, 500 m long, with an inside diameter of 100 mm. Use the Darcy friction factor f = 0.025 and g = 9.81 m/s². Find the pressure drop Δp over the pipe in kPa.

V = 1.7 m/sL = 500 mD = 100 mmf = 0.025ρ = 1000 kg/m³
Δp = kPa
20.Pipe friction & head lossHard
K = 5Δz = 29 mL = 200 m, D = 300 mm, f = 0.0223× bend (K = 0.3)

Two open reservoirs are joined by a pipe 200 m long with an inside diameter of 300 mm and a Darcy friction factor f = 0.022. The water surface of the upper reservoir is 29 m above that of the lower one. The minor losses are a square-edged entrance (K = 0.5), 3 bends (K = 0.3 each), a valve (K = 5) and the exit into the lower reservoir (K = 1.0). Use g = 9.81 m/s². Find the flow rate Q in L/s.

Δz = 29 mL = 200 mD = 300 mmf = 0.022Kentrance = 0.5Kbend = 0.3 (×3)Kvalve = 5Kexit = 1.0
Q = L/s
21.Open-channel flow (Manning)Medium
b = 4.5 my = 2 mn = 0.03, S = 0.0008

A rectangular grass-lined earth channel is 4.5 m wide. Water flows uniformly 2 m deep. Manning n = 0.03 and the bed slope is S = 0.0008. Find the flow rate Q in m³/s.

b = 4.5 my = 2 mn = 0.03S = 0.0008
Q = m³/s
22.Open-channel flow (Manning)Hard
b = 2 my = 1.8 mn = 0.015, Q = 5.7 m³/s

A rectangular brickwork channel 2 m wide must carry 5.7 m³/s in uniform flow at a depth of 1.8 m. Manning n = 0.015. Find the required bed slope S (in m/m).

Q = 5.7 m³/sb = 2 my = 1.8 mn = 0.015
S = m/m
23.Pumps & pump powerMedium
PQ = 40 L/sH = 34 m

In a test, a pump delivers 40 L/s of water (ρ = 1000 kg/m³) against a head of 34 m while its shaft takes 17.8 kW. Use g = 9.81 m/s². Find the pump efficiency η in percent.

Q = 40 L/sH = 34 mPshaft = 17.8 kWg = 9.81 m/s²
η = %
24.Pumps & pump powerHard
PQ = 120 L/sΔz = 15 mL = 400 m, D = 250 mm, f = 0.025, ΣK = 5

A pump moves 120 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 15 m higher. The pipe is 400 m long with an inside diameter of 250 mm and a Darcy friction factor f = 0.025; the minor-loss coefficients add up to ΣK = 5 (entrance and exit included). Use g = 9.81 m/s². The pump efficiency is 85%. Find the shaft power Pshaft in kW.

Q = 120 L/sΔz = 15 mL = 400 mD = 250 mmf = 0.025ΣK = 5η = 85%
Pshaft = kW
25.Time value of moneyMedium
years01234567€12 000FV = ?

You invest €12 000 at a nominal rate of 6% per year, compounded quarterly. Find the value FV of the investment after 7 years.

PV = €12 0006% / 4n = 7
FV = €
26.Time value of moneyHard
months01…36…240€300 000AB = ?A7.2% / 12

A mortgage of €300 000 is repaid with equal monthly payments over 20 years at 7.2% per year, compounded monthly. How much is still owed just after the payment at the end of year 3? Find the outstanding balance B.

P = €300 0007.2% / 12N = 240k = 36
B = €
27.NPV & IRRMedium
years0123−75 00031 00029 00027 000

An investment of €75 000 gives these cash flows at the end of years 1 to 3: €31 000, €29 000, €27 000. The cost of capital is 10%. Find the net present value NPV.

r = 10%CF0 = −75 000CF1 = 31 000CF2 = 29 000CF3 = 27 000
NPV = €
28.NPV & IRRHard
years012−10 0006 0007 500

A project costs €10 000 and returns €6 000, €7 500 at the end of years 1 to 2. Find its internal rate of return IRR in percent.

CF0 = −10 000CF1 = 6 000CF2 = 7 500
IRR = %
29.Normal distributionMedium
100 kg98.5 kgT = X₁ + … + X₄?

The masses of bags of cement are independent and normal with mean 25 kg and standard deviation 0.5 kg. Find the probability P that the total mass of 4 of them is below 98.5 kg. Round z to two decimals.

μ = 25 kgσ = 0.5 kgn = 4< 98.5 kg
P =
30.Normal distributionHard
μ = 500x = ?75%

The battery lifetimes are normally distributed with mean 500 h and standard deviation 40 h. Find the value x below which 75% of them lie (the 75th percentile).

μ = 500σ = 40P = 75%
x = h

3Solutions

1.Beam support reactions

Answer: RA = 18 kN

Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.

P1​ = 15 kNP2​ = 35 kNABRA​RB​2.5 m1 m1.5 m

Free-body diagram

Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.

Equilibrium

Moments about A, counter-clockwise positive. Then vertical force balance.

ΣMA = 0: RB·5 = 15·2.5 + 35·3.5
RB = 160/5 = 32 kN
ΣFy = 0: RA = 50 − 32 = 18 kN

Answer

RA = 18 kN
2.Beam support reactions

Answer: RB = 19.5 kN

Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.

w = 12 kN/mP = 40 kNABRA​RB​1 m0.5 m0.5 m2 m

Free-body diagram

Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.

Equilibrium

Moments about A, counter-clockwise positive. Then vertical force balance.

UDL resultant: W = w·ℓ = 12·1 = 12 kN, acting at x̄ = 1.5 m
ΣMA = 0: RB·4 = 40·1.5 + 12·1·1.5
RB = 78/4 = 19.5 kN
ΣFy = 0: RA = 52 − 19.5 = 32.5 kN

Answer

RB = 19.5 kN
3.Truss: method of joints

Answer: member CG

Zero-force members: at a joint, the forces must balance in every direction. If a joint has no load and no support, and two of its three members are in line, then the balance across that line involves only the third member, so its force is zero. If only two members meet at an unloaded joint and they are not in line, both are zero.

Joint G

FG and GH lie on one straight line and the joint carries no load. Balancing forces across that line leaves only CG.

ΣF⊥ = 0 → FCG = 0

Check with the method of joints

Solving all joints gives these member forces (T = tension, C = compression).

AB: 27.5 kN (T), BC: 27.5 kN (T), CD: 42.5 kN (T), DE: 42.5 kN (T), FG: 45 kN (C), GH: 45 kN (C), AF: 38.89 kN (C), HE: 60.1 kN (C), BF: 10 kN (T), CG: 0, DH: 30 kN (T), FC: 24.75 kN (T), HC: 3.536 kN (T)

Answer

Zero-force member: CG
4.Truss: method of joints

Answer: FAC = 56.25 kN

Method of joints: every pin of a truss is in equilibrium, so ΣFx = 0 and ΣFy = 0 at each joint. Start at a joint with at most two unknown member forces. A negative result means the member is in compression.

ABBCACACB50 kN15 kNAy​Cy​Ax​

Support reactions

Equilibrium of the whole truss. Moments about A, counter-clockwise positive.

ΣMA = 0: Cy·8 = 50·3 + 15·2 → Cy = 22.5 kN
ΣFy = 0: Ay = 50 − 22.5 = 27.5 kN
ΣFx = 0: Ax = −15 kN

Joint C

The roller gives only a vertical reaction, so joint C has just two unknown member forces. Assume both in tension.

sin γ = 2/5.385 = 0.3714, cos γ = 5/5.385 = 0.9285
ΣFy = 0: Cy + FBC·sin γ = 0 → FBC = −22.5/0.3714 = −60.58 kN
ΣFx = 0: −FAC − FBC·cos γ = 0 → FAC = −(−60.58)·0.9285 = 56.25 kN

Answer

FAC = 56.25 kN (tension)
5.Shear force & bending moment

Answer: E (x = 4 m)

Largest bending moment: M changes slope wherever the shear force changes, so its peaks sit where the shear force crosses zero: under a point load, inside a distributed load, or over a support of an overhang. At a fixed support of a cantilever the moment is largest at the wall. Compare the size of M at those places, sagging or hogging.

Support reactions

Take moments about one support, then use the vertical force balance.

R1 = 21.67 kN, R2 = 28.33 kN

Bending moment at every mark

Sum the moments of all forces on one side of the cut. Sagging is positive, hogging negative.

MA = 0, MB = 19.17, MC = 33.33, MD = 42.5, ME = 46.67 kN·m, MF = 25.83, MG = 0

Answer

Mark E: ME = 46.67 kN·m
6.Shear force & bending moment

Answer: B (x = 2 m)

Largest bending moment: M changes slope wherever the shear force changes, so its peaks sit where the shear force crosses zero: under a point load, inside a distributed load, or over a support of an overhang. At a fixed support of a cantilever the moment is largest at the wall. Compare the size of M at those places, sagging or hogging.

Support reactions

Take moments about one support, then use the vertical force balance.

R1 = 18 kN, R2 = 17 kN

Bending moment at every mark

Sum the moments of all forces on one side of the cut. Sagging is positive, hogging negative.

MA = 0, MB = 36 kN·m, MC = 22, MD = 8, ME = −6, MF = −20, MG = 0

Answer

Mark B: MB = 36 kN·m
7.Beam deflection

Answer: δP = 1.042 mm

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).

Consistent units

Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.

P = 18000 N, a = 5000 mm, b = 1000 mm, L = 6000 mm
EI = 2.4 × 10¹³ N·mm²

Deflection under the load

δP = Pa²b²/(3EIL) = 18000·5000²·1000²/(3·2.4 × 10¹³·6000) = 1.042 mm

Answer

δP = 1.042 mm
8.Beam deflection

Answer: δmax = 1.024 mm

Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).

Consistent units

Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.

P = 17000 N, w = 2 N/mm, L = 3000 mm, EI = 1.14 × 10¹³ N·mm²

Each load on its own

δP = PL³/(48EI) = 17000·3000³/(48·1.14 × 10¹³) = 0.8388 mm
δw = 5wL⁴/(384EI) = 5·2·3000⁴/(384·1.14 × 10¹³) = 0.185 mm

Add them

δmax = 0.8388 + 0.185 = 1.024 mm

Answer

δmax = 1.024 mm
9.Column buckling

Answer: Pcr = 34.97 kN

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Smallest second moment of area

A rectangle buckles about its weak axis, using the smaller dimension cubed.

Imin = h·b³/12 = 60·25³/12 = 78125 mm⁴

Effective length

KL = 0.7·3000 = 2100 mm

Critical load

Pcr = π²EI/(KL)² = π²·200000·78125/2100² = 34969 N = 34.97 kN

Answer

Pcr = 34.97 kN
10.Column buckling

Answer: σcr = 44.22 MPa

Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.

Smallest second moment of area

A round section has the same I about every axis.

I = πd⁴/64 = π·80⁴/64 = 2.011 × 10⁶ mm⁴

Radius of gyration and slenderness

A = 5027 mm²
r = √(I/A) = √(2.011 × 10⁶/5027) = 20 mm
KL = 0.5·5000 = 2500 mm
KL/r = 2500/20 = 125

Critical stress

σcr = π²E/(KL/r)² = π²·70000/125² = 44.22 MPa

Answer

σcr = 44.22 MPa
11.Centroid & second moment of area

Answer: Ix = 12.67 × 10⁶ mm⁴

Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.

Split into two rectangles

Measure every y from the bottom edge.

flange: Af = 100·15 = 1500 mm², yf = 180 + 15/2 = 187.5 mm
web: Aw = 10·180 = 1800 mm², yw = 180/2 = 90 mm

Centroid

ȳ = (Afyf + Awyw)/(Af + Aw) = (1500·187.5 + 1800·90)/3300 = 134.3 mm

Parallel-axis theorem

flange: 100·15³/12 + 1500·(187.5 − 134.3)² = 4.271 × 10⁶ mm⁴
web: 10·180³/12 + 1800·(90 − 134.3)² = 8.395 × 10⁶ mm⁴
Ix = 4.271 × 10⁶ + 8.395 × 10⁶ = 1.267 × 10⁷ mm⁴ = 12.67 × 10⁶ mm⁴

Answer

Ix = 12.67 × 10⁶ mm⁴
12.Centroid & second moment of area

Answer: Ix = 134.3 × 10⁶ mm⁴

Sections with holes: treat a hole as a negative area. The centroid is ȳ = (A₁y₁ − A₂y₂)/(A₁ − A₂), with A₁, y₁ for the full plate and A₂, y₂ for the hole. For the second moment of area about the centroidal axis, use the parallel-axis theorem for each part and subtract the hole: I = (Ic1 + A₁d₁²) − (Ic2 + A₂d₂²), where d is the distance from each part's own centroid to the axis through ȳ. A rectangle has Ic = bh³/12 and a circle Ic = πd⁴/64.

Centroid

ȳ = (28800·120 − 1600·168)/(28800 − 1600) = 117.2 mm

Full plate about ȳ

120·240³/12 + 28800·2.824² = 138.5 × 10⁶ mm⁴

Hole about ȳ

80·20³/12 + 1600·50.82² = 4.186 × 10⁶ mm⁴

Subtract

Ix = 134.3 × 10⁶ mm⁴

Answer

Ix = 134.3 × 10⁶ mm⁴
13.Effective stress in soil

Answer: σ′ = 53.76 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Total stress

Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.

σ = γd·zw + γsat·(z − zw) = 17·1 + 19·4 = 93 kPa

Pore water pressure

Water pressure grows with depth below the water table.

u = γw·(z − zw) = 9.81·4 = 39.24 kPa

Effective stress

σ′ = σ − u = 93 − 39.24 = 53.76 kPa

Answer

σ′ = 53.76 kPa
14.Effective stress in soil

Answer: σ′ = 59.66 kPa

Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).

Total stress

Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.

σ = γd·2 + γsat,sand·1 + γsat,clay·2.5
σ = 15·2 + 19·1 + 18·2.5 = 94 kPa

Pore water pressure

Water pressure grows with depth below the water table.

u = γw·(z − zw) = 9.81·3.5 = 34.34 kPa

Effective stress

σ′ = σ − u = 94 − 34.34 = 59.66 kPa

Answer

σ′ = 59.66 kPa
15.Consolidation settlement

Answer: S = 27.97 mm

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Compare with the preconsolidation pressure

σ′f = 95 + 55 = 150 kPa ≤ 175 kPa

Settlement

The clay stays on its recompression line.

S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0) = 0.05·5.5/(1 + 0.95)·log₁₀(150/95) = 27.97 mm

Answer

S = 27.97 mm
16.Consolidation settlement

Answer: t = 2222 days

Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.

Drainage paths

Hdr,lab = 25/2 = 12.5 mm = 0.0125 m
Hdr,field = 10 m

Scale the time

t = Tv·Hdr²/cv with the same T_v and cv in the lab and the field.

tfield = 5·(10/0.0125)² = 3.2 × 10⁶ min
tfield = 3.2 × 10⁶/1440 = 2222 days

Answer

t = 2222 days
17.Hydrostatic force

Answer: F = 119.6 kN

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 2 + 2.5/2 = 3.25 m
A = H·b = 2.5·1.5 = 3.75 m²
gated = 2 mH = 2.5 mF

Resultant force

F = ρ·g·yc·A = 1000·9.81·3.25·3.75 = 119.6 kN

Answer

F = 119.6 kN
18.Hydrostatic force

Answer: F = 104.3 kN

Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.

Centroid depth and area

yc = d + H/2 = 3 + 1.5/2 = 3.75 m
A = H·b = 1.5·1.5 = 2.25 m²
gated = 3 mH = 1.5 mF

Resultant force

F = ρ·g·yc·A = 1260·9.81·3.75·2.25 = 104.3 kN

Answer

F = 104.3 kN
19.Pipe friction & head loss

Answer: Δp = 180.6 kPa

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Head loss

hf = f·(L/D)·V²/(2g) = 0.025·(500/0.1)·1.7²/(2·9.81) = 18.41 m

Pressure drop

The pipe is horizontal and the velocity does not change, so the energy equation reduces to Δp = ρ·g·hf.

Δp = ρ·g·hf = 1000·9.81·18.41 = 180625 Pa = 180.6 kPa

Answer

Δp = 180.6 kPa
20.Pipe friction & head loss

Answer: Q = 358.9 L/s

Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.

Loss coefficients

f·L/D = 0.022·200/0.3 = 14.67
ΣK = 0.5 + 3·0.3 + 5 + 1.0 = 7.4

Energy equation

Both surfaces are open to the air and practically at rest, so all of Δz is lost in the pipe.

29 = (14.67 + 7.4)·V²/(2·9.81)
V = √(2·9.81·29/22.07) = 5.078 m/s

Flow rate

Q = V·π·D²/4 = 5.078·0.07069 = 0.3589 m³/s = 358.9 L/s

Answer

Q = 358.9 L/s
21.Open-channel flow (Manning)

Answer: Q = 8.815 m³/s

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Geometry

A = b·y = 4.5·2 = 9 m²
P = b + 2y = 4.5 + 2·2 = 8.5 m
R = A/P = 1.059 m

Velocity

V = (1/0.03)·1.0592/3·0.00081/2 = 0.9794 m/s

Flow rate

Q = A·V = 9·0.9794 = 8.815 m³/s

Answer

Q = 8.815 m³/s
22.Open-channel flow (Manning)

Answer: S = 0.001017 m/m

Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.

Geometry

A = b·y = 2·1.8 = 3.6 m²
P = b + 2y = 2 + 2·1.8 = 5.6 m
R = A/P = 0.6429 m

Solve Manning for S

S1/2 = n·Q/(A·R2/3) = 0.015·5.7/(3.6·0.7449) = 0.03189
S = 0.03189² = 0.001017

Answer

S = 0.001017

That is a fall of 1.017 m per kilometre.

23.Pumps & pump power

Answer: η = 74.95 %

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Hydraulic power

Ph = ρ·g·Q·H = 1000·9.81·0.04·34 = 13.34 kW

Efficiency

η = Ph/Pshaft = 13.34/17.8 = 74.95%

Answer

η = 74.95%
24.Pumps & pump power

Answer: Pshaft = 39.76 kW

Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.

Velocity

V = Q/A = 0.12/0.04909 = 2.445 m/s
V²/(2g) = 0.3046 m

Head losses

hL = (f·L/D + ΣK)·V²/(2g) = (40 + 5)·0.3046 = 13.71 m

Pump head

H = Δz + hL = 15 + 13.71 = 28.71 m

Shaft power

Pshaft = ρ·g·Q·H/η = 1000·9.81·0.12·28.71/0.85 = 39.76 kW

Answer

Pshaft = 39.76 kW
25.Time value of money

Answer: FV = 18207 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Rate and number of periods

i = r/m = 0.06/4 = 0.015
N = m·n = 4·7 = 28

Future value

FV = 12 000·(1 + 0.015)28 = 12 000·1.517 = €18 206.67

Answer

FV = €18 206.67
26.Time value of money

Answer: B = 277490 €

Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.

Monthly payment

i = 0.006, N = 240
A = 300 000·0.006/(1 − (1 + 0.006)−240) = €2 362.05

Present value of the remaining payments

Whatever is still owed must be exactly paid off by the remaining payments.

N − k = 240 − 36 = 204
B = 2362·(1 − (1 + 0.006)−204)/0.006 = €277 489.83

Answer

B = €277 489.83
27.NPV & IRR

Answer: NPV = −2566 €

Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.

Present value of each cash flow

CF0 = −75 000
CF1/(1 + 0.1)1 = 31 000/1.1 = 28 181.82
CF2/(1 + 0.1)2 = 29 000/1.21 = 23 966.94
CF3/(1 + 0.1)3 = 27 000/1.331 = 20 285.50

Add them up

NPV = €−2 565.74

Answer

NPV = €−2 565.74

NPV is negative, so the project earns less than the required return.

28.NPV & IRR

Answer: IRR = 21.65 %

Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.

Bracket the IRR

NPV falls as the rate rises, so the IRR lies between a rate with positive NPV and one with negative NPV.

NPV(20%) = 208.33
NPV(25%) = −400.00

Narrow down

Linear interpolation gives a first estimate; repeating it (or a calculator's IRR function) gives the exact rate.

IRR ≈ 20 + 5·208.33/(208.33 − (−400.00)) = 21.71%
exact: NPV(21.65%) = 0 → IRR = 21.65%

Answer

IRR = 21.65%
29.Normal distribution

Answer: P = 0.06681

Sums and differences of normal variables: if X and Y are independent and normal, X + Y and X − Y are normal too. Means add or subtract: E(X ± Y) = μX ± μY. Variances always add, also for a difference: Var(X ± Y) = σX² + σY², so σ = √(σX² + σY²). Standard deviations never add directly. The total of n independent items with the same distribution has mean n·μ and standard deviation σ·√n. Then standardise as usual: z = (x − mean)/σ and read Φ(z).

Distribution of the total

μT = 100 kg, σT = 0.5·√4 = 1 kg

Standardise

z = (98.5 − 100)/1 = −1.5

Probability

P = Φ(−1.5) = 0.06681

Answer

P = 0.06681
30.Normal distribution

Answer: x = 527 h

Normal distribution: convert a value x to a z-score, z = (x − μ)/σ, which counts standard deviations from the mean. A z-table (or Φ(z)) gives the area to the left of z, which is P(X < x). The area to the right is 1 − Φ(z), and the area between two values is the difference of their two areas.

z for the percentile

Φ(z) = 0.75 → z = 0.6745

Back to x

x = 500 + 0.6745·40 = 526.98 h

Answer

x = 526.98 h

This is independent practice material. ExamProblems is not affiliated with or endorsed by the organisation that runs this exam, and the exam name is used only to describe the content. The FE exam is run by NCEES, which is not affiliated with ExamProblems and does not endorse it.