laminar below Re ≈ 2000, turbulent above Re ≈ 4000
Mean velocity
V = Q/A, A = π·D²/4
Darcy–Weisbach
hf = f·(L/D)·V²/(2g)
Minor losses
hm = ΣK·V²/(2g)
Typical K values
entrance 0.5, exit 1.0, 90° bend ≈ 0.3
Pressure drop
Δp = ρ·g·hf
Two open reservoirs
Δz = (f·L/D + ΣK)·V²/(2g)
Free outlet
H = (1 + f·L/D + ΣK)·V²/(2g)
Open-channel flow (Manning)
Manning equation
V = (1/n)·R2/3·S1/2
Flow rate
Q = A·V
Hydraulic radius
R = A/P (P = wetted perimeter, free surface excluded)
Rectangle
A = b·y, P = b + 2y
Trapezoid (side slope z:1)
A = (b + z·y)·y, P = b + 2y·√(1 + z²)
Circular pipe, full or half full
R = D/4
Required slope
S = (n·Q/(A·R2/3))²
Pumps & pump power
Hydraulic power
Ph = ρ·g·Q·H = Q·Δp
Shaft power
Pshaft = Ph/ηpump
Electrical power
Pel = Pshaft/ηmotor
Pump head
H = Δz + Δp/(ρ·g) + hL
System losses
hL = (f·L/D + ΣK)·V²/(2g)
Time value of money
Future value
FV = PV·(1 + i)n
Present value
PV = FV/(1 + i)n
Several periods per year
i = r/m, N = m·n
Annuity, present value
PV = PMT·[1 − (1 + i)−n]/i
Annuity, future value
FV = PMT·[(1 + i)n − 1]/i
Method
Draw a timeline with every cash flow and its timing.
Match the rate to the period: a monthly rate for monthly payments.
Use FV = PV·(1 + i)ⁿ for single amounts and the annuity formulas for equal payments.
Check the sign and the order of magnitude of the answer.
NPV & IRR
Net present value
NPV = −C0 + Σ CFt/(1 + r)t
Equal cash flows
NPV = −C0 + CF·[1 − (1 + r)−n]/r
Internal rate of return
the r at which NPV = 0
Decision
accept when NPV > 0 (or IRR > required return)
Method
List all cash flows with their year; the investment at year 0 is negative.
Discount each cash flow: CFt/(1 + r)t.
Add them up to get the NPV. Positive means the project earns more than r.
For the IRR, find the rate that makes NPV zero by trial or interpolation.
Normal distribution
z-score
z = (x − μ)/σ
Below x
P(X < x) = Φ(z)
Above x
P(X > x) = 1 − Φ(z)
Between
Φ(z2) − Φ(z1)
Percentile
x = μ + z·σ
Method
Convert the value to a z-score: z = (x − μ)/σ.
Look up Φ(z), the area to the left of z.
For the area to the right use 1 − Φ(z); for an interval subtract the two left areas.
For a percentile, work backwards: find z for the area, then x = μ + z·σ.
2Practice problems
1.Beam support reactionsMedium
The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RB.
L = 8 mP1 = 60 kN at 1 mP2 = 25 kN at 2 m
RB = kN
2.Beam support reactionsHard
The simply supported beam has a pin at A and a roller at B. Find the vertical support reaction RA.
L = 4 mP = 35 kN at 3 mw = 12 kN/m from 1 to 4 m
RA = kN
3.Truss: method of jointsMedium
Use the method of joints to find the force FAB in member AB. Give tension as positive and compression as negative.
span = 8 mheight = 2 mB is 3 m from Avertical load = 60 kN
FAB = kN
4.Truss: method of jointsHard
Use the method of joints to find the force FAC in member AC. Give tension as positive and compression as negative.
span = 5 mheight = 2 mB is 4 m from Avertical load = 20 kNhorizontal load = 20 kN →
FAC = kN
5.Shear force & bending momentMedium
The simply supported beam carries a clockwise couple M0 = 40 kN·m at x = 1 m from A, and no other load. Find the bending moment Mx just to the left of the couple. Use sagging moments positive and upward shear on the left face positive.
L = 8 mM0 = 40 kN·m clockwise, at 1 m
Mx = kN·m
6.Shear force & bending momentHard
The simply supported beam carries a uniformly distributed load over part of its span. Find the maximum bending moment Mmax in the beam.
L = 10 mw = 6 kN/m from 0 to 9 m
Mmax = kN·m
7.Beam deflectionMedium
A simply supported beam carries a uniformly distributed load w over its whole span. Find the maximum deflection δmax, at midspan.
w = 10 kN/mL = 3 mE = 70 GPa (aluminium)I = 12 × 10⁶ mm⁴
δmax = mm
8.Beam deflectionHard
A simply supported beam carries a uniformly distributed load w. Its deflection may not exceed span/360. Find the smallest second moment of area Ireq that meets this limit.
w = 2 kN/mL = 3 mE = 200 GPa (steel)
Ireq = × 10⁶ mm⁴
9.Column bucklingMedium
A column of length L made of aluminium is fixed at the base and pinned at the top. Using Euler’s formula, find its critical buckling load Pcr.
L = 2.5 mE = 70 GPa (aluminium)d = 60 mm
Pcr = kN
10.Column bucklingHard
A column of length L made of aluminium is pinned at both ends. Find its slenderness and the critical buckling stress σcr from Euler’s formula.
L = 4 mE = 70 GPa (aluminium)d = 50 mm
σcr = MPa
11.Centroid & second moment of areaMedium
Find the second moment of area Ix of the T-section about the horizontal axis x through its centroid.
bf = 280 mmtf = 10 mmtw = 20 mmhw = 240 mm
Ix = × 10⁶ mm⁴
12.Centroid & second moment of areaHard
The T-section is used as a beam with the flange on top and carries a sagging bending moment of 10 kN·m. Find the size of the bending stress σtop at the top edge.
A 5 m thick overconsolidated clay layer has Cc = 0.35, Cr = 0.03 and e₀ = 1. At its mid-depth the effective vertical stress is 110 kPa and the preconsolidation pressure is 160 kPa. A new building adds 10 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.
In a laboratory oedometer test, a clay specimen 19 mm thick, drained at the top and bottom, reaches 50% consolidation in 5 min. In the field the same clay forms a layer 6.5 m thick. It lies on impervious rock, with sand above it, so water drains out only at the top. How many days t does the field layer take to reach 50% consolidation?
A vertical rectangular gate 3 m wide sits in the wall of a tank of water, with its top edge 0.5 m below the surface. Find the resultant hydrostatic force F on the gate.
A vertical rectangular gate 1.5 m wide sits in the wall of a tank of glycerin, with its top edge 1 m below the surface. Find the depth ycp of the centre of pressure below the surface.
Water (ρ = 1000 kg/m³) flows at 1.6 m/s through a horizontal pipe, 1000 m long, with an inside diameter of 75 mm. Use the Darcy friction factor f = 0.028 and g = 9.81 m/s². Find the pressure drop Δp over the pipe in kPa.
Two open reservoirs are joined by a pipe 400 m long with an inside diameter of 200 mm and a Darcy friction factor f = 0.015. The minor losses are a square-edged entrance (K = 0.5), 4 bends (K = 0.3 each), a valve (K = 2) and the exit into the lower reservoir (K = 1.0). Use g = 9.81 m/s². What difference in water level Δz between the reservoirs gives a flow rate of 75 L/s?
A trapezoidal unfinished concrete channel has a bottom width of 6 m and side slopes of 1:1 (horizontal:vertical). Water flows uniformly 2 m deep. Manning n = 0.014 and the bed slope is S = 0.004. Find the flow rate Q in m³/s.
b = 6 my = 2 mz = 1n = 0.014S = 0.004
Q = m³/s
22.Open-channel flow (Manning)Hard
A concrete sewer with an inside diameter of 450 mm (Manning n = 0.013) must reach a self-cleansing velocity of 0.6 m/s when flowing just full. Find the minimum slope S (in m/m).
D = 450 mmn = 0.013V = 0.6 m/s
S = m/m
23.Pumps & pump powerMedium
A pump delivers 100 L/s of water (ρ = 1000 kg/m³) against a head of 54 m. The pump efficiency is 70% and the electric motor driving it has an efficiency of 92%. Use g = 9.81 m/s². Find the electrical power Pel the motor draws, in kW.
A pump moves 50 L/s of water (ρ = 1000 kg/m³) from an open lower reservoir to an upper tank whose water surface is 8 m higher. The pipe is 300 m long with an inside diameter of 200 mm and a Darcy friction factor f = 0.022; the minor-loss coefficients add up to ΣK = 5 (entrance and exit included). Use g = 9.81 m/s². The upper tank is closed and the air above its water is at a gauge pressure of 150 kPa. Find the head H the pump must add.
You invest €10 000 at 6% per year with continuous compounding. Find the value FV after 4 years.
PV = €10 000r = 6%t = 4
FV = €
26.Time value of moneyHard
You deposit €5 000 at the start of every year for 29 years, the first deposit today. The account pays 6% per year. How much is in the account at the end of year 29? Find FV.
A = €5 000i = 6%n = 29
FV = €
27.NPV & IRRMedium
An investment of €30 000 gives these cash flows at the end of years 1 to 3: €11 000, €11 000, €10 000. The cost of capital is 12%. Find the net present value NPV.
A project costs €25 000 and returns €14 000, €16 000, €13 000 at the end of years 1 to 3. Find its internal rate of return IRR in percent.
CF0 = −25 000CF1 = 14 000CF2 = 16 000CF3 = 13 000
IRR = %
29.Normal distributionMedium
The masses of passengers with luggage are independent and normal with mean 85 kg and standard deviation 12 kg. Find the probability P that the total mass of 9 of them is below 819 kg. Round z to two decimals.
μ = 85 kgσ = 12 kgn = 9< 819 kg
P =
30.Normal distributionHard
The bag weights are normally distributed with mean 250 g and standard deviation 5 g. Drag the cut-off so the shaded bottom 60% is to the left of it. Find the cut-off x.
μ = 250 gσ = 5 g60%
x = g
3Solutions
1.Beam support reactions
Answer: RB = 13.75 kN
Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.
Free-body diagram
Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.
Equilibrium
Moments about A, counter-clockwise positive. Then vertical force balance.
ΣMA = 0: RB·8 = 60·1 + 25·2
RB = 110/8 = 13.75 kN
ΣFy = 0: RA = 85 − 13.75 = 71.25 kN
Answer
RB = 13.75 kN
2.Beam support reactions
Answer: RA = 22.25 kN
Static equilibrium: a body at rest has ΣFx = 0, ΣFy = 0 and ΣM = 0 about any point. Taking moments about one support removes that support’s reaction from the equation.
Free-body diagram
Replace the supports with reaction forces. A roller gives one vertical reaction; with only vertical loads the pin gives one vertical reaction too.
Equilibrium
Moments about A, counter-clockwise positive. Then vertical force balance.
UDL resultant: W = w·ℓ = 12·3 = 36 kN, acting at x̄ = 2.5 m
ΣMA = 0: RB·4 = 35·3 + 12·3·2.5
RB = 195/4 = 48.75 kN
ΣFy = 0: RA = 71 − 48.75 = 22.25 kN
Answer
RA = 22.25 kN
3.Truss: method of joints
Answer: FAB = −67.6 kN
Method of joints: every pin of a truss is in equilibrium, so ΣFx = 0 and ΣFy = 0 at each joint. Start at a joint with at most two unknown member forces. A negative result means the member is in compression.
Support reactions
Equilibrium of the whole truss. Moments about A, counter-clockwise positive.
ΣMA = 0: Cy·8 = 60·3 → Cy = 22.5 kN
ΣFy = 0: Ay = 60 − 22.5 = 37.5 kN
Joint A
Assume every member is in tension (pulling away from the joint). Only AB has a vertical component at A.
sin α = 2/3.606 = 0.5547
ΣFy = 0: Ay + FAB·sin α = 0
FAB = −37.5/0.5547 = −67.6 kN
Answer
FAB = −67.6 kN (compression)
4.Truss: method of joints
Answer: FAC = 12 kN
Method of joints: every pin of a truss is in equilibrium, so ΣFx = 0 and ΣFy = 0 at each joint. Start at a joint with at most two unknown member forces. A negative result means the member is in compression.
Support reactions
Equilibrium of the whole truss. Moments about A, counter-clockwise positive.
ΣMA = 0: Cy·5 = 20·4 + 20·2 → Cy = 24 kN
ΣFy = 0: Ay = 20 − 24 = −4 kN
ΣFx = 0: Ax = −20 kN
Joint C
The roller gives only a vertical reaction, so joint C has just two unknown member forces. Assume both in tension.
sin γ = 2/2.236 = 0.8944, cos γ = 1/2.236 = 0.4472
Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut. An applied couple makes the bending moment diagram jump by the size of the couple.
Support reactions
Moments about A, counter-clockwise positive: RB·L − M0 = 0. Vertical balance: RA + RB = 0.
RB = M0/L = 40/8 = 5 kN (upward)
RA = −RB = −5 kN (downward)
Cut just left of the couple
The left part contains only RA.
Mx = RA·a = −5·1 = −5 kN·m
Answer
Mx = −5 kN·m
6.Shear force & bending moment
Answer: Mmax = 73.51 kN·m
Method of sections: cut the beam where you want the internal forces and keep one side. The shear force V balances the vertical forces on that side, and the bending moment M balances their moments about the cut. Maximum moment: since dM/dx = V, the bending moment has its peak where the shear force passes through zero, either at a point load or inside a distributed load.
Support reactions
Equilibrium of the whole beam.
UDL resultant: W = w·ℓ = 6·9 = 54 kN, acting at x̄ = 4.5 m
ΣMA = 0: RB·10 = 6·9·4.5
RB = 243/10 = 24.3 kN
ΣFy = 0: RA = 54 − 24.3 = 29.7 kN
Zero shear
The shear force starts at RA, stays constant over any unloaded part and falls with slope w inside the load.
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).
Consistent units
Work in N and mm: P in N, w in N/mm (kN/m = N/mm), L in mm, E in N/mm² (GPa × 1000), I in mm⁴.
w = 10 N/mm, L = 3000 mm
EI = 8.4 × 10¹¹ N·mm²
Deflection
δmax = 5wL⁴/(384EI) = 5·10·3000⁴/(384·8.4 × 10¹¹) = 12.56 mm
Answer
δmax = 12.56 mm
8.Beam deflection
Answer: Ireq = 1.266 × 10⁶ mm⁴
Beam deflection: deflections come from integrating the curvature M/(EI) twice. Standard cases are tabulated, for example PL³/(3EI) for a cantilever with an end load and 5wL⁴/(384EI) for a simply supported beam under a full uniform load. Deflections from separate loads add (superposition).
Deflection limit
δallow = L/360 = 3000/360 = 8.333 mm
Required second moment of area
I = 5wL⁴/(384·E·δallow) = 5·2·3000⁴/(384·200000·8.333) = 1.266 × 10⁶ mm⁴
Ireq = 1.266 × 10⁶ mm⁴
Answer
Ireq = 1.266 × 10⁶ mm⁴
9.Column buckling
Answer: Pcr = 143.5 kN
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Euler buckling: a slender column becomes unstable at Pcr = π²EI/(KL)², where KL is the effective length: K = 1 for pinned–pinned, 2 for fixed–free, 0.7 for fixed–pinned and 0.5 for fixed–fixed. It buckles about the axis with the smallest I. The formula holds for slender columns, whose critical stress stays below the yield stress.
Smallest second moment of area
A round section has the same I about every axis.
I = πd⁴/64 = π·50⁴/64 = 306796 mm⁴
Radius of gyration and slenderness
A = 1963 mm²
r = √(I/A) = √(306796/1963) = 12.5 mm
KL = 1·4000 = 4000 mm
KL/r = 4000/12.5 = 320
Critical stress
σcr = π²E/(KL/r)² = π²·70000/320² = 6.747 MPa
Answer
σcr = 6.747 MPa
11.Centroid & second moment of area
Answer: Ix = 50.69 × 10⁶ mm⁴
Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.
Split into two rectangles
Measure every y from the bottom edge.
flange: Af = 280·10 = 2800 mm², yf = 240 + 10/2 = 245 mm
Composite areas: split the section into rectangles. The centroid is the area-weighted average ȳ = ΣAᵢyᵢ/ΣAᵢ. The second moment of area about the centroidal axis adds each part’s own bh³/12 and its parallel-axis term A·d², where d is the distance from the part’s centroid to the overall centroid. Bending stress is σ = M·y/I.
Split into two rectangles
Measure every y from the bottom edge.
flange: Af = 240·20 = 4800 mm², yf = 200 + 20/2 = 210 mm
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Total stress
Add the weight of each soil band above X. Above the water table use the dry unit weight, below it the saturated one.
Water pressure grows with depth below the water table.
u = γw·(z − zw) = 9.81·8 = 78.48 kPa
Effective stress
σ′ = σ − u = 172 − 78.48 = 93.52 kPa
Answer
σ′ = 93.52 kPa
14.Effective stress in soil
Answer: u = 49.05 kPa
Effective stress (Terzaghi): the soil skeleton carries σ′ = σ − u. The total stress σ is the weight of everything above the point, Σγ·h, using the dry unit weight above the water table and the saturated unit weight below it. Below the water table the pore water pressure is hydrostatic: u = γw·(depth below the water table).
Pore water pressure
Water pressure grows with depth below the water table.
u = γw·(z − zw) = 9.81·5 = 49.05 kPa
Answer
u = 49.05 kPa
15.Consolidation settlement
Answer: S = 2.834 mm
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Compare with the preconsolidation pressure
σ′f = 110 + 10 = 120 kPa ≤ 160 kPa
Settlement
The clay stays on its recompression line.
S = Cr·H/(1 + e0)·log₁₀(σ′f/σ′0) = 0.03·5/(1 + 1)·log₁₀(120/110) = 2.834 mm
Answer
S = 2.834 mm
16.Consolidation settlement
Answer: t = 1626 days
Primary consolidation of a clay layer of thickness H, using the effective stress at the middle of the layer: σ′f = σ′0 + Δσ. Normally consolidated clay: S = Cc·H/(1 + e0)·log₁₀(σ′f/σ′0). Overconsolidated clay recompresses along Cr up to the preconsolidation pressure σ′p and follows Cc only beyond it. Time: t = Tv·Hdr²/cv, where the drainage path Hdr is H/2 when water can leave at the top and bottom, and H when only one side drains.
Drainage paths
Hdr,lab = 19/2 = 9.5 mm = 0.0095 m
Hdr,field = 6.5 m
Scale the time
t = Tv·Hdr²/cv with the same T_v and cv in the lab and the field.
tfield = 5·(6.5/0.0095)² = 2.341 × 10⁶ min
tfield = 2.341 × 10⁶/1440 = 1626 days
Answer
t = 1626 days
17.Hydrostatic force
Answer: F = 176.6 kN
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 0.5 + 3/2 = 2 m
A = H·b = 3·3 = 9 m²
Resultant force
F = ρ·g·yc·A = 1000·9.81·2·9 = 176.6 kN
Answer
F = 176.6 kN
18.Hydrostatic force
Answer: ycp = 2.8 m
Hydrostatic force on a plane surface: F = ρ·g·yc·A. It acts at the centre of pressure, ycp = yc + Ic/(ycA), which always lies below the centroid.
Centroid depth and area
yc = d + H/2 = 1 + 3/2 = 2.5 m
A = H·b = 3·1.5 = 4.5 m²
Resultant force
F = ρ·g·yc·A = 1260·9.81·2.5·4.5 = 139.1 kN
Centre of pressure
Pressure grows with depth, so the resultant acts below the centroid.
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Head loss
hf = f·(L/D)·V²/(2g) = 0.028·(1000/0.075)·1.6²/(2·9.81) = 48.71 m
Pressure drop
The pipe is horizontal and the velocity does not change, so the energy equation reduces to Δp = ρ·g·hf.
Pipe flow: the Reynolds number Re = V·D/ν = ρ·V·D/μ tells laminar flow (Re below about 2000) from turbulent flow (above about 4000). Friction along a pipe costs the Darcy–Weisbach head loss hf = f·(L/D)·V²/(2g). Fittings, valves, the entrance and the exit add minor losses hm = ΣK·V²/(2g). Between two open reservoir surfaces the energy equation gives Δz = hf + hm, with the exit loss K = 1 included.
Velocity
V = Q/A = 0.075/0.03142 = 2.387 m/s
V²/(2g) = 0.2905 m
Loss coefficients
f·L/D = 0.015·400/0.2 = 30
ΣK = 0.5 + 4·0.3 + 2 + 1.0 = 4.7
Total head loss
hf = 30·0.2905 = 8.715 m
hm = 4.7·0.2905 = 1.365 m
Δz = hf + hm = 10.08 m
Answer
Δz = 10.08 m
21.Open-channel flow (Manning)
Answer: Q = 89.27 m³/s
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Geometry
A = (b + z·y)·y = (6 + 1·2)·2 = 16 m²
P = b + 2y·√(1 + z²) = 6 + 2·2·√(1 + 1²) = 11.66 m
R = A/P = 1.373 m
Velocity
V = (1/0.014)·1.3732/3·0.0041/2 = 5.579 m/s
Flow rate
Q = A·V = 16·5.579 = 89.27 m³/s
Answer
Q = 89.27 m³/s
22.Open-channel flow (Manning)
Answer: S = 0.00112 m/m
Manning’s equation (SI): for uniform flow in an open channel V = (1/n)·R2/3·S1/2 and Q = A·V, with n the roughness coefficient, S the bed slope (m/m) and R = A/P the hydraulic radius: flow area divided by wetted perimeter. Only the boundary in contact with the water counts in P, not the free surface. Rectangle: A = b·y, P = b + 2y. Trapezoid with side slopes z:1 (horizontal:vertical): A = (b + z·y)·y, P = b + 2y·√(1 + z²). A circular pipe flowing full or half full has R = D/4.
Hydraulic radius
R = D/4 = 0.45/4 = 0.1125 m
Solve Manning for S
S = (n·V/R2/3)² = (0.013·0.6/0.233)² = 0.00112
Answer
S = 0.00112
That is a fall of 1.12 m per kilometre.
23.Pumps & pump power
Answer: Pel = 82.26 kW
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Hydraulic power
Ph = ρ·g·Q·H = 1000·9.81·0.1·54 = 52.97 kW
Shaft power
Pshaft = 52.97/0.7 = 75.68 kW
Electrical power
Pel = 75.68/0.92 = 82.26 kW
Answer
Pel = 82.26 kW
24.Pumps & pump power
Answer: H = 28.2 m
Pump power: the power given to the water is the hydraulic power Ph = ρ·g·Q·H = Q·Δp. The shaft must deliver more because the pump loses some: Pshaft = Ph/ηpump, and the motor draws Pel = Pshaft/ηmotor. The pump head H follows from the energy equation: static lift + pressure head + all friction and minor losses.
Both surfaces are practically at rest, so there is no velocity head term.
H = Δz + p/(ρ·g) + hL = 8 + 15.29 + 4.906 = 28.2 m
Answer
H = 28.2 m
25.Time value of money
Answer: FV = 12712 €
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
Exponent
r·t = 0.06·4 = 0.24
e0.24 = 1.271
Future value
FV = 10 000·1.271 = €12 712.49
Answer
FV = €12 712.49
26.Time value of money
Answer: FV = 390291 €
Time value of money: money today is worth more than the same amount later, because it can earn interest. With interest rate i per period, an amount grows as FV = PV·(1 + i)n. A series of equal payments (an annuity) is valued by adding up each payment, which gives the annuity formulas.
Ordinary annuity factor
((1 + 0.06)29 − 1)/0.06 = 73.64
Annuity due
Each deposit is invested one year longer.
FV = 5 000·73.64·1.06 = €390 290.93
Answer
FV = €390 290.93
27.NPV & IRR
Answer: NPV = −4292 €
Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.
Present value of each cash flow
CF0 = −30 000
CF1/(1 + 0.12)1 = 11 000/1.12 = 9 821.43
CF2/(1 + 0.12)2 = 11 000/1.254 = 8 769.13
CF3/(1 + 0.12)3 = 10 000/1.405 = 7 117.80
Add them up
NPV = €−4 291.64
Answer
NPV = €−4 291.64
NPV is negative, so the project earns less than the required return.
28.NPV & IRR
Answer: IRR = 33.29 %
Net present value: discount every cash flow back to today with the required rate of return r, then add them up: NPV = Σ CFₜ/(1 + r)ᵗ. A project with NPV > 0 earns more than r and adds value. The internal rate of return (IRR) is the rate at which NPV = 0.
Bracket the IRR
NPV falls as the rate rises, so the IRR lies between a rate with positive NPV and one with negative NPV.
NPV(30%) = 1 153.85
NPV(35%) = −566.73
Narrow down
Linear interpolation gives a first estimate; repeating it (or a calculator's IRR function) gives the exact rate.
Sums and differences of normal variables: if X and Y are independent and normal, X + Y and X − Y are normal too. Means add or subtract: E(X ± Y) = μX ± μY. Variances always add, also for a difference: Var(X ± Y) = σX² + σY², so σ = √(σX² + σY²). Standard deviations never add directly. The total of n independent items with the same distribution has mean n·μ and standard deviation σ·√n. Then standardise as usual: z = (x − mean)/σ and read Φ(z).
Distribution of the total
μT = 765 kg, σT = 12·√9 = 36 kg
Standardise
z = (819 − 765)/36 = 1.5
Probability
P = Φ(1.5) = 0.9332
Answer
P = 0.9332
30.Normal distribution
Answer: x = 251.3 g
From an area back to z: Φ(z) is the area to the left of z. For a left-tail area A, find z with Φ(z) = A in the table. A right-tail area A means Φ(z) = 1 − A. A central area A between −z and z leaves (1 − A)/2 in each tail, so Φ(z) = (1 + A)/2. For a value x, use x = μ + zσ.
Area to the left
Φ(z) = 0.6
z from the table
z ≈ 0.25
Back to the original units
x = 250 + 0.25·5 = 251.3 g
Answer
x = 251.3 g