A load takes 24.5 kW of real power and 16 kvar of reactive power (lagging). Find the power factor cos φ.
AC power & power factor worksheet with answers
A single-phase load connected to a 120 V supply takes 20 kW and 9 kvar. Find the current I drawn from the supply.
A single-phase motor takes 28 kW at a power factor of 0.75 lagging from a 230 V supply. Find the reactive power Q it draws.
Two loads are connected in parallel to a 230 V single-phase supply: a 2 kW load at a power factor of 0.85 lagging and a 27 kW load at a power factor of 0.9 lagging. Find the overall power factor cos φ seen by the supply.
A single-phase load takes 15 kW at a power factor of 0.65 lagging from a 230 V, 60 Hz supply. A capacitor connected in parallel raises the power factor to 0.9. Find the capacitance C needed.
A single-phase load takes 40 kW at a power factor of 0.7 lagging from a 230 V, 60 Hz supply. A capacitor connected in parallel raises the power factor to 0.9. Find the capacitance C needed.
Answer key
- 1. cos φ = 0.8373
- 2. I = 182.8 A
- 3. Q = 24.69 kvar
- 4. cos φ = 0.8967
- 5. C = 515.1 µF
- 6. C = 1075 µF
Full step-by-step solutions: practise this topic on examproblems.com.