A 3.5 m thick layer of normally consolidated clay (Cc = 0.6, e₀ = 1.2) has an effective vertical stress of 110 kPa at its mid-depth. A wide fill raises the vertical stress in the clay by 110 kPa. Treat the layer as one sublayer with the stresses at its mid-depth. Find the primary consolidation settlement S in mm.
Consolidation settlement worksheet with answers
A 2 m thick layer of normally consolidated clay (Cc = 0.45, e₀ = 1.05) has an effective vertical stress of 145 kPa at its mid-depth. A wide fill raises the vertical stress in the clay by 105 kPa. Treat the layer as one sublayer with the stresses at its mid-depth. Find the primary consolidation settlement S in mm.
A 3.5 m thick overconsolidated clay layer has Cc = 0.45, Cr = 0.04 and e₀ = 1.15. At its mid-depth the effective vertical stress is 85 kPa and the preconsolidation pressure is 145 kPa. A new building adds 40 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.
A 4 m thick overconsolidated clay layer has Cc = 0.5, Cr = 0.02 and e₀ = 0.6. At its mid-depth the effective vertical stress is 115 kPa and the preconsolidation pressure is 195 kPa. A new building adds 150 kPa of vertical stress at mid-depth. Find the primary consolidation settlement S in mm.
A clay layer 8.5 m thick has a coefficient of consolidation cv = 1.2 m²/year. It lies between two sand layers, so water drains out at the top and the bottom. For 60% average consolidation the time factor is Tv = 0.287. How many years t does the layer take to reach 60% consolidation?
A clay layer 10 m thick has a coefficient of consolidation cv = 1 m²/year. It lies between two sand layers, so water drains out at the top and the bottom. For 60% average consolidation the time factor is Tv = 0.287. How many years t does the layer take to reach 60% consolidation?
Answer key
- 1. S = 287.3 mm
- 2. S = 103.9 mm
- 3. S = 10.91 mm
- 4. S = 178 mm
- 5. t = 4.32 years
- 6. t = 7.175 years