A project costs €20 000 today and returns €3 500 at the end of each year for 7 years. The required rate of return is 5%. Find the profitability index PI.
NPV & IRR worksheet with answers
A project costs €30 000 today and returns €6 500, €11 500, €8 500, €11 500, €11 000 at the end of years 1 to 5. Assume cash flows arrive evenly through each year. Find the payback period PB in years.
An investment of €75 000 gives these cash flows at the end of years 1 to 4: €21 000, €33 000, €24 000, €34 000. The cost of capital is 15%. Find the net present value NPV.
An investment of €20 000 gives these cash flows at the end of years 1 to 4: €9 000, €7 000, €6 000, €5 000. The cost of capital is 5%. Find the net present value NPV.
An investment of €80 000 returns €19 000 at the end of each year for 10 years. Find its internal rate of return IRR in percent.
Project A costs €40 000 and returns €23 000, €14 500, €9 000 at the end of years 1 to 3. Project B costs €42 000 and returns €11 000, €18 000, €21 500. Find the crossover rate r* at which both projects have the same NPV, in percent.
Answer key
- 1. PI = 1.013
- 2. PB = 3.304 years
- 3. NPV = 3434 €
- 4. NPV = 4217 €
- 5. IRR = 19.87 %
- 6. r* = 7.193 %
Full step-by-step solutions: practise this topic on examproblems.com.