A project costs €100 000 today and returns €40 000, €38 500, €23 500, €18 500 at the end of years 1 to 4. Assume cash flows arrive evenly through each year. Find the payback period PB in years.
NPV & IRR worksheet with answers
A project costs €50 000 today and returns €21 000 at the end of each year for 3 years. The required rate of return is 12%. Find the net present value NPV.
A machine costs €80 000 today. It generates €16 500 at the end of each year for 6 years and can then be sold for €8 000. The cost of capital is 10%. Find the net present value NPV.
A project costs €100 000 today. It generates €8 000 at the end of the first year, and the cash flow then grows by 4% per year forever. The cost of capital is 10%. Find the net present value NPV.
A project costs €40 000 and returns €18 000, €14 000, €18 000 at the end of years 1 to 3. Find its internal rate of return IRR in percent.
A project costs €40 000 and returns €15 000, €20 500, €17 500 at the end of years 1 to 3. Cash flows can be reinvested at the cost of capital of 12%. Find the modified internal rate of return MIRR in percent.
Answer key
- 1. PB = 2.915 years
- 2. NPV = 438.5 €
- 3. NPV = −3622 €
- 4. NPV = 33333 €
- 5. IRR = 12.06 %
- 6. MIRR = 14.01 %