A project costs €80 000 today and returns €41 500 at the end of each year for 3 years. The required rate of return is 12%. Find the net present value NPV.
NPV & IRR worksheet with answers
A project costs €50 000 today and returns €24 000 at the end of each year for 4 years. The required rate of return is 8%. Find the net present value NPV.
A project costs €60 000 today and returns €15 000, €17 500, €27 000, €20 000, €23 500 at the end of years 1 to 5. The cost of capital is 5%. Assume cash flows arrive evenly through each year. Find the discounted payback period DPB in years.
A machine costs €50 000 today, lasts 6 years and costs €4 000 per year to run (paid at the end of each year). The cost of capital is 10%. Find its equivalent annual cost EAC.
A project costs €40 000 and returns €16 000, €17 000, €14 500 at the end of years 1 to 3. Find its internal rate of return IRR in percent.
A project costs €50 000 and returns €30 500, €21 000, €28 500 at the end of years 1 to 3. Find its internal rate of return IRR in percent.
Answer key
- 1. NPV = 19676 €
- 2. NPV = 29491 €
- 3. DPB = 3.396 years
- 4. EAC = 15480 €
- 5. IRR = 9.262 %
- 6. IRR = 28.34 %