A project costs €10 000 today and returns €3 500 at the end of each year for 4 years. The required rate of return is 5%. Find the net present value NPV.
NPV & IRR worksheet with answers
A machine is expected to save €6 000, €25 000, €12 000, €12 000 at the end of years 1 to 4, after which it is worthless. The required return is 12%. What is the most the company should pay for the machine today? Find PV.
A machine costs €40 000 today. It generates €9 000 at the end of each year for 6 years and can then be sold for €8 000. The cost of capital is 8%. Find the net present value NPV.
A project costs €30 000 today and returns €10 000 at the end of each year for 5 years. The cost of capital is 10%. Assume cash flows arrive evenly through each year. Find the discounted payback period DPB in years.
A project costs €10 000 and returns €4 000, €3 500, €3 500 at the end of years 1 to 3. Find its internal rate of return IRR in percent.
A project costs €40 000 and returns €23 000, €20 000, €21 500 at the end of years 1 to 3. Find its internal rate of return IRR in percent.
Answer key
- 1. NPV = 2411 €
- 2. PV = 41455 €
- 3. NPV = 6647 €
- 4. DPB = 3.751 years
- 5. IRR = 5.041 %
- 6. IRR = 28.76 %