A project costs €100 000 today and returns €31 000, €32 500, €24 500, €27 000 at the end of years 1 to 4. Assume cash flows arrive evenly through each year. Find the payback period PB in years.
NPV & IRR worksheet with answers
A project costs €80 000 today and returns €41 500 at the end of each year for 3 years. The required rate of return is 6%. Find the net present value NPV.
A machine costs €20 000 today, lasts 7 years and costs €2 000 per year to run (paid at the end of each year). The cost of capital is 12%. Find its equivalent annual cost EAC.
A project costs €500 000 today. It generates €24 000 at the end of the first year, and the cash flow then grows by 3% per year forever. The cost of capital is 9%. Find the net present value NPV.
A project costs €20 000 and returns €7 000, €10 500, €11 500 at the end of years 1 to 3. Cash flows can be reinvested at the cost of capital of 12%. Find the modified internal rate of return MIRR in percent.
A project costs €25 000 and returns €10 500, €12 000, €13 500 at the end of years 1 to 3. Find its internal rate of return IRR in percent.
Answer key
- 1. PB = 3.444 years
- 2. NPV = 30930 €
- 3. EAC = 6382 €
- 4. NPV = −100000 €
- 5. MIRR = 17.01 %
- 6. IRR = 19.75 %