A project costs €25 000 today and returns €7 000 at the end of each year for 8 years. The required rate of return is 12%. Find the profitability index PI.
NPV & IRR worksheet with answers
A project costs €80 000 today and returns €27 000 at the end of each year for 4 years. The required rate of return is 7.000000000000001%. Find the net present value NPV.
A project costs €100 000 today. It generates €11 000 at the end of the first year, and the cash flow then grows by 2% per year forever. The cost of capital is 11%. Find the net present value NPV.
An investment of €30 000 gives these cash flows at the end of years 1 to 3: €13 000, €8 000, €9 000. The cost of capital is 15%. Find the net present value NPV.
A project costs €25 000 and returns €17 000, €17 000, €17 000 at the end of years 1 to 3. Find its internal rate of return IRR in percent.
Project A costs €20 000 and returns €11 500, €8 000, €4 500 at the end of years 1 to 3. Project B costs €22 000 and returns €5 500, €9 500, €11 500. Find the crossover rate r* at which both projects have the same NPV, in percent.
Answer key
- 1. PI = 1.391
- 2. NPV = 11455 €
- 3. NPV = 22222 €
- 4. NPV = −6729 €
- 5. IRR = 46.27 %
- 6. r* = 2.966 %