NPV & IRR worksheet with answers

Free printable NPV & IRR worksheet: 6 problems from easy to exam level, with an answer key. Print it or save it as a PDF.

For teachers: free to print, copy and use in class. Every new worksheet has new values and its own answer key. A link to ExamProblems on your course page is appreciated.

Name: ____________________   Date: ____________

1.Easy
years0123−20 0009 0009 0009 000

A project costs €20 000 today and returns €9 000 at the end of each year for 3 years. The required rate of return is 7.000000000000001%. Find the net present value NPV.

r = 7.000000000000001%CF0 = −20 000CF1 = 9 000CF2 = 9 000CF3 = 9 000
NPV = €
2.Easy
years012345−10 0003 5003 5003 5003 5003 500

A project costs €10 000 today and returns €3 500 at the end of each year for 5 years. The required rate of return is 12%. Find the net present value NPV.

r = 12%CF0 = −10 000CF1 = 3 500CF2 = 3 500CF3 = 3 500CF4 = 3 500CF5 = 3 500
NPV = €
3.Medium
years0123…8€20 000€3 000€3 000€3 000€3 000r = 6%, EAC = ?

A machine costs €20 000 today, lasts 8 years and costs €3 000 per year to run (paid at the end of each year). The cost of capital is 6%. Find its equivalent annual cost EAC.

C0 = €20 000M = €3 000n = 8r = 6%
EAC = €
4.Medium
years01234567€60 000€5 000€5 000€5 000€5 000€5 000€5 000€5 000r = 6%, EAC = ?

A machine costs €60 000 today, lasts 7 years and costs €5 000 per year to run (paid at the end of each year). The cost of capital is 6%. Find its equivalent annual cost EAC.

C0 = €60 000M = €5 000n = 7r = 6%
EAC = €
5.Hard
years0123−40 00018 50019 50024 500

A project costs €40 000 and returns €18 500, €19 500, €24 500 at the end of years 1 to 3. Find its internal rate of return IRR in percent.

CF0 = −40 000CF1 = 18 500CF2 = 19 500CF3 = 24 500
IRR = %
6.Hard
years0123−50 00019 50029 50029 500

A project costs €50 000 and returns €19 500, €29 500, €29 500 at the end of years 1 to 3. Find its internal rate of return IRR in percent.

CF0 = −50 000CF1 = 19 500CF2 = 29 500CF3 = 29 500
IRR = %

Answer key

  1. 1. NPV = 3619 €
  2. 2. NPV = 2617 €
  3. 3. EAC = 6221 €
  4. 4. EAC = 15748 €
  5. 5. IRR = 24.72 %
  6. 6. IRR = 24.48 %

Full step-by-step solutions: practise this topic on examproblems.com.