A project costs €20 000 today and returns €7 000 at the end of each year for 4 years. The required rate of return is 7.000000000000001%. Find the net present value NPV.
NPV & IRR worksheet with answers
A project costs €100 000 today and returns €36 000 at the end of each year for 5 years. The required rate of return is 6%. Find the net present value NPV.
A machine costs €100 000 today. It generates €20 500 at the end of each year for 7 years and can then be sold for €20 000. The cost of capital is 8%. Find the net present value NPV.
A project costs €400 000 today. It generates €29 000 at the end of the first year, and the cash flow then grows by 4% per year forever. The cost of capital is 10%. Find the net present value NPV.
A project costs €40 000 and returns €26 500, €19 000, €25 000 at the end of years 1 to 3. Find its internal rate of return IRR in percent.
A project costs €25 000 and returns €9 500, €14 500, €15 000, €10 000 at the end of years 1 to 4. Cash flows can be reinvested at the cost of capital of 8%. Find the modified internal rate of return MIRR in percent.
Answer key
- 1. NPV = 3710 €
- 2. NPV = 51645 €
- 3. NPV = 18400 €
- 4. NPV = 83333 €
- 5. IRR = 35.41 %
- 6. MIRR = 21.83 %
Full step-by-step solutions: practise this topic on examproblems.com.