A project costs €10 000 today and returns €4 000 at the end of each year for 4 years. The required rate of return is 10%. Find the net present value NPV.
NPV & IRR worksheet with answers
A project costs €20 000 today and returns €3 500, €5 500, €5 000, €5 500, €8 000, €8 000 at the end of years 1 to 6. Assume cash flows arrive evenly through each year. Find the payback period PB in years.
An investment of €20 000 gives these cash flows at the end of years 1 to 3: €6 000, €7 000, €8 000. The cost of capital is 9%. Find the net present value NPV.
A machine costs €40 000 today, lasts 6 years and costs €5 000 per year to run (paid at the end of each year). The cost of capital is 8%. Find its equivalent annual cost EAC.
A project costs €25 000 and returns €7 500, €11 000, €10 500 at the end of years 1 to 3. Cash flows can be reinvested at the cost of capital of 12%. Find the modified internal rate of return MIRR in percent.
A project costs €50 000 and returns €23 000, €37 000, €36 500 at the end of years 1 to 3. Find its internal rate of return IRR in percent.
Answer key
- 1. NPV = 2679 €
- 2. PB = 4.063 years
- 3. NPV = −2426 €
- 4. EAC = 13653 €
- 5. MIRR = 8.834 %
- 6. IRR = 37.98 %